You are on page 1of 8

Workplace Safety and Health Management in Construction Industry

(WSHMCI) (BL) - Project

Workplace Safety and Health Management in Construction Industry


(WSHMCI) (BL)

Project Guidelines
This Project is one of the assessment criteria to pass the WSHMCI course and it is an
element in the blended learning requirements of the course.

The Project objective is to enable learners to conduct an inspection, submit a report


and close an inspection report.

Learners are to note the following guidelines:

Guidelines:

1. You may need a laptop/PC or other smart devices to do this project in soft copy.

2. Your report should be done in ARIAL font, size 12.

3. Your report should demonstrate your own piece of work, and not plagiarised from
other candidates completed work, or wholesale copy material.

4. There will be an oral questioning session conducted if required to verify authenticity


of your work.

5. You are required to demonstrate 5 inspection findings relating to hazards (unsafe


conditions/acts) identified in your workplace or simulations.

6. You are deemed to have completed the whole course and obtain the competency
card/certificate only after project submission and approval, in addition to all other
assessments as required in this course.

7. You will have to show your soft copy draft of the report on the 3rd day of the
course for clarifications from the trainers and upload the soft copy in Eversafe portal.

8. Your submission will be approved only when you have satisfactorily completed
the project, otherwise rejected as NYC (not yet competent).

9. Submission of your project shall be before or by the 4th day of the course.

10. If fail to submit the project report within time frame, learner need to
retake the full course.

Format of the Project as per the next page:

Eversafe Academy
Page 1 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

(Trainers: Please remind the students to delete the page 1 and 8, 9,10,11,12
before submitting the project report)

Project: Inspection Report


Participants Name:Md Nuzrul islam NRIC/FIN Number: M3219606X

Course Name: Batch ID: 1170


Workplace Safety and Health Management
in Construction Industry (WSHMCI)
Participants Phone Number:
mdnazrulislamrony96807@gmail.com 93716719

Facilitator Name:Goh Toh wei

Participants Signature: Submission Date:19/11/23

Inspection Report

1. Purpose and objectives for the safety inspection

(State any 4 or more objectives)

1) Find out safety and health risk at workplace.

2) To reduce the incident /accident at workplace.

3) Adequate the workers on hazard, their own activity at workplace.

4) Follow up rules and regulation for workplace safety and health.

Eversafe Academy
Page 2 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

2. Inspection Findings – Hazards (Unsafe conditions / unsafe acts)

Finding 1:

Picture 1
Location/Date/Time __BLK -841 1st Storey 17/11/2023-8:00am

Description of Unsafe Condition/Unsafe Act:

1. Failure to elevate the water hose. _

Possible reasons for the unsafe condition/unsafe act (Root Causes):

1. There is no provision for hanging the water hose.

2. The worker do not know, block nearest walk way residents can be tripping and fall on
the floor.

Preventive Actions:

1. To provide the hook points to hang the water hose.

2. Inform the all the workers can't lay water hose.

Eversafe Academy
Page 3 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

To rectify by: immediate Action b: md nuzrul islam

Re-inspection on (Date /Time 17/11/2023-09:00 AM

Re-inspection finding: Rectified and closed

Finding 2:

Picture 2
Location/Date/Time _BLK-840_17/11/2023-
10:00AM______________________________

Description of Unsafe Condition/Unsafe Act:

1. Poor Housekeeping in the work area.

2. Failed to provide the safety barricade around work area.

Possible reasons for the unsafe condition/unsafe act (Root Causes)

1. Didn’t cleared derbies drains, walk way.

2. Trade supervisor not ensure safety barricade around temporary storage area.

Preventive Actions:

1. Supervisor needs to ensure the regular housekeeping in the work area.

Eversafe Academy
Page 4 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

2. To ensure provide the safety barricade around work area before start work at site.

To rectify by immediate 17/11/2023 Action by Md Nuzrul islam

Re-inspection on (Date /Time ) 17/11/2022 – 10:00AM


Re-inspection finding: Rectified and closed

Finding 3:

Picture 3
Location/Date/Time __BLK 844 17/11/2023-
01:00PM______________________________

Description of Unsafe Condition/Unsafe Act:

1. Electrical equipment not update by LEW

Possible reasons for the unsafe condition/unsafe act (Root Causes):

1. Electrical tools not certified by LEW

Eversafe Academy
Page 5 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

2. Didn’t display LEW stickers on the electrical tools


_____________________________________________

Preventive Actions:

1. All electrical equipment must be check and certify safe to use by LEW

2. LEW stickers had displayed on the electrical equipment checked and certified safe to
use by LEW.

To rectify by on the day (17/11/2023) Action by Md Nuzrul islam

Re-inspection on (Date /Time 17/11/2022-04:00Pm

Re-inspection finding: Rectified and closed

Finding 4:

Picture 4
Location/Date/Time _BLK-859 17/11/2022-3:00PM_______________________

Description of Unsafe Condition/Unsafe Act:

_1.Water ponding on the bag temporary storage area


_______________________________________________________________

________________________________________________________________

Eversafe Academy
Page 6 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

________________________________________________________________

Possible reasons for the unsafe condition/unsafe act (Root Causes):

_1.Mosquito breeding
_______________________________________________________________

________________________________________________________________

Preventive Actions:

1. Supervisor needs to ensure the regular housekeeping in the work area.

2. Raining after daily check the storage area and workplace.


______________________________________________________________

____________________________________________

To rectify by: immediate Action by Md Nuzrul islam

Re-inspection on (Date /Time 17/11/2023-03:20Pm

Finding 5:

Picture 5

Eversafe Academy
Page 7 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

Location/Date/Time BLK_950 17/11/2023-04:00PM_


______________________________

Description of Unsafe Condition/Unsafe Act:

1. Failure to provide the safety barricade around gondola steel wire rope.
______________________________________________________________

Possible reasons for the unsafe condition/unsafe act (Root Causes):

2. Nearby residents walk can be tripping and fall on the floor.


_______________________________________________________________

________________________________________________________________

________________________________________________________________

Preventive Actions:

1. Supervisor needs to ensure the regular inspection site.

2. To provide safety barricade in work area.


______________________________________________________________

________________________________________________________________

________________________________________________________________

To rectify by: immediate Action by Md Nuzrul islam

Re-inspection on (Date /Time 17/11/2023-04:30Pm

Re-inspection finding: Rectified and closed

4. Recommendations to prevent the repeat of the similar findings:

1) Supervisor to remind the workers to about safety barricade during tool box
meetings.

2) Adequate the workers safety barricade shall be provided all workplace.

3) Supervisors remind the workers to do daily housekeeping

4) Regularly carry out the site inspection and conducted the STO at workplace

------------End of the Report------------