Project Guidelines
This Project is one of the assessment criteria to pass the WSHMCI course and it is an
element in the blended learning requirements of the course.
Guidelines:
1. You may need a laptop/PC or other smart devices to do this project in soft copy.
3. Your report should demonstrate your own piece of work, and not plagiarised from
other candidates completed work, or wholesale copy material.
6. You are deemed to have completed the whole course and obtain the competency
card/certificate only after project submission and approval, in addition to all other
assessments as required in this course.
7. You will have to show your soft copy draft of the report on the 3rd day of the
course for clarifications from the trainers and upload the soft copy in Eversafe portal.
8. Your submission will be approved only when you have satisfactorily completed
the project, otherwise rejected as NYC (not yet competent).
9. Submission of your project shall be before or by the 4th day of the course.
10. If fail to submit the project report within time frame, learner need to
retake the full course.
Eversafe Academy
Page 1 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project
(Trainers: Please remind the students to delete the page 1 and 8, 9,10,11,12
before submitting the project report)
Inspection Report
Eversafe Academy
Page 2 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project
Finding 1:
Picture 1
Location/Date/Time __BLK -841 1st Storey 17/11/2023-8:00am
2. The worker do not know, block nearest walk way residents can be tripping and fall on
the floor.
Preventive Actions:
Eversafe Academy
Page 3 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project
Finding 2:
Picture 2
Location/Date/Time _BLK-840_17/11/2023-
10:00AM______________________________
2. Trade supervisor not ensure safety barricade around temporary storage area.
Preventive Actions:
Eversafe Academy
Page 4 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project
2. To ensure provide the safety barricade around work area before start work at site.
Finding 3:
Picture 3
Location/Date/Time __BLK 844 17/11/2023-
01:00PM______________________________
Eversafe Academy
Page 5 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project
Preventive Actions:
1. All electrical equipment must be check and certify safe to use by LEW
2. LEW stickers had displayed on the electrical equipment checked and certified safe to
use by LEW.
Finding 4:
Picture 4
Location/Date/Time _BLK-859 17/11/2022-3:00PM_______________________
________________________________________________________________
Eversafe Academy
Page 6 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project
________________________________________________________________
_1.Mosquito breeding
_______________________________________________________________
________________________________________________________________
Preventive Actions:
____________________________________________
Finding 5:
Picture 5
Eversafe Academy
Page 7 of 8
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project
1. Failure to provide the safety barricade around gondola steel wire rope.
______________________________________________________________
________________________________________________________________
________________________________________________________________
Preventive Actions:
________________________________________________________________
________________________________________________________________
1) Supervisor to remind the workers to about safety barricade during tool box
meetings.
4) Regularly carry out the site inspection and conducted the STO at workplace
Eversafe Academy
Page 8 of 8