Manufacturing Process description sheet ISSUE NO. Page 1 of 1
Part no. Order Date---------------- Work Dispatched Date-------------------
Specify your factory in the above box Customer Name: Job O. Title of parts: Ord. Qty Part no: Pro.No. Cost Sheet No: No. 04 DPTI-002-37 DPTI-002 Ethio-Engineering group Main frame washer Material Code Material type Blank size Accessory Starting date: Delivery date: Mild steel Ф35x 1.5mm Planned time Actu perfo Depth No of Tools Measuring Inspected S/N OPRN Operation description Feed RPM Set up al rmed of Cut path Mach. Total used tools by Time time by Time Time
01 M Mill to Ф35 x 1.3
Drill throughout with Ф25 30 Drill bit 10 min 40 min 30 caliper min min NOTE: -CHECK ONE PIECE FIRST BEFORE MAKING ALL QUANTITY
Prepared by: BIRUK AND AMANUEL Approved by: ASHENAFI Issuing dept.: R & D(EEG) Receiving company: