No Date Location Observations PHOTO Owner RECOMMENDATION Post Action Photo Status
Machine Guarding
Protective cover on high pressure
2017
2 NOV North S/S directly under crane’s boom fall General TBM and educate
2017 pick-up area trajectory. people to stay away from
crane’s boom fall trajectory.
PPE
24 Boiler 1 Worker doing chipping works MAINTAIN adherence for
3 NOV Foundation wearing prescribed eye and face every worker’s safety and
2017 Southside PPEs, i.e. Full face-shield over welfare. INFO
JEL
clear lensed eye-glasses,
Housekeeping Action
24 Boiler 1 with its steel cover removed install pipe barricade around
MES
7 NOV concrete fdn. NOT barricaded. this opening for every workers
2017 floor A fall of person potential at this security from fall into
JEL
East side location. manhole at this location Done
regardless of company.
Completed
Housekeeping
TG 1 Construction materials mostly of Collect and re-arrange
24 Northwest of wooden pieces scattered around materials to acquire clear
10 NOV S/S pedestal working area occupying space. unobstructed passage and
2017 working area
PPE
TG 1 Prescribed PPE usage Continuous education
24 Toilet Cubicle compliance improvement required in proper use of
11 NOV South side noticeable…but few are not chin strap and eye-glass as
2017 properly using well
helmet-chin-straps.
Inspection / Tagging
Cantilever scaffold NO Tag…if to
22 TG 1 be:
12 SEP Southside Modified?/Dismantled?/Erection Immediate action required
2017 column in-complete?
Access / Egress
22 TG 1 Sub-standard foot-bridge, loose
SEP West end not rigid, NO hand-rail. Immediate action required
13 2017 boundary with
TG 2 Rectification required
• Maintain designated clearly identified access around areas of activity, due to congestion of equipments.
• Re-arrange all materials properly that it should not occupy working areas/spaces.
• PPE usage by all personnel should be improved. All parties should share similar goal.
• Two (2) nail puncture injuries in a row is a lesson learned THAT ALL protruding nails from wooden
• Helmet chin-strap usage should be instilled into workers mind until it becomes a habit.
• Hearing protection (era-defender) should be worn during use of high intensity sound emitting power tools,
• Workers should be educated NOT TO wear dark-shade eye-glasses during night or in locations where lights is in-adequate.