Saudi Arabian Trading and Construction Company

Risk Analysis
Department/Section SATCO
Risk Assessment No. : 002 Work Description : Excavation and backfilling for the playground area at area F Date 14-May-08
Location/Area : F Revision Code 001
No. Activity Hazard Hazardous Effect Corrective Measurements Risk
1 Excavation of foundation Worker slip in excavated area, Body injuries to the operator and workers Authorized and licensed operator and MEDIUM
by excavator tripping it off balance of excavator flagman are present during excavation
Always barricade the area during
excavationon-going and only key person
inside the barricaded area

2 Shuttering and steel fixing Improper handling of materials such Injuries to the workers at site Observe proper movement during working LOW
as steel, plywood and lumber with others and always wear proper PPE
at all times during work at site

3 Pouring concrete by the Worker holding discharge pipe out Fructures Do not go against the direction of the LOW
use of pump or transit of balance pump discharge pipe and observed
mixer proper position

4 Removal of forms and Leaving and scattering of nails on Nail injuries Proper housekeeping must always be LOW
bracing wood or plywood observed after finishing the daily work

Prepared by : Reviewed by : Approved :

Ariel B. Celino Reijo Niinikosski


Site Engineer/Supervisor Construction Manager Project Manager
Signature over printed name