JOB SAFETY ANALYSIS Ref No: HSE


BIG POURS/ MASS CONCRETE Rev No:
Page
Prepared By Reviewed By:
Date 22-Jun-16
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Low Medium High Preventaive Meaures Low Medium High

1 Collapse of pump due to fatality,personal H -sole plates for placement below M construction manager
ground condition /inadequate injury ,property damage outrigger feet to support the site engineer and site
ground bearing. pump outriggers. supervisor

construction manager
Overturning of pump /collapse fatality, personal H -- concrete pump operator shall site engineer and site
of boom due to insufficient injury,permanent ensure that outriggers are M supervisor
2 stability. disability.property damage extended to the appropriate
position.
construction manager
Workers can be struck by site engineer and site
moving objects/vehicle Fatality,Personal --safe operating procedure (SOP) supervisor
movement (reversing) crushing injury,permanent disability. H must be implemented. L
3 or traping of workers when --safe working zone '' clearly
moving pump to work position defined in areas where the CTM
on site ,or by and other vehicles are to be
uncontrolled ,unexpected of used.
the work piece, concrete --PPEs must use during job
mixer ,dumper ,loader activity.
--provide a competent person to construction manager
act as a banksman during reverse site engineer and site
movements. supervisor
Slip ,trip or fall due to the Personal injury ,permanent
working environment or other disability. --slips ,trips and falls are more L
factor, ie ,poor house M likely when working on uneven
keeping ,slippery or uneven ground.A level and even surface
work surfaces, power cables is to be established when
locating
4
Project
JOB SAFETY ANALYSIS Ref No: HSE
BIG POURS/ MASS CONCRETE Rev No:
Page
Prepared By Reviewed By:
Date 22-Jun-16
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Low Medium High Preventaive Meaures Low Medium High

across work Areas causing CTM,loader , mobile stationary


injuries and abrasions. pump etc prior to use .
--Remove all waste material
around the area.

Envirnoment
-- all portabel machinery and
i.Noise. It is likely that normal long term exposure to equipments must regullary
5 operation of this activity will excessive noise could lead to M maintained to reduce high L construction manager
produce excessive Noise level hearing loss. noise ,viberation ,temprature site engineer and site
and dust level. supervisor
ii.Hot weather conitions. --All portable machinery and
Heat stress ,heat M equipments maintenance
cramps ,heat documented in a register. L
rashes,dehydration ,sunburn. --.Engineering control or physical
changes such as mandatory
iii. Air born dust particles toxic machinery guarding or
fumes, Workers can suffer in enclosures must use. L
respiratory issue and internal M --extreme weather conditions
organ disorder. that may contribute to workers
discomfort and workplace safety
must consider with priority.
--Appropriate PPEs must use
during job activity.
--limit noise exposure
Project
JOB SAFETY ANALYSIS Ref No: HSE
BIG POURS/ MASS CONCRETE Rev No:
Page
Prepared By Reviewed By:
Date 22-Jun-16
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Low Medium High Preventaive Meaures Low Medium High
Project
JOB SAFETY ANALYSIS Ref No: HSE
BIG POURS/ MASS CONCRETE Rev No:
Page
Prepared By Reviewed By:
Date 22-Jun-16
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Low Medium High Preventaive Meaures Low Medium High

6 Electrical Electrocution or death due to H -visual checks of all portable M construction manager
Worker can be injured by electrical shock power tools ,their electrical site engineer and site
electrical shock due to working Electrical shock swiches plugs and power leads. supervisor
near or contacting with Burns -Electrical safety
damaged or poorly maintained inspection ,testing ,etc must
live electrical conductors such regullary as per guaidance for all
as power outlet ,extension portable power tools.
leads ,safety switches ,starter -portable power tools must use
or causal water on the floor . only where there is a RCD safety
Trip switch conneceted.
-warning ''Danger'' sign must
post on electrical pannel.
-Appropriate PPEs must use
during job activity.

Cement products,hazardous - Job rotation of the workers to


substances Dermatitis ,fresh concrete minimize the exposure time of
has caustic effect due to M the hazards. L construction manager
its alkaline nature.skin and - Post mandatory signs .wear site engineer and site
eyes may infected.They may PPEs and RPE supervisor
possibly suffer with - Ensure proper inspection and
respiratory issue and internal health surveillance.
7 organ disorder. Exposure to -Give awareness to employees
cement dust can irritate about health issues, danger of
eyes, nose, throat and the breathing in air born cement
upper respiratory / cracking particles.
of skin to serve skin damage -Provide these workers with
from chemical burns. proper breathing masks and
goggles. Avoid their
electrical shock due to working Electrical shock swiches plugs and power leads. supervisor
near or contacting with Burns -Electrical safety
damaged or poorly maintained inspection ,testing ,etc must
live electrical conductors such regullary as per guaidance for all
as power outlet ,extension portable power tools.Project
leads ,safety switches ,starter JOB SAFETY ANALYSIS -portable power toolsRef No:use
must HSE
or causal water on the floor . only where there is a Rev
RCDNo:
safety
BIG POURS/ MASS CONCRETE Trip switch conneceted.
Page
-warning ''Danger'' sign must
Prepared By Reviewed
post By: pannel.
on electrical
-Appropriate
Date PPEs must use
22-Jun-16
during job activity.
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Cement products,hazardous Low Medium High - Job rotation of theMeaures
Preventaive workers to Low Medium High
substances Dermatitis ,fresh concrete minimize the exposure time of
has caustic effect due to M the hazards. L construction manager
its alkaline nature.skin and - Post mandatory signs .wear site engineer and site
eyes may infected.They may PPEs and RPE supervisor
possibly suffer with - Ensure proper inspection and
respiratory issue and internal health surveillance.
7 organ disorder. Exposure to -Give awareness to employees
cement dust can irritate about health issues, danger of
eyes, nose, throat and the breathing in air born cement
upper respiratory / cracking particles.
of skin to serve skin damage -Provide these workers with
from chemical burns. proper breathing masks and
goggles. Avoid their
Project
JOB SAFETY ANALYSIS Ref No: HSE
BIG POURS/ MASS CONCRETE Rev No:
Page
Prepared By Reviewed By:
Date 22-Jun-16
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Low Medium High Preventaive Meaures Low Medium High

skin contact with the cement


chemical.
-provide eye washing facility

Ergonomics and Manual Musculosketal -Documented safe work


Handling disorders ,including sprain M procedures L construction manager
Workers has to perform manual and strain -provide mechenical Aids. site engineer and site
8 task involving heavy lifting and -provide training in safe manual supervisor
lowering ,pushing,pulling ,or handling techniques.
carrying ,bending ,stretching -Appropriate PPEs must wear
and repetitive during job activity.
motion ,awkward posture
etc,such task then contribute to
a range of musculoskeletal
sprains and strains for workers.

Explosion and fire


-fire extinguisher must available
Fire can be occur due to poor H on work area. M construction manager
house keeping ,stored Fatality, burn,personal -safety sign must post on working site engineer and site
flammable material,ie petrol, injury.damage to plant and area. supervisor
Diesel ,kerosene oil,paint,etc eqipments. -Remove flamable and
9 combustible material from
working Area.
-Appropriate proper PPEs must
wear during job.
-provide eye washing facility

Ergonomics and Manual Musculosketal -Documented safe work Project


Handling JOB,including
disorders SAFETY sprain ANALYSIS
M procedures Ref No: L HSE construction manager
Workers has to perform manual and strain -provide mechenical Aids. site engineer and site
8 BIG POURS/ MASS CONCRETE
task involving heavy lifting and
Rev No:
-provide training in safe manual supervisor
lowering ,pushing,pulling ,or handling techniques. Page
Prepared By ,bending ,stretching
carrying Reviewed By:
-Appropriate PPEs must wear
and repetitive during
Date job activity. 22-Jun-16
motion ,awkward posture
etc,such task then contribute to Risk Level Residual Risk Level
Control Measures/
S.NO a rangeJob
of musculoskeletal
Steps / Task Hazard Responsible
sprains and strains for workers. Low Medium High Preventaive Meaures Low Medium High

Explosion and fire


-fire extinguisher must available
Fire can be occur due to poor H on work area. M construction manager
house keeping ,stored Fatality, burn,personal -safety sign must post on working site engineer and site
flammable material,ie petrol, injury.damage to plant and area. supervisor
Diesel ,kerosene oil,paint,etc eqipments. -Remove flamable and
9 combustible material from
working Area.
-Appropriate proper PPEs must
wear during job.