Professional Documents
Culture Documents
Job Safety Anylsis
Job Safety Anylsis
1 Collapse of pump due to fatality,personal H -sole plates for placement below M construction manager
ground condition /inadequate injury ,property damage outrigger feet to support the site engineer and site
ground bearing. pump outriggers. supervisor
construction manager
Overturning of pump /collapse fatality, personal H -- concrete pump operator shall site engineer and site
of boom due to insufficient injury,permanent ensure that outriggers are M supervisor
2 stability. disability.property damage extended to the appropriate
position.
construction manager
Workers can be struck by site engineer and site
moving objects/vehicle Fatality,Personal --safe operating procedure (SOP) supervisor
movement (reversing) crushing injury,permanent disability. H must be implemented. L
3 or traping of workers when --safe working zone '' clearly
moving pump to work position defined in areas where the CTM
on site ,or by and other vehicles are to be
uncontrolled ,unexpected of used.
the work piece, concrete --PPEs must use during job
mixer ,dumper ,loader activity.
--provide a competent person to construction manager
act as a banksman during reverse site engineer and site
movements. supervisor
Slip ,trip or fall due to the Personal injury ,permanent
working environment or other disability. --slips ,trips and falls are more L
factor, ie ,poor house M likely when working on uneven
keeping ,slippery or uneven ground.A level and even surface
work surfaces, power cables is to be established when
locating
4
Project
JOB SAFETY ANALYSIS Ref No: HSE
BIG POURS/ MASS CONCRETE Rev No:
Page
Prepared By Reviewed By:
Date 22-Jun-16
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Low Medium High Preventaive Meaures Low Medium High
Envirnoment
-- all portabel machinery and
i.Noise. It is likely that normal long term exposure to equipments must regullary
5 operation of this activity will excessive noise could lead to M maintained to reduce high L construction manager
produce excessive Noise level hearing loss. noise ,viberation ,temprature site engineer and site
and dust level. supervisor
ii.Hot weather conitions. --All portable machinery and
Heat stress ,heat M equipments maintenance
cramps ,heat documented in a register. L
rashes,dehydration ,sunburn. --.Engineering control or physical
changes such as mandatory
iii. Air born dust particles toxic machinery guarding or
fumes, Workers can suffer in enclosures must use. L
respiratory issue and internal M --extreme weather conditions
organ disorder. that may contribute to workers
discomfort and workplace safety
must consider with priority.
--Appropriate PPEs must use
during job activity.
--limit noise exposure
Project
JOB SAFETY ANALYSIS Ref No: HSE
BIG POURS/ MASS CONCRETE Rev No:
Page
Prepared By Reviewed By:
Date 22-Jun-16
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Low Medium High Preventaive Meaures Low Medium High
Project
JOB SAFETY ANALYSIS Ref No: HSE
BIG POURS/ MASS CONCRETE Rev No:
Page
Prepared By Reviewed By:
Date 22-Jun-16
Risk Level Residual Risk Level
Control Measures/
S.NO Job Steps / Task Hazard Responsible
Low Medium High Preventaive Meaures Low Medium High
6 Electrical Electrocution or death due to H -visual checks of all portable M construction manager
Worker can be injured by electrical shock power tools ,their electrical site engineer and site
electrical shock due to working Electrical shock swiches plugs and power leads. supervisor
near or contacting with Burns -Electrical safety
damaged or poorly maintained inspection ,testing ,etc must
live electrical conductors such regullary as per guaidance for all
as power outlet ,extension portable power tools.
leads ,safety switches ,starter -portable power tools must use
or causal water on the floor . only where there is a RCD safety
Trip switch conneceted.
-warning ''Danger'' sign must
post on electrical pannel.
-Appropriate PPEs must use
during job activity.