Professional Documents
Culture Documents
12 Jan 2018 - Site Mgt. Joint Site HSE Inspection TG-Boiler 1 - Team A
12 Jan 2018 - Site Mgt. Joint Site HSE Inspection TG-Boiler 1 - Team A
HOUSE-KEEPING
TG steel Stripped out construction
HOUSE-KEEPING
12 TG steel
UNSAFE CONDITION
12 TG steel Vertical rebar without tip
3 JAN Structure protection. An injury CORRECTIVE ACTION
2018 Erection hazard to personnel using TNJO REQUIRED OPEN
west-side this muddy and slippery
Access-way passage-way
SIGNS, SIGNAL,BARRICADE
12 High pressure hose
4 JAN TG gfl. North manifold not isolated of TNJO CORRECTIVE ACTION
2018 east side being “Dangerous Area” REQUIRED OPEN
MATERIAL STORAGE MGT.
Birdcage scaffold
HOUSE-KEEPING
12
6 JAN Mezzanine 1 Several solid loose materials CORRECTIVE ACTION
2018 North west left on elevated work TNJO REQUIRED OPEN
platforms not properly
managed from falling down.
TEMPORARY ELECTRICS
In service temporary
12 TG 1 electrical distribution panel CORRECTIVE ACTION
7 JAN Mezzanine padlock (in open position) TNJO REQUIRED OPEN
UNSAFE PRACTICE
12 TG 1
8 JAN Column west Worker at height not hooked up CORRECTIVE ACTION
2018 from of his FBH lifeline (lanyard) TNJO REQUIRED OPEN
Mezzanine flr.
UNSAFE ACT
TG 1 1) Worker at height not
FIRE PROTECTION/PREVENTION
UNSAFE CONDITION/Practice
1. Drift pin (placed on top flange)
5
12 TG 1 2. Loose metal bolts not CORRECTIVE ACTION
3
11 JAN Mezzanine flr. contained from falling
2 TNJO REQUIRED OPEN
UNSAFE PRACTICE
TG 1 Worker freely scaling down
12 Northwest access ladder not clipped any TNJO CORRECTIVE ACTION
12 JAN column from of his lanyard hooks for fall REQUIRED OPEN
TEMPORARY ELECTRICS
12 TG 1 Electrical power outlet with
14 2018 Northside risk of rain water seeping into TNJO CORRECTIVE ACTION OPEN
gang-way energized connection inside REQUIRED
that could result to flash-overs
and electric shock
SCAFFOLDINGS / LADDERS
TG 1 Unsecured single metal plank
HOUSE-KEEPING
TG 1 Adjustable base-plate for
12 Westside scaffolding left on work
16 JAN platform platform not secured TNJO CORRECTIVE ACTION OPEN
UNSAFE PRACTICE
12
JAN FBH harness lanyard shortened by TNJO Discuss during General TBM
18 2018 COMMON making a loop of the lifeline. JEL HSE to monitor compliance Closed
No Date Location Observations PHOTO Owner RECOMMENDATION Post Action Photo Status
HARNESS / LIFELINES
Work Plan Procedure (WPP) and Boiler Group in-charge to
12 West of JHA required for access stairway provide the required
1 JAN Boiler 1 installed on Boiler structure JEL WPP at the earliest OPEN
ENVIRONMENTAL
Make an Hole of pail which use for
Pail used as welding stub collecting welding stub , segerated
domestic waste to other waste bin
12 container mixed with Make holes /perforations at the
3 JAN Boiler 1 domestic rubbish soaked in JEL bottom of the container to Closed
ACCESS / EGRESS
12 Structural steel materials stored Establish common
JAN Boiler 1 without giving consideration to JEL access/passages around these
5 2018 common access/passage of steel materials storage marked Closed
personnel. A foot injury and fall by warning tapes for
of person due to trips by this awareness
steel members.
General Comments:
TNJO and JEL
3. Fullbody Harrness lanyard 100% hook up during movement at heights should be strictly
enforced. (Refresher safety training REQUIRED to all operatives assigned to work at heights)
4. Safety Inspectors to lead by example by wearing FBH lanyards properly (not shortened by tying)
The next Joint Site Management weekly HSE Inspection will be on:
NOTE: All attendees shall bring/wear Full Body Harness (FBH) High elevations inspection
may be carried out at Turbine Generator area.