You are on page 1of 1

HYDRAULIC CALCULATION REPORT

Name of work :-
CONDUCTING GEOTECHNICAL INVESTIGATION (INCLUDING STATION
BUILDINGS), PREPARATION OF ESP OF STATIONS, DETAILED
STRUCTURAL DRAWINGS FOR STATION BUILDINGS, QUARTERS, GAD &
DETAILED DESIGN DRAWINGS OF MAJOR BRIDGES, MINOR BRIDGES,
ROBS & RUBS INCLUDING ITS APPROACHES, ETC. INCLUDING MARKING
OF CENTRE LINE OF PROPOSED ALIGNMENT, FIXING OF BOUNDARY
STONES ON BOTH SIDES OF ALIGNMENT AND AT JUNCTIONS OF ROW,
COUNTING OF TREE AND GIRTH MEASUREMENT, ETC. FROM CHAINAGE
KM 157 (EXCLUDING DIGRAS STATION) TO KM. 285.5 (EXCLUDING
NANDED STATION) IN CONNECTION WITH YAVATMAL-NANDED NEW
B.G. LINE PROJECT IN STATE OF MAHARASHTRA, INDIA

Chainage :- 169.821Km

Client :-

RAIL VIKAS NIGAM LIMITED


(A GOVERNMENT OF INDIA ENTERPRISE)

Prepared By:

C. E. Testing Company Pvt. Limited


An ISO 9001, 14001 & OHSAS 18001 Cerified Company
NABL Accredited Laboratory
124A, N.S.C. Bose Road: Kolkata - 700 092

You might also like