Soil to Air Interface Piping Inspection Workflow

Fixed Equipment Integrity


Inspector OSI/NDE Coordinator Maintenance Team
Engineer

Piping circuitization and


specific DMI

Develop circuit isometric


drawing

Site survey piping location


and issue ITP

Determine the susceptibility


level and pipe class
VT of pipe condition and
NDE execution for
verifying the coating/
above grade condition
wrapping damage

NO
Good condition

YES

NO YES
Excavation need?

NO Remove wrapping/coating

NPS ≥ 4" and GWUT


is used

YES

NO NDE execution for Excavation and


Severe corrosion
below grade condition Remove wrapping/coating

YES

Provide repair Maintenance and repair


reccomendation process

Issue Inspection Report