You are on page 1of 2

Anti-Collision Work Flow

Schlumberger Private
Client / Schlumberger Anti-Collision Standard
Confirm with client their anti-collision Standard

NO
Is there a centralized survey Central Survey Database
database for the GeoMarket? Import all existing survey databases into
centralized GeoMarket database
YES

Drilling Office Database


Perform survey QC checks on definitive surveys and
check for constituent survey tools
NO

YES
Optimize Well Design YES Safe to continue Drilling?

Can the survey program (subject & Offset)


be redesigned for OSF > 1.5 and meet
Optimize Survey Program surface rules?
Stop Drilling & Reassess
(Subject & Offset Wells)
NO
YES
Can the well be geometrically YES
redesigned for OSF > 1.5 and NO
Close Approach : Run global well-head scan Any Deviation from Plan?
meet surface rules?
Anti-Collision Scan at 10 m: 3-D & Normal Plane at
95% confidence. Run MagScan
NO

YES Enter into Quest & Create Action Plan


YES
Can Offset Well be re-surveyed?
Will there be Magnetic Interference from
Offset Wells? Execute the Well Plan
NO
NO
Gather Data for Offset Wells at Risk
Generate Reports & Plots Status, Flow Rate, Fluids, Pressures, Completions,
Plug below zone of collision, Kill mud weight required Are A/C Exemption Conditions NO
Anti-Collision Report:
Summary: 3D, Normal Plane, Detailed: 3D, Normal Plane Monitored?
MagScan Report:
Spider Plots: YES
Traveling Cylinder Plots (as needed): Apply for A/C Exemption & Enter into Quest
Normal Plane, North Reference

Well Drilled to TD

YES
NO
A/C Exemption Granted?
Are all Oriented Separation Factors
(OSF) > 1.5? Audited by Sign-off Authority
NO
YES
Discuss with client changes required
Surface Hole Rules satisfied? NO to allow the well to be drilled
NO
Separation > 80% of ADP or 10M
Conform to Safety rules? Enter into Quest & Create Action Plan

YES
YES
YES
Finalize Well Design
Discuss well design with Client, Traveling Cylinders Any A/C Exemption? NO
with Tolerance lines and Spider Plots Any A/C Exemption?
End of A/C Process

NO YES
Sign Off
Final design and plots signed off by DEC, D&M line NO
Management and client
Conforms to A/C Exemption ?

YES
Anti-Collision Work Flow

Schlumberger Private
Client / Schlumberger Anti-Collision Standard
Confirm with client their anti-collision Standard

NO
Is there a centralized survey Central Survey Database
database for the GeoMarket? Import all existing survey databases into
centralized GeoMarket database
YES

Drilling Office Database


Perform survey QC checks on definitive surveys and
check for constituent survey tools
NO

YES
Optimize Well Design YES Safe to continue Drilling?

Can the survey program (subject & Offset)


be redesigned for OSF > 1.5 and meet
Optimize Survey Program surface rules?
Stop Drilling & Reassess
(Subject & Offset Wells)
NO
YES
Can the well be geometrically YES
redesigned for OSF > 1.5 and NO
Close Approach : Run global well-head scan Any Deviation from Plan?
meet surface rules?
Anti-Collision Scan at 10 m: 3-D & Normal Plane at
95% confidence. Run MagScan
NO

YES Enter into Quest & Create Action Plan


YES
Can Offset Well be re-surveyed?
Will there be Magnetic Interference from
Offset Wells? Execute the Well Plan
NO
NO
Gather Data for Offset Wells at Risk
Generate Reports & Plots Status, Flow Rate, Fluids, Pressures, Completions,
Plug below zone of collision, Kill mud weight required Are A/C Exemption Conditions NO
Anti-Collision Report:
Summary: 3D, Normal Plane, Detailed: 3D, Normal Plane Monitored?
MagScan Report:
Spider Plots: YES
Traveling Cylinder Plots (as needed): Apply for A/C Exemption & Enter into Quest
Normal Plane, North Reference

Well Drilled to TD

YES
NO
A/C Exemption Granted?
Are all Oriented Separation Factors
(OSF) > 1.5? Audited by Sign-off Authority
NO
YES
Discuss with client changes required
Surface Hole Rules satisfied? NO to allow the well to be drilled
NO
Separation > 80% of ADP or 10M
Conform to Safety rules? Enter into Quest & Create Action Plan

YES
YES
YES
Finalize Well Design
Discuss well design with Client, Traveling Cylinders Any A/C Exemption? NO
with Tolerance lines and Spider Plots Any A/C Exemption?
End of A/C Process

NO YES
Sign Off
Final design and plots signed off by DEC, D&M line NO
Management and client
Conforms to A/C Exemption ?

YES

You might also like