You are on page 1of 1

The Construction and Completion of Earthworks and Infrastructure Works for Cadangan Pembangunan Kawasan Perindustrian Lembah

Chuping (KPLC)/Chuping Valley Industrial Area (CVIA) Phase 1 in Chuping, Perlis for the Northern Corridor Implementation Authority (NCIA)

Scheduled Wastes Storage Inspection

Date: 07th Jan 2022

Adequate signages are installed and put up clearly The entire storage area is fenced-in, locked
at the access of storage area. and regarded as restricted area

All scheduled wastes are properly segregated and stored All containers are properly and clearly labelled
in a proper container based on compatibility as specified in the regulations

Sump pit connected to perimeter through channel


Spill kit available at the storage area
to contain the accumulated spill in the storage area