Scheduled Wastes Storage Inspection

Date : 21st Aug 2021

Adequate signages are installed and put up The entire storage area is fenced-in, locked
clearly at the access of storage area. and regarded as restricted area.

All scheduled wastes are properly segregated and stored in


a proper container based on compatibility.

Sump pit was provided to contain the


Spill kit available at the storage area.
accumulated spill in the storage area.

MTD Construction Sdn Bhd