SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 1 OF 155
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 2 OF 155
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 3 OF 155
CONTENTS
1. GENERAL 4
1.1. Scope and Field of Application 4
1.2. Terms and definitions 4
3. APPLICABLE DOCUMENTATION 11
3.1. Reference documents 11
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 4 OF 155
1 GENERAL
3 This document provides guidance and minimum requirements for inspecting, checking
and testing related to the electrical works to be performed during construction of
Menzel Ledjmet East Project..
4 This document is additional to QAS No. 000-ZA-E-09609 and QAS No. 000-ZA-E-
09610 already given to Construction SubContractor and shall be read together with
other applicable contractual documentation.
5 This document covers the checks and tests to be carried out on electrical installations
during construction and/or before start up and lays down general criteria for defining
when and in which conditions the checks and the tests can be performed.
The document does not cover the checks and tests to be carried out on already
mounted in the Manufacturer’s workshop on machines frames, skids and structures.
All the checks and tests described on the attached documents generally refer only to
new electric installations of normal execution.
Special tests may be added, based on instructions given by suppliers of equipment
and materials or on the basis of the provisions of the reference standards.
Construction
SubContractor(s) Organisation(s), including its sub-contractors to whom any part of the
Works has been subcontracted by Saipem/Company;
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 5 OF 155
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 6 OF 155
For the correct interpretation of the contents of this specification and the documents
mentioned herein, the meaning of specific terms shall be construed as follows:
Shall Indicates or refers to a “mandatory requirement”.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 7 OF 155
Checks and tests The set of testing activities to be carried out on electrical
after energizing equipment and systems when powered.
They consist in executing off-load efficiency and
functionality tests, under on-line voltage.
Performance test The last step of testing prior to plant start-up. It consists
of on-load performance tests. It can involve a single
electrical item of equipment or set of equipment or
systems associated with a specific process plant subject
to contractual testing and measurement methods.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 8 OF 155
Area lighting system All the lighting equipment (circuits, fixtures, boxes,
receptacles) provided for the illumination of an area of
the plant (process, storage, parking areas, plant unit,
road, forecourts, tanks, others). Common or different
switchgear(s) can feed the lighting fixtures and the
relevant circuits.
Civil building Civil prefabricated building arranged with its own power
and control electrical devices used to supply non
industrial processes inside the building.
They can accommodate power and control devices to be
used to supply industrial processes outside the building.
They are substations, control rooms, offices, domestic
rooms, mess rooms; reception rooms, others.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 9 OF 155
Electrical switchyard open area installation used for housing all the equipment
necessary to arrange the electrical interconnection with
the network external to the plant.
11 This document includes the ITP(s), listed under paragraph 5, for performing as
minimum, the inspection, tests and certification to be carried out during site activities
related to electrical works.
12 The enclosed ITP(s) are specific and they include inspection and tests which are
directly related to specific project items and or part of the Works that can be identified
and traceable through engineering documentation.
14 Construction SubContractor has issued this document “Quality Control Plan” (QCP)
same as the approved “Quality Control Specification” (QCS), improving the enclosed
ITPs in accordance to the project requirements and completing the information
requested on clause 3.1 and the ITPs columns “Reference document” & “Acceptance
Criteria”
15 If during Works Construction SubContractor will need additional ITP/ ITP phase for
further test and checks with the relevant QC Codes, the same shall be numbered
adding an alphanumeric suffix to the preceding available QC Code. New QC Codes
shall be submitted and approved by Saipem.
16 Construction SubContractor during the execution of the Works shall revise and update,
as and when required, the QCP(s) and relevant ITP(s) to incorporate any other
pertinent requirements set forth in engineering specifications, standards, design codes,
recommended practices, safety design, referred hereafter or included elsewhere in the
contractual and vendors documents.
17 Before starting of Works, the QCP containing the ITPs applicable for the project items
and works, shall be submitted by the Construction SubContractor for Saipem review
and approval.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 10 OF 155
19 Construction SubContractor shall prepare and update any other necessary QCP(s) and
ITP(s), CDQ and FTC forms and quality procedures to include all inspections,
examinations and tests required to verify the quality of the Works. The above
documents shall be timely submitted to Saipem for review and approval in order to
ensure their availability in approved status prior to starting of the activities related to
electrical works.
20 Construction SubContractor shall perform and record all inspections, examinations and
tests required and shall carry out all the works necessary for the preparation of
inspections, examinations and tests, including adequate scaffolding for safely
witnessing the inspection.
21 Construction SubContractor shall provide, for the execution of testing, inspection and
measurements all necessary equipment, tools and shall make available the applicable
international Standards and Codes.
23 Saipem and other Parties signature on inspection, examination and test reports does
not release the Construction SubContractor from his responsibilities.
24 Construction SubContractor shall have at his own charge the filing of the relevant QCP
form certificate on dedicated Dossiers as specified on SPC. 000-ZA-E-09609 and SPC.
000-ZA-E-09610, at the time required for the mechanical completion phases the
Construction SubContractor will deliver to Saipem hard copies and PDF file of the
dossiers.
25 Before starting with the electric testing activities, a programme of checks and tests
shall be prepared and take into account the following requirements, as a minimum:
- composition of the electrical system;
- operating requirements of parts (units) of the installation;
- interconnection state between the electrical system and other equipment/systems;
- electrical systems or parts involved versus operating requirements;
- effects that the programme of checks and tests may have on the site works
programme.
The programme will be subdivided into different phases arranged in chronological
sequence able to guarantee the linear performance of testing. Specific attention will be
paid to minimise the overlapping of activities that can oblige the repetition of some
testing steps.
26 Local regulations
27 Inspections and tests required by Algerian law and regulation shall be strictly adhered
to, documented by Construction SubContractor and shall take precedence over this
specification.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 11 OF 155
28 When Algerian law and local regulations are different from the applicable design
codes, Construction SubContractor shall inform SAIPEM for the necessary actions.
29 APPLICABLE DOCUMENTATION
30 Reference documents
31 Project specifications:
- 00-EA-E-40000; MLEG-00-TP-E-00OO-01 – Electrical Design Criteria
- 00-EA-E-40010; MLEG-00-SP-E-00OO-01 – Electrical Installation and Testing Specification
- 10-ED-B-43290; MLEG-CPF-DD-E-88EL01 – Typical Installation Details for
Power/Lighting/Earthing
- 000-ZA-E-09609 - MLEG-00-AS-MC-00OO09 Quality Assurance Requirements for
Construction SubContractors
- 000-ZA-E-09610 - MLEG-00-AS-MC-00OO10 Quality Control Requirements for
Construction SubContractors
Applicable Codes and Standards are those referred in the Contract reference “Code &
Standards” doc. 00-ZA-E-09008 - MLEG-00-AP-A-00OO28, in the above specifications
and in engineering documentation
Operating requirements for testing to be carried out at Site are defined in specific
project specifications and in sections or paragraphs of SPC. 00-EA-E-40010, and 00-
ZA-E-09008 for the applicable code of the acceptance criteria for inspections, checks
and tests of the electrical installations.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 12 OF 155
34 ITP List
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 13 OF 155
35 MDT List
MDT_CDQ list
MDT_EL_CDQ_020 Checks before energizing power MDT_EL_CDQ_0354 Control Panel, Inspections and
3 transformers checks before energising the
electrical installation
MDT_EL_CDQ_020 Power transformers - checks/test MDT_EL_CDQ_0355 Control Panel Checks and tests -
4 commissioning commissioning
MDT_EL_CDQ_021 Power switchgears and equipments MDT_EL_CDQ_0364 Generator
3 Inspections and checks before Inspections and checks before
energising the electrical installation
starting the primary machine
MDT_EL_CDQ_021 Power switchgears and equipments - MDT_EL_CDQ_0365 Controlgear (excitation system)
4 functionality checks Inspections and checks before
starting the primary machine
MDT_EL_CDQ_021 Power switchgears and equipments MDT_EL_CDQ_0366 Short circuit tests and measurements
5 Checks and tests -commissioning (reduced voltage test)
MDT_EL_CDQ_022 Dc/ac uninterruptible power supply MDT_EL_CDQ_0367 Synchronous generators
3 switchgears and storage batteries No-load test-run
Inspections and checks before
energising the electrical installation
MDT_EL_CDQ_022 Dc/ac uninterruptible power supply MDT_EL_CDQ_0368 Synchronous generators
4 switchgears and storage batteries Synchronization checks and tests
Checks and tests -commissioning
MDT_EL_CDQ_023 Medium voltage induction motors MDT_EL_CDQ_0369 Synchronous generators
3 Inspections and checks before performance test after synchronization
energising the electrical installation
MDT_EL_CDQ_023 Medium voltage induction motors MDT_EL_CDQ_0416 Electrical systems in civil buildings-
4 Motor Run Checks and tests - Inspections and checks before
commissioning energising the electrical installation
MDT_EL_CDQ_024 Low voltage induction motors MDT_EL_CDQ_0417 Electrical systems in civil buildings
3 Inspections and checks before Checks and tests -commissioning
energising the electrical installation
MDT_EL_CDQ_024 Low voltage induction motors MDT_EL_CDQ_0421 Electrical systems in electrical
4 Checks and tests -commissioning substation buildings
Final visual inspection for transformer
bay - switchgear room - cable room -
battery room
MDT_EL_CDQ_024 Solar power generator set-Checks MDT_EL_CDQ_0422 Electrical systems in electrical
5 and tests –mechanical installation & substation buildings
erection Precommissioning inspection & test
MDT_EL_CDQ_024 Solar power generator set MDT_EL_CDQ_0423 Electrical systems in electrical
6 Checks and tests – substation buildings
precommissioning & commissioning Commissioning inspection & test
test & heck
MDT_EL_CDQ_024 Low voltage power factor correction MDT_EL_CDQ_0435 Electrical systems in industrial
7 panel Inspections and checks before buildings
energising the electrical installation Inspections and checks before
energising the electrical installation
MDT_EL_CDQ_024 Low voltage power factor correction MDT_EL_CDQ_0436 Electrical systems in industrial
8 panel checks and tests – buildings checks and tests -
precommissioning/ commissioning commissioning
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 14 OF 155
MDT_EL_CDQ_0286 Low voltage variable speed drive MDT_EL_CDQ_0442 Cable run systems
systems - electrical motor -Inspections Inspections, checks and tests of the
and checks before energising the cable run system before cableway
electrical installation closure/backfilling
MDT_EL_CDQ_0287 Low voltage variable speed drive MDT_EL_CDQ_0443 Cable run systems inspection of
systems – cabling Inspections and cableway,(underground/abovegroung),
checks before energising the electrical after closure
installation
MDT_EL_CDQ_0288 Low voltage variable speed drive MDT_EL_CDQ_0444 Cable run systems inspections and
systems - converter with control and checks before energising the single
protection Inspections and checks cable
before energising the electrical
installation
MDT_EL_CDQ_0289 Low voltage variable speed drive MDT_EL_CDQ_0455 Area lighting system Inspections and
systems checks before energising the electrical
No load test run installation
MDT_EL_CDQ_0290 Low voltage variable speed drive MDT_EL_CDQ_0457 Area lighting system
systems Overall checks and measures on area
Performance test lighting system
MDT_EL_CDQ_0298 Electrical thyristor panels – cabling MDT_EL_CDQ_0462 Area earthing system (underground)
Inspections and checks before inspection of the correct mechanical
energising the electrical installation execution of the electrical installation
MDT_EL_CDQ_0299 Electrical thyristor panels - converter MDT_EL_CDQ_0463 Area earthing system ( aboveground)
with control, protection and harmonic Inspection of the correct mechanical
filters Inspections and checks before execution of the electrical installation
energising the electrical installation
MDT_EL_CDQ_0300 Electrical thyristor panels Performance MDT_EL_CDQ_0471 Total earthing system - measurement
test of the total earth resistance and of the
touch and step voltages
MDT_EL_CDQ_0304 Electrical control and monitoring MDT_EL_CDQ_0472 Total earthing system - measurement
systems (ELICS) off-line functional tests of the impedance of the earth fault ring
MDT_EL_CDQ_0305 Electrical control and monitoring MDT_EL_CDQ_0473 Total earthing system - measurement
systems (ECMS) - On-line functional of the touch voltage for electric system
tests fed by an external electrical system
with neutral isolated
MDT_EL_CDQ_0313 Local distribution switchgears MDT_EL_CDQ_0483 Electric tracing system Inspections and
Inspections and checks before checks before energising the electrical
energising the electrical installation installation
MDT_EL_CDQ_0314 Low voltage switchgears Checks and MDT_EL_CDQ_0484 Electric tracing system inspections and
tests -commissioning checks -commissioning
MDT_EL_CDQ_0333 Earthing resistors Inspections and MDT_EL_CDQ_0492 Bus ducts inspection of the correct
checks before energising the electrical mechanical execution of the electrical
installation installation
MDT_EL_CDQ_0334 Electric Heater – check and test before MDT_EL_CDQ_0493 Gis (gas insulated substation) final
energizing inspection assembly and
precommissioning activities
MDT_EL_CDQ_0335 Electric Heater – check and test After MDT_EL_CDQ_0494 Gis (gas insulated substation) Gis -
energizing commissioning activities
MDT_EL_CDQ_034 Motor control stations
3 Final inspection & insulation check
MDT_EL_CDQ_035 Socket outlets
3 Final inspection & insulation check
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 15 OF 155
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-03444
JOB No. DOC. NO. REV.
032076 00-ZA-E-03444 0
MENZEL LEDJMET EAST PROJECT
QCP – Electrical Works DATE 28 January 2010 SHEET 16 OF 155
MDT_FTC list
MDT_EL_FTC_0601 Power trasformer - test before MDT_EL_FTC_0650 Report of test on low voltage
energizing switchgear / power factor
correction panel
MDT_EL_FTC_0602 Checks and tests -commissioning - MDT_EL_FTC_0651 Report of test on Emergency
power transformers Diesel Generator Control Panel
MDT_EL_FTC_0605 Checks before energising - power MDT_EL_FTC_0660 Report of earthing resistors
switchgears and equipments
MDT_EL_FTC_0606 Functional checks and tests - MDT_EL_FTC_0661 Test Report of Electric Heater
protection relays
MDT_EL_FTC_0607 Functional checks and tests - MDT_EL_FTC_0680 Synchronous generators report
differential protection relay of electrical measurements
MDT_EL_FTC_0610 Functional check - ac uninterruptible MDT_EL_FTC_0681 Report of test for synchronous
power supply switchgears generators excitation system
MDT_EL_FTC_0611 Functional check - dc uninterruptible MDT_EL_FTC_0682 Report of test for synchronous
power supply switchgears generators protection relays
MDT_EL_FTC_0612 Functional check - accumulator MDT_EL_FTC_0683 Report of synchronous
batteries generators short circuit test
MDT_EL_FTC_0615 Medium voltage induction motors - MDT_EL_FTC_0684 Report of synchronous
Functionality check generators
MDT_EL_FTC_0616 Medium voltage induction motors – MDT_EL_FTC_0685 Report for test on synchronous
Motor Run check generators
MDT_EL_FTC_0620 Functional check - induction motors MDT_EL_FTC_0705 Report of electrical cables
measurement for insulation
and continuity test
MDT_EL_FTC_0621 Functional check - low voltage MDT_EL_FTC_0706 Report of electrical cables
induction motors voltage test (uo/u > 0.6/1kv)
MDT_EL_FTC_0635 Functional check - low voltage MDT_EL_FTC_0718 Report of measurement for
variable speed drive systems low area / building / rack/ walkway /
voltage induction motors pole / fence
MDT_EL_FTC_0636 Inspections and checks before MDT_EL_FTC_0720
energising the electrical installation - Report of total earthing system
low voltage variable speed drive measurement for the total
systems low voltage induction motors earth resistance
MDT_EL_FTC_0637 Functional check - low voltage MDT_EL_FTC_0721 Report of total earthing system
variable speed drive systems off measurement of the step and
load test touch voltage
MDT_EL_FTC_0638 Functional check - low voltage MDT_EL_FTC_0722 Report of total earthing system
variable speed drive systems measurement of the impedance
performance test of the earth fault ring
MDT_EL_FTC_0641 Electrical thyristor panels MDT_EL_FTC_0723
Converter with control, protection and
harmonic filters Report of total earthing system
Test before energising the electrical measurement of the rod(s)
installation total earthing
MDT_EL_FTC_0642 Electrical thyristor panels performance MDT_EL_FTC_0730 Report of test for bus ducts
test
MDT_EL_FTC_0645 Report of off line testi/o data MDT_EL_FTC_0740 Report of test for tracing
transmission / acquisition system
MDT_EL_FTC_0646 Report of on line test i/o data
transmission / acquisition
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0101 01 Inspections and checks before energising the 00-EA-E-40010 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation (Precommissioning) 09008 0203
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0102 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation.( Precommissioning) 40010 09008 0213
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0102 02 Mechanical and electrical functionality checks and 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
tests for each functional unit (Precommissioning) 40010 09008 0214
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0103 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation.(Precommissioning) 40010 09008 0223
- Preliminary checks on safety auxiliary facilities
(fire fighting, protection relays, safety/escape
lighting, safety barriers, service configuration, Vendor Vendor MDT.EL. FTC.
other). instruction instruction 0610/ 0611
- Mechanical functionality checks and tests of all manual manual
(where
auxiliaries and accessories (circuit breakers, applicable)
interlocks, auxiliary relays, power switches,
electrolyte, others).
- Electrical functionality checks and tests of all
switchgears auxiliaries and accessories (main
voltage sequence, protection relays, alarms,
signalling, intertrips, others).
- Off-voltage electrical measurements (insulation
check).
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0104 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0233
- Preliminary checks on safety auxiliary facilities
(fencing, joint uncoupling, rotating parts
protection, protection relays, service Vendor MDT.EL.
configuration, other). instruction FTC. 0615
Vendor
- Mechanical checks and tests of all induction manual
instruction (where
motor accessories (lubrication, cooling, purging
manual applicable)
circuits, valves, others).
- Electrical checks and tests of all electrical
motor auxiliaries and accessories (interlocks,
intertrips, alarms, others).
- Off-voltage electrical measurements (insulation
check).
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0105 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0243
- Preliminary checks on safety auxiliary facilities
(fencing, joint uncoupling, rotating parts
protection, protection relays, service Vendor Vendor MDT.EL.
configuration, other). instruction instruction FTC. 0620
- Mechanical functionality checks and tests of all manual manual
(where
induction motor accessories (lubrication,
applicable)
cooling, purging circuits, valves, others).
- Electrical functionality checks and tests of all
electrical motor auxiliaries and accessories
(interlocks, intertrips, alarms, others).
- Off-voltage electrical measurements (insulation
check).
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0107 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation. 40010 09008 0247
- Preliminary checks on safety auxiliary facilities MDT.EL.FTC.
(fencing, protection relays, safety/escape 0650 (where
lighting, safety barriers, service configuration, Vendor Vendor
applicable)
other). instruction instruction
- Mechanical functionality checks and tests of all manual manual
auxiliaries and accessories (circuit breakers,
power/selector switches, interlocks, auxiliary
relays, switches, others).
- Electrical functionality checks and tests of all
switchgears auxiliaries and accessories
(auxiliary circuits, circuit breakers and switches
electrically operated, protection relays, alarms,
signalling, intertrips, others).
- Off-voltage electrical measurements (insulation
check).
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0108 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0286
Electrical motor
- Preliminary checks on safety auxiliary facilities
Vendor Vendor
(fencing, joint uncoupling, rotating parts
instruction instruction MDT.EL.FTC.
protection, protection relays, service
manual manual 0635
configuration, other).
- Mechanical functionality checks and tests of all (where
induction motor accessories (lubrication, applicable
cooling, purging circuits, valves, others).
- Electrical functionality checks and tests of all
electrical motor auxiliaries and accessories
(interlocks, intertrips, alarms, others).
- Off-voltage electrical measurements (insulation
check).
EL 0108 02 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0287
Cabling
- Check of hearting shield connections
Vendor Vendor
instruction instruction
manual manual
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0108 03 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0288
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0109 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0298
Cabling MDT.EL.FTC.
- Check of insulation resistance measurement. 0641 (where
Vendor Vendor
- Check of applied voltage tests. applicable)
instruction instruction
manual manual
EL 0109 02 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0299
Converter with Control, Protection and Harmonic
MDT.EL.FTC.
Filters
0641 (where
- Preliminary checks on safety auxiliary facilities. Vendor Vendor
applicable)
- Mechanical and electrical functionality checks instruction instruction
and tests. manual manual
- Off voltage electrical checks and
measurements.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0111 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation. 40010 09008 0313
- Preliminary checks on safety auxiliary facilities MDT.EL.FTC.
(fencing, protection relays, safety/escape 0650 (where
lighting, safety barriers, service configuration, Vendor Vendor
applicable)
other). instruction instruction
- Mechanical functionality checks and tests of all manual manual
auxiliaries and accessories (circuit breakers,
power/selector switches, interlocks, auxiliary
relays, switches, others).
- Electrical functionality checks and tests of all
switchgears auxiliaries and accessories
(auxiliary circuits, circuit breakers and switches
electrically operated, protection relays, alarms,
signalling, intertrips, others).
- Off-voltage electrical measurements (insulation
check).
EL 0111 02 Checks and tests after energising (Only low 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H H
voltage switchgears) 40010 09008 0314
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0112 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0334
MDT.EL.FTC.
- Electrical functionality checks and tests of 0661 (where
Vendor Vendor
Electric heater applicable)
instruction instruction
manual manual
- Off-voltage electrical measurements (insulation
check).
- Voltage check
Vendor Vendor
- Current check
instruction instruction
manual manual
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0113 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation 40010 09008 0333
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0116 01 Inspections and checks before starting the primary 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
machine 40010 09008 0364
Generator MDT.EL.FTC.
- Preliminary checks on safety auxiliary facilities. 0680
Vendor Vendor
(mechanical completion check, protection
instruction instruction (where
barriers, warning notices, others).
manual manual applicable)
- Preliminary checks on generator supplying and
control units (relays, phase rotation, fans,
others).
- Auxiliary systems mechanical and functionality
checks and tests (cooling, lubricating circuits,
others).
- Off-voltage electrical measurements (insulation
check).
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0116 02 Inspections and checks before starting the primary 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
machine 40010 09008 0365
EL 0116 03 Short circuit test and measurement (reduced 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
voltage test) 40010 09008 0366
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0117 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H
electrical installation. 40010 09008 0353
- Preliminary checks on safety auxiliary facilities MDT.EL.FTC.
(lighting, safety barriers, service configuration, 0651 (where
other). Vendor Vendor
applicable)
- Mechanical functionality checks and tests of all instruction instruction
auxiliaries and accessories (circuit breakers, manual manual
power/selector switches, interlocks, auxiliary
relays, switches, others).
- Electrical functionality checks and tests of
control panel auxiliaries and accessories
(auxiliary circuits, circuit breakers and switches
electrically operated, protection relays, alarms,
signalling, intertrips, others).
- Off-voltage electrical measurements (insulation
check).
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0120 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H * For electrical test use
electrical installation 40010 09008 0416 where applicable the:
- Preliminary checks on safety auxiliary facilities
(relay tests, electrical substation safety ITP-EL-0111 (Switchgear)
devices, smoke detector, fire fighting, Vendor Vendor ITP -EL-0115 (Sockets)
safety/escape lighting, other). instruction instruction
- Functionality checks and tests (local manual manual ITP -EL-0123 (cables)
distribution boards, socket outlets, earthing, ITP -EL-0124 (lighting)
other).
ITP -EL-0125 (Earthing
and lightning systems)
EL 0120 02 Checks and tests after energising 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H * For electrical test use
- On voltage checks and electrical 40010 09008 0417 where applicable the:
measurements (power, voltage, current, power
factor, signalling, alarms, protective relays, ITP-EL-0111 (Switchgear)
lighting, other). Vendor Vendor ITP -EL-0115 (Sockets)
- Final checks (illumination level, light instruction instruction
distribution, exit/emergency escape light). manual manual ITP -EL-0123 (cables)
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0121 02 Inspection and test on electrical substations 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H * For electrical test
building before energising (precomissioning) * 40010 09008 0422 use where applicable
Local Switchgears the:
- Layout of switchgears.
- Completeness of the electrical connections Vendor Vendor ITP-EL-0111
- Efficiency of all the main and auxiliary devices instruction instruction (Switchgear)
of switchgears and equipments (circuit manual manual ITP -EL-0115 (Sockets)
breakers, power and selector switches,
auxiliary relays, auxiliary circuits, anti- ITP -EL-0123 (cables)
condensation heater, others). Off-voltage ITP -EL-0124 (lighting)
electrical measurements (insulation check)
- Lighting ITP -EL-0125 (Earthing
Correct installations of lighting fixtures, safety and lightning systems)
escape way lights positioning
- Socket outlets
Correct installations of socket outlets and
correct functionality.
- Earthing and lightning systems
Correct execution of the earthing, bonding,
lightning systems for industrial building and
connection the plant earthing system.
- Safety provisions and warning devices
All provisions to prevent the accidental contact
with electrical live parts have been correctly
anticipated.
- Cables
cables test
ORGANIZATION CODE INVOLVEMENT CODE
CC – Construction SubContractor CO –Saipem Commissioning P – Perform/Submit W – Witness (Minimum 20% inspection rate)
QC – QC Construction SubContractor TP1 – Laboratory / TP2- (ARH – DMI - CTC-autre…) S – Surveillance H – Hold Point (100% Inspection rate)
SP – Saipem Supervision CL – Client R – Review M -Monitoring
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0121 03 inspection and test on electrical substations 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H H H H H * For electrical test
building after energising (commissioning) * 40010 09008 0423 use where applicable
the:
- Local Switchgears Vendor Vendor
electrical test
instruction instruction ITP-EL-0111
manual manual (Switchgear)
- Lighting
illumination level, and functional use.
ITP -EL-0115 (Sockets)
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0122 02 Checks and tests after energising 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H H * For electrical test use
40010 09008 0436 where applicable the:
On voltage electrical measurements (signalling,
relays, instruments, lighting, socket outlets, ITP-EL-0111
emergency and safety facilities, illumination levels, (Switchgear)
Vendor Vendor
exit-emergency-escape light).
instruction instruction ITP -EL-0115 (Sockets)
manual manual
ITP -EL-0123 (cables)
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0123 01 Inspections checks and tests of the cable run 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H H W
system before cableway closure 40010 09008 0442
- Underground MDT.EL.FTC
Inspection of mechanical execution of 0705
Vendor Vendor
cableway before trench/channel backfilling and
instruction instruction (where
measurement of insulation resistance.
manual manual applicable)
- Aboveground
Inspection of mechanical execution of
cableway before tray covering and
measurement of insulation resistance.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0123 03 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W W W
single cable (Precomissioning) 40010 09008 0444
- Checks and tests of cables before connection
MDT.EL.FTC .
(terminations, ferrules, identification tags,
0706/0705
conductor continuity, other). Vendor Vendor
- Off voltage electrical measurements (insulation instruction instruction (where
resistance measurement, high voltage test). manual manual applicable)
- Checks and tests of cables after connection
(termination fixing, earthing, electrical
segregation, other).
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0124 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H W
electrical installation. (Precommissioning) 40010 09008 0455
EL 0124 02 Overall checks and measures on area lighting 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H H
system (Commissioning) 40010 09008 0457
- Lighting fixtures efficiency.
- Correct installation of emergency and safety
lights. Vendor Vendor MDT.EL.FTC.
- Measurement of illumination levels in the instruction instruction 0718
operating, service and storage areas, roads, manual manual
buildings, others.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0125 03 Measurement of the total earth resistance and of 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H H
the touch and step voltages (Precommissioning) 40010 09008 0471
EL 0125 04 Measurement of the impedance of the earth fault 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H H
ring (Precommissioning) 40010 09008 0472
MDT.EL.FTC.
- Measurement of the total impedance of the 0722
earth fault ring. Vendor Vendor (where
- Check of protection devices without differential instruction instruction applicable)
protection (TN systems). manual manual
EL 0125 05 Measurement of the touch voltage for electric 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H H H
system fed by an external electrical system with 40010 09008 0473
neutral isolated (Precommissioning) MDT.EL.FTC.
0721
- Touch voltage measurement (where
Vendor Vendor
instruction instruction applicable)
manual manual
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
EL 0127 01 Inspections and checks before energising the 00-EA-E- 00-ZA-E- MDT.EL.CDQ. P H W H W
electrical installation. (Precommissioning) 40010 09008 0483
- Preliminary checks on safety auxiliary facilities MDT.EL.FTC..
(protection, service configuration, other). 740
- Off voltage electrical check and measurements Vendor Vendor
(check of insulation, check of functionality, instruction instruction
other). manual manual
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
COMPANY’S DOC. NO.
SONATRACH MENZEL LEDJMET EAST PROJECT MLEG-00-AQ-E-00OO84
First Calgary Petroleums 001411-00-CBQB-034244
JOB No. DOC. NO. REV.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
FTC reference: MDT.EL.FTC.0601 PAGE 1 OF 1
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
electrical measurements:
Final checks:
2) check the appearance of oil leakage or possible oil weeping during no-load
operation;
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning INSPECTION NOTIFICATION REFERENCE
Manager
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
TAG/ITEM
ENGINEERING DOCUMENT No
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning INSPECTION NOTIFICATION REFERENCE
Manager
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
1. The inspections and checks before energising have been positively executed.
2. check the bus bar voltage values after prime connection to main supply system;
3. check the voltage transformer connections and phase sequences;
4. check that signalling lamps are correctly lighted according to circuit breaker and
switching devises position;
5. test the correct functionality of earth fault residual current (or differential) protection
unit/device (for L.V. outgoing and motor starters);
6 check that relay and instruments work properly.
Final checks:
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
REPORT NO.
MENZEL LEDJMET EAST PROJECT
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning INSPECTION NOTIFICATION REFERENCE
Manager
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning INSPECTION NOTIFICATION REFERENCE
Manager
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. The inspections and checks before energising have been positively executed.
3. check the correct functionality of motor control station (switches, push-button and
lamps) as anticipated in the project logic and wiring diagrams (control, signalling,
interlocks, other);
10. check the rotor axial play by comparing the alignment between the end shaft notch
and the frame fixed index.
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning INSPECTION NOTIFICATION REFERENCE
Manager
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
RFI No.
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning INSPECTION NOTIFICATION REFERENCE
Manager
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. check the incoming voltage rating values before connecting to main supply system;
2. check that signalling lamps are correctly lighted according to circuit breaker and -
switching devises position;
5. test the correct functionality of earth fault residual current (or differential) protection
unit/device (if any);
Final checks:
6. Monitor the performance of operating panel units through the check of measure
instruments.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
1. Shield earthing strings are connected in such a way that the toroidal current
transformers are by-passed.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
LOW VOLTAGE VARIABLE SPEED DRIVE SYSTEMS - CONVERTER WITH CONTROL AND PROTECTION
Inspections and checks before energising the electrical installation
RFI No.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. The inspections and checks before energising have been positively executed.
2. Verify the motor is un-coupled.
3. Verify the correct test configuration.
ISSUE DATE:
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Performance test
This test is to be executed on the whole system electrically and mechanically connected.
1. Test of the whole system with motor off-load has been positively executed.
6. Check that the loss of 4-20mA speed set point regulating signal gives an alarm and set
the motor speed to the programmed operating state (e.g.: zero speed set - max speed
set - last speed set) according to process design.
7. Check the restart duty due to voltage dip or power interruption for a specified short
period (including the cooling devices).
8. Test the correct functionality of earth fault residual current (or differential) protection
unit/device.
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning Manager INSPECTION NOTIFICATION REFERENCE
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. The inspections and checks before energising the cables of the RC associated to the
cable run has been satisfactory executed.
2. Shield earthing strings are connected in such a way that the toroidal current
transformers are by-passed.
3. The measure of the insulation resistance of cables and/or the applied voltage test has
been satisfactory executed.
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning Manager INSPECTION NOTIFICATION REFERENCE
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
ELECTRICAL THYRISTOR PANELS - CONVERTER WITH CONTROL, PROTECTION & HARMONIC FILTERS
Inspections and checks before energising the electrical installation
TAG/ITEM ENGINEERING DOCUMENT No.
RFI No.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This test is to be executed on the whole system completely connected and wired.
3. Check the noise limit of converter at any operational state of the Converter.
6. Check that the loss of 4-20mA speed set point regulating signal gives an alarm and set
the motor speed to the programmed operating state (e.g.: zero power set – min/max
power set - last power set) according to process design.
7. Check the restart duty due to voltage dip or power interruption for a specified short
period (including the cooling devices).
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. The inspections and checks before energising have been positively executed.
2. Test that all the process digital signals are correctly transmitted to the system,
according to drawing and list.
3. Test that all the analogue signals and measurement are correctly transmitted to the
system, according to drawing and list.
5 Test that the serial communication protocol with other systems is compatible and the
interfaces dialog correctly.
6 Check that the system is stable and works correctly against site environment (e.g.:
data loss).
7 Check that system is not affected by environment disturbance (e.g.: vicinity to H.V.
power equipment).
15. Check that system does not affect the environment by generating disturbance effect to
other electric/electronic nearby located.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. The checks and tests after prime system supply have been positively executed.
2. Test that all the process digital signals are correctly acquired by system, according to
drawing and list.
3. Test that all the analogue signals and measurement are correctly acquired by system,
according to drawing and list.
5. Test that all type of automatic operational functions are correctly performed by system
according to design (e.g.: controls, signals, measurements and trends, graphic pages
functionality, logics and sequences, event record, event report, others).
6. Check that historical data are correctly archived in the chronological event database
for long period as specified in the design;
7. Check that historical events are correctly printed (time accuracy with correct short
description of the event shall be clearly indicated).
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning Manager INSPECTION NOTIFICATION REFERENCE
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning Manager INSPECTION NOTIFICATION REFERENCE
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
7. check the incoming voltage rating values before connecting to main supply system;
8. check that signalling lamps are correctly lighted according to circuit breaker and –
switching devises position;
11. test the correct functionality of earth fault residual current (or differential) protection
unit/device;
Final checks:
12. monitor the performance of operating switchgear units through the check of measure
instruments.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
EARTHING RESISTORS
Inspections and checks before energising the electrical installation
TAG/ITEM ENGINEERING DOCUMENT No.
1. The inspection of electrical material before installation has been positively executed.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
ELECTRIC HEATER
Inspections and checks before energising the electrical installation
TAG/ITEM ENGINEERING DOCUMENT No.
1. The inspection of electrical material before installation has been positively executed.
Preliminary checks
2. confirm the availability of vendor documentation for the installation
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
ELECTRIC HEATER
Inspections and checks after energising the electrical installation
TAG/ITEM ENGINEERING DOCUMENT No.
PAGE 1 OF 1
RATING MEASURED:……………………………….
RATING MEASURED:……………………………….
MEASUREMENT TYPE:
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
1. The inspection of electrical material before installation has been positively executed.
2. Confirm the availability of routine and type tests documentation and declaration of conformity.
3. Control stations are securely fixed to the support.
4. The support and base plate are correctly executed and fixed to the ground.
5. The position is as specified in the design.
6. Cable(s) and earthing conductor(s) are fixed and connections are correctly executed.
7. Cables metal sheaths and armouring are earthed. Armouring earthing strings are connected in
such a way that the toroidal current transformers are by-passed.
8. Check the correct installation of the equipment suitable for the hazardous area.
9. Check that cable(s) are securely clamped to the cable gland(s).
10. Check that the cable glands are securely fixed to the receptacle.
11. Cables inlet in terminal and auxiliary boxes are well sealed and cable glands hold cables
securely.
12. Check that wires of control cable terminate to the terminal strips according to the project design.
13. Check that each wire and terminal strip has proper identification tag according to the drawing.
14. Not used spare conduits in general and others in road crossings are internally clean and
plugged.
15. Covers have been installed as anticipated in the drawing.
16. There is no visible damage to switches or push-button and they operate correctly.
17. Instrument glasses and warning lamp covers are not broken.
18. Warning lamp covers are of the correct colour.
19. Labels are fixed, clean and readable
20. Check that ampere-meter scale complies with rating of current transformer in switchgear.
21. Check the mechanical continuity of bonding and connection to earth of all (internal and external)
metallic assembled components.
22. Check the mechanical operability of switches or push-buttons.
Off voltage electrical measurements:
23. measure the insulation resistance of control cable(s) disconnected or isolated at both ends.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
SOCKET OUTLETS
Final Inspection & Insulation check
TAG/ITEM ENGINEERING DOCUMENT No.
PAGE 1 OF 1
1. The inspection of electrical material before installation has been positively executed.
2. Confirm the availability of routine and type tests documentation and declaration of
conformity.
4. The support/structure and base plate are correctly executed and fixed to the ground.
6. Power cable and earthing conductor(s) are fixed and connections are correctly
executed.
8. Check that the cable glands are securely fixed to the receptacle.
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning INSPECTION NOTIFICATION REFERENCE
Manager
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
NOTES: Test on FTC form to be done only if are not covered by factory test or if instructed by Commissioning Manager INSPECTION NOTIFICATION REFERENCE
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
2. check that signalling lamps are correctly lighted according to circuit breaker and
the switching devises position;
Final checks:
2. monitor the performance of operating Control Panel units through the checks of
remote control unit .
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
GENERATOR
INSPECTIONS AND CHECKS BEFORE STARTING THE PRIMARY MACHINE
TAG/ITEM ENGINEERING DOCUMENT No.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
RFI No.:
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. Testing before starting the primary machine has been positively executed.
2. Verify that the generator is electrically isolated from grid.
3. Close the power terminals in short circuit (through suitable shunts).
4. Start the primary machine.
5. Verify the correct functionality of the primary machine.
6. Verify the excitation system work properly increasing gradually the excitation
current.
7. Measure the excitation voltage.
8. Measure the excitation current.
9. Check the generator output current and its rise.
10. Check the rotor direction of rotation.
11. Verify the phase rotation of generator.
12. Measure the current unbalance.
13. Test the correct functionality of current protection unit/device by moving the set.
14. Test the correct functionality of the differential protection (stability and sensitivity) by
moving the set.
15. Test the over-speed trip devices.
16. Test the interlock relays (F86).
17. Measure the surface temperatures.
18. Reduce the excitation voltage to zero.
19. Stop the primary machine.
20. Remove the short circuit shunts from the power terminals.
RFI No.:
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
SYNCHRONOUS GENERATORS
NO-LOAD TEST-RUN
No-load test-run
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
SYNCHRONOUS GENERATORS
SYNCHRONIZATION CHECKS AND TESTS
PAGE 1 OF 1
2. Remove the connection between the synchronizing system and the generator circuit breaker.
3. Check that the operating parameters of the synchronizing relay comply with the setting table
values.
4. Check the synchronization devices works correctly (the synchroscope, the voltmeters and
synchronizing relays shall correctly follow the frequency displacement between generator and
grid).
5. Check that the closing command of the synchronizing relay actuates within the synchronization
set range.
6. Check that the closing command of the synchronizing relay correctly operates the closing of the
paralleling circuit breaker.
7. Verify that the phase rotation of generator complies with grid (phase rotation meter connected
to the secondary windings of synchronising VT’s, both generator and grid, shall indicate same
rotation direction).
8. Restore the connection between the synchronizing system and the generator circuit breaker.
9. The synchronization operations are performed and the generator circuit breaker is closed.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
SYNCHRONOUS GENERATORS
PERFORMANCE TEST AFTER SYNCHRONIZATION
1. All tests after starting the primary machine and before operating the synchronization
have been positively executed.
2. Check the voltage and the frequency regulation system.
3. Check the automatic power factor controller (if applicable).
4. Measure the generator power output.
5. Measure the phases voltage and current.
6. Measure the generator power factor.
7. Check the generator frequency.
8. Measure the noise level according to values designed in the Manufacturer
specification.
9. Measure the vibration of machine along the radial (vertical and horizontal) and axial
directions and compare values with ones anticipated for the specific class of
machine.
10. Check the rotor axial play by comparing the alignment between the end shaft notch
and the frame fixed index.
11. Check the lubrication oil pressure and temperature at full load.
12. Check the cooling air/water temperature.
13 Check the appearance of lubricant or cooling fluid leakage.
14. Measure the inlet/outlet water cooling temperature.
15. Measure the lubricating oil temperature.
16. Measure the surface temperatures.
17. Perform the functional tests after synchronizing.
18. Perform the protection tests after synchronising.
19. Perform the dynamic test.
20. Perform the load test.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
Inspections and checks before energising the electrical installation
Local switchgears
7. check the mechanical operability of circuit breakers, power switches and relays;
8. measure the insulation resistance of all of connected circuits (phase to earth) with all external
handle switches closed
9. check the electrical functions of switchgears as anticipated in the wiring diagram (local control,
signalling, common alarms, other);
10. test the correct functionality of earth fault residual current (or differential) protection
unit/devices.
Socket outlets
11. check the correct functionality of plug coupling and switch mechanical interlock;
12. test the correct functionality of differential protection devices.
13. measure the insulation resistance (phase to earth) of feeding wires and cables.
Earthing
14. check the electrical continuity of the earth protection conductors with the main element of the
building earthing system (internal earth strap conductor, main earth ring, general earthing
system).
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
Checks and tests after energising
1. The inspections and checks before energising have been positively executed.
2. check that signalling, alarming are correctly lighted according to the associated
function(s);
3. check that protective, auxiliary relay and instruments work properly;
4. check that all lighting fixtures are correctly lit up;
5. check that all lighting switches are correctly operating;
6. check the photocell works properly;
7. check the socket outlets are correctly powered;
8. check the presence of voltage on socket outlets;
9. measure the absorbed current of main feeder;
10. measure the power factor of main feeder;
11. measure the absorbed current of circuit feeder;
12. measure the illumination level of working area by comparing lux values with ones set
out in the technical specification;
13. measure the illumination levels of area and compare values with code standards or
project specification;
14. measure the distribution of light is uniform;
15. check that the emergency and safety lights guarantee the adequate illumination level
for the escape exits.
Final checks:
16. measure the illumination level of working areas;
17. check that the distribution of light in the working areas is uniform
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
1. Doors and hatches close properly, are fitted with keys and open from the inside only by using
the anti-panic handle or pushing the door, as anticipated in the design.
2. Glass panes are not broken.
3. Ventilation openings are not blocked off and are fitted with gratings and insect nets.
4. The artificial ventilation system in the local switchgear room and/or battery room is correctly
installed.
5. The layout of panels and equipment meets requirements as regards working and safety space,
as anticipated in the design.
6. There is no damage to the substation roof and there are no openings or cracks through which
water can drip or objects fall.
7. The floor, ceiling and walls free of dust to The floor and walls of the battery room are coated
and/or painted with acid-resistant paint.
8. The floor slope is correct and the drain pit is clean.
9. Transformer oil collecting pits are fitted with round stones (for fire extinguishing) of average
diameter higher than 1.5 inches (about 40 mm).
10. Transformer bays are separated with fire resistant walls, closed at the roof in such a way that the
propagation of fire to the adjacent bays is inhibited.
11. Warning notices are fixed to access doors, fencing of transformer bays, battery room door, etc.
12. Fencing and boundary limits for keeping unauthorised persons away are correctly installed and
connected to the earthing system.
13. Protection against corrosion is provided and is complete or made good where necessary.
14. Rooms are clean.
RFI No.
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
Low voltage switchgears
On voltage electrical measurements:
check the incoming voltage rating values before connecting to main supply
system;
check that signalling lamps are correctly lighted according to circuit breaker
and -switching devises position;
test the correct functionality of earth fault residual current (or differential)
protection unit/device;
Final checks:
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
Local switchgears
7. check the mechanical operability of circuit breakers, power switches and relays;
8. measure the insulation resistance of all of connected circuits (phase to earth) with all external
handle switches closed;
9. check the electrical functions of switchgears as anticipated in the wiring diagram (local
control, signalling, common alarms, other);
10. test the correct functionality of earth fault residual current (or differential) protection
unit/devices.
Socket outlets
11. check the correct functionality of plug coupling and switch mechanical interlock;
12. test the correct functionality of differential protection devices.
Earthing
13. check the the electrical continuity of the earth protection conductors with the main element of
the building earthing system (internal earth strap conductor, main earth ring, general earthing
system)
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
1. The inspections and checks before energising have been positively executed.
2. check that signalling, alarming are correctly lighted according to the associated function(s);
3. check that protective, auxiliary relay and instruments work properly;
4. check the socket outlets are correctly powered;
5. check the presence of voltage on socket outlets;
6. measure the absorbed current of main feeder;
7. measure the power factor of main feeder;
8. measure the absorbed current of circuit feeder;
9. check the photocell work properly;
10. all fixtures are correctly lighted on;
11. measure the illumination levels of area and compare values with code standards or project
specification;
12. measure the distribution of light is uniform;
13. the emergency and safety lights guarantee the adequate illumination level for the escape
exits;
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
2. the associated lighting distribution switchgear has been positively checked and
tested and relevant certificates are issued;
3. main cables (from substation to local lighting distribution switchgear) have been
positively checked and tested and certificates issued;
4. lighting circuit protective devices, including the differential relays, have been checked
and tested;
5. the mechanical operation of power switch(es) is satisfactory;
6. lighting circuit cables have been positively checked and tested and certificates
issued;
7. the lighting junction boxes and light fixtures have been inspected.
8. all measures to prevent the accidental contact with circuits to be energised have
been taken;
9. verify the correct service configuration;
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
5. Measure the illumination levels of area and compare values with code standards or
project specification.
7. No visible contrast between areas widely lighted and adjacent poorly lighted is to be
arisen.
8. The emergency and safety lights guarantee the adequate illumination level for the
escape way (stairs, walkways, man-holes, rails, other).
9. The specific operating areas, where critical handling service is required or specific
instruments or controls need to be monitored, are adequately illuminated.
NOTES
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. The inspection of electrical material before installation has been positively executed.
2. There are no obstructions, landslide, contamination or cracking in the excavation that can
affect the laying of earth rods.
3. The bottom of the excavation is at the right depth and is smoothed, clean, and made ground
well firmed.
4. Bare and insulated earth conductors have the correct size and are installed in accordance
with types and conductor sections as indicated in the design.
5. Earth conductors are laid in accordance with the layout and depth indicated in the design.
6. Earth conductors are correctly jointed and connected to the termination points.
7. Cad-weld junctions are correctly executed and protected against damp with a bitumen or
similar mixture.
8. Mechanical compression joints are correctly executed, made with the adequate tool and
protected against damp with a bitumen or similar mixture.
9. Connection conductors rising from aboveground to the termination points are protected with
PVC conduit section.
10. Earth conductors have not been damaged during installation.
11. The connections of facilities foreseen with surrounding areas have been executed.
12. They are removable for easy inspection.
13. The earth conductors are covered with a layer of well-firmed sand at the bottom of trench.
14. Pits for inspection of vertical earth rods are located in accordance with the project design.
15. Concrete pits for vertical earth rods are built in accordance with the project design.
16. Vertical earth rods are correctly connected with the earth conductors in accordance with the
project design.
17. All irons of the concrete structures and/or part of them are correctly bonded and ready to be
earthed.
18. Earth rings are provided around all buildings and electric substations erected inside the
area.
19. Correct connection of grid to earthing wells
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
1. The inspection of electrical material before installation has been positively executed.
2. The inspections on the earthing system inside all buildings and electric substations
erected inside the area have been positively executed and the relevant certificate
has been issued.
3. The continuity of protection conductors (PE), bonding conductors and other
equipotential conductors that form part of the earthing system has been verified.
4. All metallic structures and/or part of them are correctly bonded and earthed.
5. Bonding and earthing connections are provided for all machines, switchgears,
equipment and components, including those outside the electrical installation.
6. Lightning arresters and protections rods comply with the design.
7. Earthing has been anticipated for reinforced concrete rods, as laid down in the
design.
8. Terminals and earth bus bars are correctly installed.
9. Protection conductors (PE) out of cable runs and earthing conductors are sized in
relation to the design and are correctly fixed and protected.
10. Bolts for fixing bus-bar junction or conductors are well tightened.
11. Connections are provided to earthing ring for all buildings and electric substations
erected inside the area.
12. Measure the total earth resistance of a single rod and/or group of rods.
13. Measure the total clean earth resistance (when applicable).
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
TOTAL EARTHING SYSTEM - MEASUREMENT OF THE TOTAL EARTH RESISTANCE AND OF THE
TOUCH AND STEP VOLTAGES
TAG/ITEM ENGINEERING DOCUMENT No.
Measurement of the total earth resistance and of the touch and step voltages
1. The inspections, checks and tests of all earthing systems associated to the individual
areas have been positively executed and certificates issued.
2. All the measures to preserve the personnel against electric shocks during test have
been taken.
4. Measure the touch and step voltage. (APPLICABLE ONLY FOR HV SUBSTATION
AREA)
AREA:
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
TOTAL EARTHING SYSTEM - MEASUREMENT OF THE IMPEDANCE OF THE EARTH FAULT RING
TAG/ITEM ENGINEERING DOCUMENT No.
1. The inspections, checks and tests of all earthing systems associated to the individual
areas have been positively executed and certificates issued.
2. All the measures to preserve the personnel against electric shocks during test have
been taken.
3. Measure the impedance of the earth fault ring and check the characteristics of
protection devices not provided with differential protection (TN system).
RFI No.
NOTES
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
TOTAL EARTHING SYSTEM - MEASUREMENT OF THE TOUCH VOLTAGE FOR ELECTRIC SYSTEM FED BY
AN EXTERNAL ELECTRICAL SYSTEM WITH NEUTRAL ISOLATED
TAG/ITEM ENGINEERING DOCUMENT No.
Measurement of the touch voltage for electric system fed by an external electrical system
with neutral isolated
1. The inspections, checks and tests of all earthing systems associated to the individual
areas have been positively executed and certificates issued.
2. All the measures to preserve the personnel against electric shocks during test have
been taken.
3. Measure the touch voltage for electric system fed by an external electrical system
with neutral isolated.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
1. the associated supply switchgear and protective relays in distribution switchgear have
been checked and tested;
2. inspections, checks and tests on cable run system have been positively executed.
3. all measures to prevent the accidental contact with circuits to be energised have been
taken;
4. verify the correct service configuration;
5. confirm the availability of routine and type tests documentation, declaration of
conformity and type tests documentation for safety (Ex) executions.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
BUS DUCTS
INSPECTION OF THE CORRECT MECHANICAL EXECUTION OF THE ELECTRICAL INSTALLATION
TAG/ITEM ENGINEERING DOCUMENT No.
RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
Final Inspection and Precommissioning activities are done as per Manufacturer Commissioning
Protocol N°:
NOTES: * the above checking and Test are for main guidance, all checking and Test will be performed and INSPECTION NOTIFICATION REFERENCE
certified as per Manufacturer installation, precommissioning and commissioning manual, All the “On site test RFI No.
reports will we referred on this Form, at site.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
PAGE 1 OF 1
NOTES: * all checking and Test will be performed and certified as per Manufacturer installation, INSPECTION NOTIFICATION REFERENCE
precommissioning and commissioning manual, All the “On site test reports will we referred on this Form, at site. RFI No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
R [measured MΩ]
R [anticipated MΩ
Test result Positive [P] ]: Negative [N] ]:
DIELECTRIC LIQUID STRENGTH TEST
Type of dielectric : Test method : Strength value :
E [anticipated kV/mm] : E [measured kV/mm] :
Test result Positive [P] ]: Negative [N] ]:
CONTINUITY TEST
HV winding [L1-L2] R [mΩ] : INT winding [L1-L2] R [mΩ] :
HV winding [L2-L3] R [mΩ] : INT winding [L2-L3] R [mΩ] :
HV winding [L3-L1] R [mΩ] : INT winding [L3-L1] R [mΩ] :
LV winding [L1-L2] R [mΩ] : Neutral R [mΩ] :
LV winding [L2-L3] R [mΩ] : Earthing R [mΩ] :
LV winding [L3-L1] R [mΩ] : Other equipment R [mΩ] :
Test result Positive [P] ]: Negative [N] ]:
MEASUREMENT OF THE AUXILIARY INSULATION RESISTANCE
Test voltage [kV] : Duration [min] : R [anticipated MΩ] : R [measured MΩ] :
Circuits tested L1 to Earth L2 to Earth L3 to Earth N to Earth L… to L…/N (*)
Fan cooler circuits
Anti-condensation heater circuit
Test result Positive [P] ]: Negative [N] ]:
NOTES: (*)Measure sequentially the insulation resistance between L1-L2 / L2-L3 / L3-L1 / L1-N / L2-N / L3-N and compare
with the anticipated value. The worst measured value shall only be recorded.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0204 PAGE 1 OF 2
ON VOLTAGE TESTS
NO LOAD TEST
Time [h] 0 4 8 12 16 20 24
Phase 1 primary voltage [kV]
Phase 2 primary voltage [kV]
Phase 3 primary voltage [kV]
Phase 1 secondary voltage [kV]
Phase 2 secondary voltage [kV]
Phase 3 secondary voltage [kV]
L1 current [A]
L2 current [A]
L3 current [A]
Current unbalance [%]
Power losses [kW]
Oil temperature [°C]
Windings temperature [°C] (*)
Core temperature [°C]
Gas pressure [bar]
Noise level [dB]
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Compartment No.
Functional unit tag
Location Rating [A]
of
V.T. ratio [V/V]
the
relay C.T. ratio [A/A]
Manufacturer
Type
Serial number
Description
of Function
the Code tag
relay
Setting range [A or V]
Time setting range [s]
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Time
2nd measured value [A or V]
relay
setting 2nd time selected setting [s]
and 2nd time measured value [s]
test
(cont’d)
Rated current
Curve code
FLC
1st tap selected setting [%]
Inverse
1st tap measured value [%]
time
relay 1st time selected setting [s]
setting 1st time measured value [s]
and
2nd tap selected setting [%]
test
2nd tap measured value [%]
2nd time selected setting [s]
2nd time measured value [s]
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0214 PAGE 1 OF 1
Operating voltage [KV] : Switchgear rating [KV / A / KA] : Frequency [HZ] :
LINE DIFFERENTIAL RELAY TEST
RELAY DATA
Manufacturer Functional unit Type Code tag Serial number Current setting range [A] Time setting range [sec]
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Frequency [HZ] :
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0223 PAGE 1 OF 1
Frequency [HZ] :
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Frequency [HZ] :
Voltage measured between positive pole and negative pole (U) [V] : R [anticipated MΩ] :
Voltage measured between the positive terminal and earth (U1) [V] : R [calculated MΩ] :
Voltage measured between the positive terminal and earth (U2) [V] :
R = [U / (U1 + U2)] RV
Internal resistance of the voltmeter (RV) [kΩ] :
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Test result Positive [P] : Negative [N] : Test result Positive [P] : Negative [N] :
MEASUREMENT OF THE AUXILIARY INSULATION RESISTANCE
Test voltage [kV] : R [measured MΩ] Test voltage [kV] : R [measured MΩ]
Duration [min] : L N L Duration [min] : L
R [anticipated MΩ] : to to to R [anticipated MΩ] : to
Circuit tested Earth Earth N Circuit tested Earth
Anti-condensation heater [MΩ] Bearing (DE) [MΩ]
Temperature detector [MΩ] Bearing (NDE) [MΩ]
Test result Positive [P] : Negative [N] : Test result Positive [P] : Negative [N] :
Notes: (*) Measure sequentially the insulation resistance between L1-L2 / L2-L3 / L3-L1 / L1-N / L2-N / L3-N and compare
with the anticipated value. The worst measured value shall only be recorded.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0243 PAGE 1 OF 1
Frequency [HZ] :
Earthing
Test result Positive [P] : Negative [N] : Test result Positive [P] : Negative [N] :
NOTES:
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0244 PAGE 1 OF 1
Frequency [HZ] :
NOTES:
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Functional check - LOW VOLTAGE VARIABLE SPEED DRIVE SYSTEMS LOW VOLTAGE INDUCTION MOTORS
Test result Positive [P] : Negative [N] : Test result Positive [P] : Negative [N] :
NOTES:
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Inspections and checks before energising the electrical installation - LOW VOLTAGE VARIABLE SPEED DRIVE SYSTEMS
LOW VOLTAGE INDUCTION MOTORS
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
FUNCTIONAL CHECK - LOW VOLTAGE VARIABLE SPEED DRIVE SYSTEMS OFF LOAD TEST
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
FUNCTIONAL CHECK - LOW VOLTAGE VARIABLE SPEED DRIVE SYSTEMS PERFORMANCE TEST
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
MEASUREMENT OF THE INSULATION RESISTANCE A.C. APPLIED VOLTAGE TEST FOR SWITCHGEAR ≥ 1kV
Test voltage [kV] : R [measured MΩ] : Test voltage [kV] : Test result [P/N]
Duration [min] : L1 L2 L3 Duration [min] : L1 L2 L3
R [anticipated MΩ] : to to to to to to
Switchgear circuit tested
Switchgear circuit tested Earth Earth Earth Earth Earth Earth
Test result Positive [P] : Negative [N] : Test result Positive [P] : Negative [N] :
CONTINUITY TEST MEASUREMENT OF THE AUX. INSUL. RESIST.
Switchgear circuit tested R [mΩ] : Test voltage [kV] : R [measured MΩ] :
(from / to) L1 L2 L3 E Duration [min] : L…
L1 L2 L3 N
R [anticipated MΩ] : to
to to to to
L…/N
Earth Earth Earth Earth
Switchgear circuit tested (*)
Test result Positive [P] : Negative [N] : Test result Positive [P] : Negative [N] :
NOTES: (*) Measure sequentially the insulation resistance between L1-L2 / L2-L3 / L3-L1 / L1-
N / L2-N / L3-N and compare with the anticipated value. The worst measured
value shall only be recorded.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Start-up current [A] : Start-up duration [s] : Initial surface temperature [°C] :
Initial bearings temperature [°C] : Initial lubrication oil temperature [°C] : Initial cooling water temperature [°C] :
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Nr Signal tag Electric device (2) Function (3) Signal type (4) Communication (5) Test res.
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
NOTES :DIGITAL SIGNALS NOTES :ANALOGICAL SIGNALS
(1) PLC - DCS – EDS … (1) PLC - DCS – EDS …
(2) circuit breaker – power switch – earthing (2) C.T. – V.T. - 0-20 mA / 4-20 mA / 0-10
switch – selector switch – protection relay – mV transducer …
aux relay … (3) measurement – regulation – control –
(3) status – command – alarm – user availability adjustment …
- opening – closing – trip - – block – (4) current – voltage – power factor –
permissive power frequency - active power –
(4) NO / NC contact – fixed - impulsive - leached reactive power - el. energy –
– delayed mechanical speed …
(5) hard wired (multi-wired cable) - serial link (5) hardwired (multi-wire cable) – serial
(twisted pair - coaxial cable – optical fibre ) link (twisted pair - coaxial cable –
optical fibre)
Remark
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Frequency [HZ] :
Current/time rating[mA / s]
Check of (cos fi) value, (Only for Power factor panel): Positive: Negative :
NOTES : (*) Measure sequentially the insulation resistance between L 1-L2 / L2-L3 / L3-L1 / L1-
N / L2-N / L3-N and compare with the anticipated value. The worst measured value
shall only be recorded.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Current/time rating[mA / s]
NOTES : (*) Measure sequentially the insulation resistance between L 1-L2 / L2-L3 / L3-L1 / L1-
N / L2-N / L3-N and compare with the anticipated value. The worst measured value
shall only be recorded.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0333 PAGE 1 OF 1
Test result Positive [P] : Negative [N] : Test result Positive [P] : Negative [N] :
MEASURE. OF THE AUXILIARY INSULATION
CONTINUITY TEST
RESISTANCE
Circuit tested (from / to) R [mΩ]: Test volt [kV] : Duration [min] : R [antic. MΩ] :
Test result Positive [P] : Negative [N] : Test result: Positive [P] : Negative [N] :
NOTES :
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0334 PAGE 1 OF 1
MEASUREMENT OF THE INSULATION A.C. POWER FREQUENCY TEST (≥ 1kV) CONTINUITY TEST
RESISTANCE
circuit tested (from / to) Duration [min] : Test voltage [kV] : R (design MΩ] : R [measured MΩ] Test result
NOTES :
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
Initial cooling water temperature [°C] : Initial cooling air temperature [°C] :
Time [min]
Current [A]
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0367 PAGE 1 OF 1
Frequency [HZ] : Generator rating [V / KW] : Operating voltage [V] :
NO LOAD TEST RUN
Initial surface temperature [°C] : Initial bearings temperature [°C] : Initial lubrication oil temperature [°C] :
Initial cooling water temperature [°C] : Initial cooling air temperature [°C] :
Start-up current [A] : Start-up duration [s] :
Time [min] 30 60 90 120 150 180 210 240
Current [A]
Excitation voltage [V]
Excitation current [A]
Generator surface temperature [°C]
Bearing temperature (DE) [°C]
Bearing temperature (NDE) [°C]
Lubrication oil temperature [°C]
Cooling water temperature °[C]
Cooling air temperature [°C]
Vibration (horizontal radial) [mm/s]
Vibration (vertical radial ) [mm/s]
Vibration (axial) [mm/s]
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
SYSTEM PERFORMANCES
Time [min]
Excitation voltage [V]
Excitation current [A]
Voltage [V]
Current [A]
Frequency [Hz]
Active power output [kW]
Reactive power output [kVAR]
Power factor [p.u.]
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
tag Test
L1 to ΣL+E L2 to ΣL+E L3 to ΣL+E voltag 1 min. 5 min. 1 hour 24 hours
e [kV]
kV min. μA kV min. μA kV min. μA
Test result P N P N
NOTES: (*) A = Aboveground – U = Underground
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
NOTE : Attach sketch / drawing with identification of points measured
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
REPORT OF TOTAL EARTHING SYSTEM MEASUREMENT FOR THE TOTAL EARTH RESISTANCE
TAG/ITEM/AREA ENGINEERING DOCUMENT CODE/SPECIFICATION N.
NOTES :(*) Uemp(i) = (U2emp1(i) + U2emp2(i)) / 2 – U2edp(i) - (**) Rem = Uem / Iet-
(***)See IEEE 81-2 Eq 2 - ( Rec = k ( ρ / 2πC1 ) - (****)Re(i) = Rem(i) – Rc – Rec
Form code: MDT.EL.FTC.0720 Sh. 01 of 02 Rev. 0. 05
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
REPORT OF TOTAL EARTHING SYSTEM MEASUREMENT FOR THE TOTAL EARTH RESISTANCE
CDQ reference: MDT.EL.CDQ.0471 PAGE 2 OF 2
k - FACTOR TABLE
Φ [degree] P1 = C1 P1 = 0,5 C1
0 N.A. -1,00
15 1,84 -1,12
(***) 30 -0,067 -1,38
45 -0,69 -1,64
60 -1,00 -1,84
75 -1,18 -2,00
Error for earth mutual resistances
90 -1,30 -2,10
Rec = k ( ρ / 2πC1 ) [Ω]
By IEEE 81-2 105 -1,37 -2,18
120 -1,42 -2,24
135 -1,47 -2,28
150 -1,48 -2,31
165 -1,49 -2,33
180 -1,50 -2,33
EARTH VOLTAGE DIAGRAM (HORIZONTAL FLEX METHOD)
Uemp(i) [V]
P1(i) [m]
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
REPORT OF TOTAL EARTHING SYSTEM MEASUREMENT OF THE STEP AND TOUCH VOLTAGE
TAG/ITEM ENGINEERING DOCUMENT CODE/SPECIFICATION No.
REPORT OF TOTAL EARTHING SYSTEM MEASUREMENT OF THE IMPEDANCE OF THE EARTH FAULT RING
TAG/ITEM ENGINEERING DOCUMENT CODE/SPECIFICATION No.
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0472 PAGE 1 OF 1
Area / Unit: Execution:
System voltage : Frequency:
State of the neutral : Maximum trip time [sec] :
Phase to earth voltage (UO) [V] :
Switchgear :
TABLE OF TESTS
Protection device
Zg Ig = UO / Zg Test result
No. Circuit identification ttr (*) Itr (**)
[Ω] Type [A] (Ig > I5s )
[s] [A]
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
P N
NOTES : (*) ttr = Protection device tripping time as anticipated in the project documentation.
(**) Itr = Protection device tripping current corresponding to the tripping time ttr.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0471 PAGE 1 OF 1
Area / Unit / Equipment Execution:
System voltage : Frequency:
State of the neutral : Soil electrical resistivity [Ω x m]
Max single-phase to earth current [kA] :
Area(s) :
INSTALLATION DATA
Rod group [Y/N] : Rod group quantity [Nr] : Single rod [Y/N] :
Rods data
TABLE OF TESTS
Current
Rod / Rod group
Rod / Rod group electrode Voltage electrode
Test current
Measured
No. length distance distance resistance
identification [A]
[m] [m] [Ω]
[m]
NOTES :
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0492 PAGE 1 OF 1
Electrical Substation : Switchgear :
Switchgear rating [A] : Power transformer :
Power transformer rating [MVA / kV/kV] : Frequency [HZ] :
MEASUREMENT OF THE INSULATION RESISTANCE A.C. APPLIED VOLTAGE TEST FOR BUS DUCT ≥ 1kV
Test voltage [kV] : R [measured MΩ] : Test voltage [kV] : Test result [P/N]
Duration [min] : L… Duration [min] :
L1 L2 L3 N L1 L2 L3
R [anticipated MΩ] : to
to to to to to to to
L…/N Bus duct circuit tested
Bus duct circuit tested Earth Earth Earth Earth Earth Earth Earth
(*)
Test result Positive [P] : Negative [N] : Test result Positive [P] : Negative [N] :
NOTES: (*) Measure sequentially the insulation resistance between L1-L2 / L2-L3 / L3-L1 / L1-N / L2-N / L3-N and
compare with the anticipated value. The worst measured value shall only be recorded.
CONSTRUCT. SUBCONTR. SAIPEM COM TP2 CLIENT
NAME NAME NAME NAME NAME
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc
JOB UNIT
SONATRACH 032076
First Calgary Petroleums
QC CODE
REPORT NO.
MENZEL LEDJMET EAST PROJECT
CDQ reference: MDT.EL.CDQ.0483 PAGE 1 OF 1
Circuit tested
L to Earth
R
[measured N to Earth
MΩ]
L to N
Circuit tested
R [mΩ] N
This document is the property of Sonatrach and First Calgary Petroleums who will safeguard its rights according to the civil and penal provisions of the law.
Data file: 651823988.doc