1. The document reports on testing of burden cables for current transformers (CT) and capacitor voltage transformers (CVT) at the 150kV G.I. Juishin - Karawang substation.
2. Testing was conducted on March 8, 2023 and included measuring voltage, current, and burden (VA) for each cable core and comparing to standards.
3. All cable cores were found to meet standards except for two shorted cores marked in the remarks.
1. The document reports on testing of burden cables for current transformers (CT) and capacitor voltage transformers (CVT) at the 150kV G.I. Juishin - Karawang substation.
2. Testing was conducted on March 8, 2023 and included measuring voltage, current, and burden (VA) for each cable core and comparing to standards.
3. All cable cores were found to meet standards except for two shorted cores marked in the remarks.
1. The document reports on testing of burden cables for current transformers (CT) and capacitor voltage transformers (CVT) at the 150kV G.I. Juishin - Karawang substation.
2. Testing was conducted on March 8, 2023 and included measuring voltage, current, and burden (VA) for each cable core and comparing to standards.
3. All cable cores were found to meet standards except for two shorted cores marked in the remarks.
PT.INDO KARYA ELEKTRIK BURDEN CABLE CT & CVT 150KV PT.PLN (PERSERO) MANDIRI
Site : G.I. 150 KV JUISHIN - KARAWANG Date : 08 / 03 / 2023
Bay : KARAWANG
BURDEN CABLE OF CT 150KV
Phase R CT Standard Cable to Burden CORE RATIO REMARK Class VA MK RCP Relay Amp Volt VA 1S1 - 1S2 2000 / 1 PX - X311 X311/X311 F871/DFR 1,05 1,219 1,28 2S1 - 2S2 2000 / 1 5P20 20 X312 X312/X315 F501/BCU 1,08 1,199 1,29 3S1 - 3S2 2000 / 1 PX - X313 X3107 F8707 1,07 1,033 1,11 4S1 - 4S2 2000 / 1 PX - X314 - - 1,05 0,143 0,15 SHORT DI MK 5S1 - 5S2 2000 / 1 0,2S 20 X315 - KWH 1,09 1,036 1,13 Phase S CT Standard Cable to Burden CORE RATIO REMARK Class VA MK RCP Relay Amp Volt VA 1S1 - 1S2 2000 / 1 PX - X311 X311/X311 F871/DFR 1,01 1,148 1,16 2S1 - 2S2 2000 / 1 5P20 20 X312 X312/X315 F501/BCU 1,00 1,130 1,13 3S1 - 3S2 2000 / 1 PX - X313 X3107 F8707 1,03 1,102 1,14 4S1 - 4S2 2000 / 1 PX - X314 - - 1,05 0,205 0,22 SHORT DI MK 5S1 - 5S2 2000 / 1 0,2S 20 X315 - KWH 1,00 0,977 0,98 Phase T CT Standard Cable to Burden CORE RATIO REMARK Class VA MK RCP Relay Amp Volt VA 1S1 - 1S2 2000 / 1 PX - X311 X311/X311 F871/DFR 1,05 1,212 1,27 2S1 - 2S2 2000 / 1 5P20 20 X312 X312/X315 F501/BCU 1,04 1,207 1,26 3S1 - 3S2 2000 / 1 PX - X313 X3107 F8707 1,07 1,178 1,26 4S1 - 4S2 2000 / 1 PX - X314 - - 1,00 0,301 0,30 SHORT DI MK 5S1 - 5S2 2000 / 1 0,2S 20 X315 - KWH 1,01 0,976 0,99
BURDEN CABLE OF CVT 150KV
Phase R CVT Standard Cable to Burden CORE RATIO REMARK Class VA MK RCP Relay mA Volt VA 1a - 1n 150KV/100V 3P 15 X321 X321 DFR/F871/F501 1,30 57,9 0,075 2a - 2n 150KV/100V 0,2 15 X322 X322 KWH / BCU 1,01 57,4 0,058 Phase S CVT Standard Cable to Burden CORE RATIO REMARK Class VA MK RCP Relay mA Volt VA 1a - 1n 150KV/100V 3P 15 X321 X321 DFR/F871/F501 1,20 57,5 0,069 2a - 2n 150KV/100V 0,2 15 X322 X322 KWH / BCU 0,86 57,7 0,050 Phase T CVT Standard Cable to Burden CORE RATIO REMARK Class VA MK RCP Relay mA Volt VA 1a - 1n 150KV/100V 3P 15 X321 X321 DFR/F871/F501 1,20 57,7 0,069 2a - 2n 150KV/100V 0,2 15 X322 X322 KWH / BCU 0,88 57,1 0,050
TESTED BY WITHNESSED BY EVALUATED BY
PT.INDO KARYA ELEKTRIK PT.PLN (PERSERO)
PT.RAGAT SARANA TEKNIK PT.PLN (PERSERO) UPP JBT 3 PT.PLN (PERSERO) PUSERTIF MANDIRI PUSMANPRO UPMK 1