Hi Experts,

I have activated Material Ledger and Actual Costing. After that I tried to do the
“Production Startup of Mat. Ledger” (Set Valuation Areas as Productive – CKMSTART) I
am getting below error.

Cost component structure for period 007 / 2014 in plant XXXX not found

Message no. MLCCS003

Diagnosis

No cost component structure was found in valuation 2 for period 007 / 2014 in plant
XXXX.

I checked the Cost component structure and observed that Cost Component Structure
is active and assigned to Plant via Company Code.

I ran the transaction “Display of ML-Relevant Customizing settings – CKM9”. I noticed


that it is mentioned that “Currency and Valuation profile” is not active. I have created the
Currency and Valuation profile TP01 and have assigned the Currency type 30 and 10 to
it.

Please suggest.

Thanks and Regards,

Sudhir Harale

 Add a Comment
 Alert Moderator

Assigned Tags

 FIN Controlling
 FIN Material Ledger

Similar Questions

 Price Difference Account - ML force OK

Former MemberJan 24, 2011


 Standard Price release in Material ledger after material transaction

Former MemberDec 02, 2013

3 Answers
Отсортировать
Голоса
По дате создания
Oldest
Vote up 0 Vote down

Former Member
Aug 05, 2014 at 08:25 AM
Hi Experts,

I deselected the "Actual Cost Component Split Active" check box and observed that
“Production Startup of Mat. Ledger (CKMSTART)” is getting executed without error.

But I don’t know the impact of deactivating the "Actual Cost Component Split Active".

Please give your valuable advice.

Thanks for help.

Regards,

Sudhir Harale

Attachments

123.PNG (10.3 kB)

 Add a Comment
 Alert Moderator
 Share

Vote up 0 Vote down


Former Member
Aug 05, 2014 at 02:01 PM
Hi Sudhir ,

Use t-code OKTZ and select your Cost Component Structure , click on Assignment of
Org units.

Assign it to your Company code,costing variant,Plants and give the current period start
date and make sure that your CCS is activated.

Have a look on SAP notes 206629.

First try it in your Testing client.

Regards

Nirabh

 Add a Comment
 Alert Moderator
 Share

2 comments
Rajneesh Saxena
Aug 06, 2014 at 09:24 AM
Hi

I think in assignment to co code and plant date should be 01.07.2014. Remember that after change you need to activate the cost
component structure again.

Rajneesh

 Like 0
 Share
 Alert Moderator

Add a Comment
Show all
Vote up 0 Vote down

Former Member
Aug 06, 2014 at 07:03 AM
Hi Sudhir,

Please refer to SAP note 512144.

BR

Jiu-Bin

 Add a Comment