Hi Experts,
I have activated Material Ledger and Actual Costing. After that I tried to do the
“Production Startup of Mat. Ledger” (Set Valuation Areas as Productive – CKMSTART) I
am getting below error.
Cost component structure for period 007 / 2014 in plant XXXX not found
Diagnosis
No cost component structure was found in valuation 2 for period 007 / 2014 in plant
XXXX.
I checked the Cost component structure and observed that Cost Component Structure
is active and assigned to Plant via Company Code.
Please suggest.
Sudhir Harale
Add a Comment
Alert Moderator
Assigned Tags
FIN Controlling
FIN Material Ledger
Similar Questions
3 Answers
Отсортировать
Голоса
По дате создания
Oldest
Vote up 0 Vote down
Former Member
Aug 05, 2014 at 08:25 AM
Hi Experts,
I deselected the "Actual Cost Component Split Active" check box and observed that
“Production Startup of Mat. Ledger (CKMSTART)” is getting executed without error.
But I don’t know the impact of deactivating the "Actual Cost Component Split Active".
Regards,
Sudhir Harale
Attachments
123.PNG (10.3 kB)
Add a Comment
Alert Moderator
Share
Use t-code OKTZ and select your Cost Component Structure , click on Assignment of
Org units.
Assign it to your Company code,costing variant,Plants and give the current period start
date and make sure that your CCS is activated.
Regards
Nirabh
Add a Comment
Alert Moderator
Share
2 comments
Rajneesh Saxena
Aug 06, 2014 at 09:24 AM
Hi
I think in assignment to co code and plant date should be 01.07.2014. Remember that after change you need to activate the cost
component structure again.
Rajneesh
Like 0
Share
Alert Moderator
Add a Comment
Show all
Vote up 0 Vote down
Former Member
Aug 06, 2014 at 07:03 AM
Hi Sudhir,
BR
Jiu-Bin