This document contains a progress report on various road construction activities between April 1st and an unspecified date, listing 14 planning activities, their actual completion totals, targets, and percentages achieved. It includes statistics on observasi, DCP measurement, tyre cutting, widening several areas of the road, excavating bad material, base coarse compaction, drainage work, and remeasuring DCP points after compaction. Progress is also reported on moving poles at Simpang Spoker and additional tyre cutting.
This document contains a progress report on various road construction activities between April 1st and an unspecified date, listing 14 planning activities, their actual completion totals, targets, and percentages achieved. It includes statistics on observasi, DCP measurement, tyre cutting, widening several areas of the road, excavating bad material, base coarse compaction, drainage work, and remeasuring DCP points after compaction. Progress is also reported on moving poles at Simpang Spoker and additional tyre cutting.
This document contains a progress report on various road construction activities between April 1st and an unspecified date, listing 14 planning activities, their actual completion totals, targets, and percentages achieved. It includes statistics on observasi, DCP measurement, tyre cutting, widening several areas of the road, excavating bad material, base coarse compaction, drainage work, and remeasuring DCP points after compaction. Progress is also reported on moving poles at Simpang Spoker and additional tyre cutting.
Ukur DCP 3 14 21.43% Progres Cutting Tyre 5 50 10.00% Pelebaran Area Jalan - Jalan Bawah Change Shift 150 300 50.00% - Simpang Spoker 15 40 37.50% - Tikungan Timur 3 6 50.00% - Tanjakan View Point 200 400 50.00% - Jalan Spoker Ke Disposal 100 300 33.33% Penggalian Bad Material Penimbunan Good Base Coarse Compacting Jalan Ukur DCP (Evaluasi) Drainage 3 14 21.43% Activity 1 April 2021 Pengukuran 3 Titik DCP