You are on page 1of 29

325

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253701
Drawing Number

P01 14/05/20 First Revision SB KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Foundations Reinforcement 1

Designed Signed Date


KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253701 P02

Sheet Size A1 594 x 841


326

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253702
Drawing Number

P01 14/05/20 First Revision SB KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Foundations Reinforcement 2

Designed Signed Date


KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253702 P02

Sheet Size A1 594 x 841


327

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253703
Drawing Number

P01 14/05/20 First Revision SB KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Foundations Reinforcement 3

Designed Signed Date


KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253703 P02

Sheet Size A1 594 x 841


328

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253722
Drawing Number

P01 14/05/20 First Revision IG KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Slab and Wall Reinforcement
1 of 5
Designed Signed Date
KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253722 P02

Sheet Size A1 594 x 841


329

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253723
Drawing Number

P01 14/05/20 First Revision IG KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Slab and Wall Reinforcement
2 of 5
Designed Signed Date
KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253723 P02

Sheet Size A1 594 x 841


345

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253724
Drawing Number

P01 14/05/20 First Revision IG KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Slab and Wall Reinforcement
3 of 5
Designed Signed Date
KEVIN SUMNER KS 01/09/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253724 P02

Sheet Size A1 594 x 841


346

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253725
Drawing Number

P01 14/05/20 First Revision IG KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Slab and Wall Reinforcement
4 of 5
Designed Signed Date
KEVIN SUMNER KS 01/09/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253725 P02

Sheet Size A1 594 x 841


347

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253726
Drawing Number

P01 14/05/20 First Revision IG KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Slab and Wall Reinforcement
5 of 5
Designed Signed Date
KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253726 P02

Sheet Size A1 594 x 841


330

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253727
Drawing Number

P01 14/05/20 First Revision IG KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
RC Details of
PTI Structure Foundation
Designed Signed Date
KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253727 P02

Sheet Size A1 594 x 841


349

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253729
Drawing Number

P01 14/05/20 First Revision IG KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Service Core Slab RC Details
1 of 2
Designed Signed Date
KEVIN SUMNER KS 01/09/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253729 P02

Sheet Size A1 594 x 841


367

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253730
Drawing Number

P01 14/05/20 First Revision SB KS ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


Back of P7
Service Core Slab RC Details
2 of 2
Designed Signed Date
KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253730 P02

Sheet Size A1 594 x 841


307

Legend/Notes

Drawing List Airport Entrance - P7 Substructure

P03
Steelwork Reinforced Concrete Waterproofing And Surfacing
1) 142637-COT-00000-ZZ-DRG-EST-250003 General Notes
Notes: Notes: Notes:
2) 142637-COT-03000-ZZ-DRG-EST-253101 Existing General Arrangement
1. Steel plates and rolled sections to be grade S355j2 to BS EN 10025- 1. All concrete to adhere to BS EN 206:2013 for specification, 1. Waterproofing details are shown and noted on detail drawings.
142637-COT-00000-ZZ-DRG-EST-252003 2. performance, production and conformity.
3) 142637-COT-03700-10-DRG-EST-253104 Platform 7 Proposed GA
2. Each step nosing shall incorporate a permanently contrasting
2. All welds are to be 8mm continuous fillet welds unless stated 2. All concrete and concrete works are to be in accordance with continuous material for the full width of the stair both on the tread and
4) 142637-COT-03700-ZZ-DRG-EST-253506 North Escalator Pit GA & Details
otherwise. standard specification NR/L3/CIV/140 sections 1700 & 85 on the riser. The contrasting material shall be between 50mm to
66mm wide on the tread and 30mm to 55mm on the riser and should
5) 142637-COT-03700-ZZ-DRG-EST-253507 Combined Lift Pit GA & Details 1
3. Steelwork to be ce marked in accordance with BS EN 1090. Quality 3. All exposed arises to have 25x25 chamfers unless noted contrast visually with the remainder of the tread and riser.
of workmanship to be execution class EXC3 in accordance with BS otherwise.
6) 142637-COT-03700-ZZ-DRG-EST-253508 Combined Lift Pit GA & Details 2
EN 1090-2. 3. Surfacing and colouring shall conform to applicable standards and
4. Inspection of precast units is to be undertaken as detailed in guidance contained in current version of code of practice publication
7) 142637-COT-03700-ZZ-DRG-EST-253509 North Escalator Equipment Room GA & Details
4. For all staircase bolted connections a black bolt connection in Network Rail Specification NR/l3/civ/140 section 130. design standards for accessible railway stations.
accordance with BS EN 1993-1-8 & BS EN 14399 shall be used
8) 142637-COT-03700-ZZ-DRG-EST-253510 South Escalator Equipment Room GA & Details
unless stated otherwise. 5. 50mm minimum blinding to be laid for all in-situ reinforced 4. For surfacing details refer to Architectural drawings and specification
concrete cast on ground
9) 142637-COT-03700-ZZ-DRG-EST-253512 South Escalator Pit GA & Details
5. With the exception holding down anchors, which will be specitfied by
the designer, the contractor shall be responsible for determining the 6. Blinding concrete to be grade ST2 (C8/10)
10) 142637-COT-03700-ZZ-DRG-EST-253513 P7 Wall Details
number and lengths of bolts required.
7. Finishes shown are a structural minimum, refer to Architectural
11) 142637-COT-03700-ZZ-DRG-EST-253705 P7 South Escalator Pit Reinforcement*
6. Protective treatment to new external steelwork is N1F in accordance drawings and specification for 'special' finishes.
with NR/L3/CIV/039, NR/L3/CIV/040 and NR/GN/CIV/002. Perimeter
12) 142637-COT-03700-ZZ-DRG-EST-253706 P7 North Escalator Pit Reinforcement*
of all plates, bolts and washers sealed using a compatible 8. Formed surfaces.
polysulphide sealant. Colour to Arcitects specification
13) 142637-COT-03700-ZZ-DRG-EST-253707 P7 Combined Lift Pit Reinforcement 1*
F1 -surfaces hidden from view; pile caps, hidden surfaces of
Drawing Number

7. Welding terms and symbols in accordance with BS EN 2253:1995 to abutments, retaining walls and construction joints.
14) 142637-COT-03700-ZZ-DRG-EST-253708 P7 Combined Lift Pit Reinforcement 2*
be used. F2 - surfaces normally hidden from view, those exposed not
requiring a 'special' and those to receive a waterproofing system.
15) 142637-COT-03700-ZZ-DRG-EST-253709 P7 North Escalator Equipment Room Foundation Reinforcement*
8. During trial erection bolts of identical size required in the final 'Special' finish - Refer to Architectural Specification: 142637-
structure shall be used for connecting components and tightened COT-00000-ZZ-EAR-250020.
16) 142637-COT-03700-ZZ-DRG-EST-253710 P7 South Escalator Equipment Room Foundation Reinforcement*
(hand tight) to ensure fit up.
9. Unformed surfaces
17) 142637-COT-03800-ZZ-DRG-EST-253501 Service Core Pile Cap & Ground Beam Layout Sheet 1 of 2
9. All structural hollow sections to be grade S355j2h to BS EN 10210-1.
U1 - surface of blinding layer
18) 142637-COT-03800-ZZ-DRG-EST-253502 Service Core Slab & Wall General Arrangement Sheet 1 of 3
10. For complete details of the specification for the protective treatment of U2 - surface not exposed to view or buried.
steelwork, see network rail model clauses for specifying civil U3 - minimum for surfaces exposed to view, including but not
19) 142637-COT-03800-ZZ-DRG-EST-253503 Service Core Slab & Wall General Arrangement Sheet 2 of 3
engineering work, section 170-176. limited to direct-finished concrete wearing slabs, bearing shelves
anmd tops of walls.
20) 142637-COT-03800-ZZ-DRG-EST-253504 Service Core Slab & Wall General Arrangement Sheet 3 of 3
11. Protective treatment to be allowed to cure for 7 days prior to stacking U4 - surfaces including road slabs and bridge decks which are to
or transportation of the steelwork. receive approved waterproofing systems.
21) 142637-COT-03800-ZZ-DRG-EST-253505 UKPN General Arrangement and Details
12. For minor remedial works and site connection spray grade paints may 10. Tying wires for reinforcement is to be 1.2mm dia stainless steel.
22) 142637-COT-03800-ZZ-DRG-EST-253511 Service Core Pile Cap & Ground Beam Layout Sheet 2 of 2
be brushed applied.
23) 142637-COT-03800-ZZ-DRG-EST-253520 Service Core Access Staircase Details
13. Holding down bolts to be formed by grade 8.8 minimum galvanised 11. Exposure classes in accordance with BS EN 206 and BS 8500-
threaded bar with galvanised nuts and washers U.N.O. 1. Non-aggressive soil conditions are assumed. More aggressive
24) 142637-COT-03800-ZZ-DRG-EST-253521 Service Core Wall Details
chemical environments may require additional cover - this will be
explicitly stated.
25) 142637-COT-03800-ZZ-DRG-EST-253701 Back of P7 Foundations Reinforcement 1*
12. All concrete to have nominal maximum aggregate size = 20mm.
26) 142637-COT-03800-ZZ-DRG-EST-253702 Back of P7 Foundations Reinforcement 2 *
Concrete mix composition to be specified in accordance with
NR/L3/CIV/140 section 1700, BS EN 206:2013 and BS 8500-1
27) 142637-COT-03800-ZZ-DRG-EST-253703 Back of P7 Foundations Reinforcement 3*
and NR/L3/CIV/140:1700 for an intended working life of at least
100 years. average density of concrete not to exceed 2500kg/m³.
28) 142637-COT-03800-ZZ-DRG-EST-253704 Back of P7 Foundations Reinforcement 4*
13. Stated cover is nominal cover which includes fixing tolerance of ±
29) 142637-COT-03800-ZZ-DRG-EST-253722 Back of P7 Slab and Wall Reinforcement 1*
10mm. Nominal cover can be reduced by 5mm where fabrication
is subjected to a quality assurance system (e.g. precast
30) 142637-COT-03800-ZZ-DRG-EST-253723 Back of P7 Slab and Wall Reinforcement 2*
elements) in accordance with BS EN 1992-1-1 & UK NA.
31) 142637-COT-03800-ZZ-DRG-EST-253724 Back of P7 Slab and Wall Reinforcement 3*
14. Internal dimensions of lift shaft has a fixing tolerance of -0-25mm.
32) 142637-COT-03800-ZZ-DRG-EST-253725 Back of P7 Slab and Wall Reinforcement 4*
15. Reinforcement to be grade 500, class B, deformed type 2 high
yield bars in accordance with BS EN 1992-2 & UK NA, BS EN
33) 142637-COT-03800-ZZ-DRG-EST-253726 Back of P7 Slab and Wall Reinforcement 5*
10080 and BS 4449.
* - Reinforcement drawings not to be issued for IDC
16. All reinforcement must be provided by a Cares approved supplier.
All reinforcement must have an un-broken chain of Cares.
Key Plan

N
17. Tack or splice welding of reinforcement is not permitted.

18. Scheduling of reinforcement is to be in accordance with


BS8666:2005.
Specifications 19. Reinforcement bars that clash with bolts/anchors may be locally
displaced around the bolt/anchors.
The Scheme Is To Be Constructed In Accordance With The Standard
Network Rail Specifications NR/L3/CIV/140 Issue 12 20. Grouting underneath steel baseplates to be 35mm thick (unless
noted otherwise) high strength, high flow and low shrinkage
010 General Specification ( Including Appendices ) cementitious grout. Minimum strength of grout at 28 days to be
40n/mm².
040 Demolition & Site Clearance
21. Reinforcement is called up as follows:
050 Earthworks and Excavations
32 H 16 - 01 - 150 B2 NF
051 Excavation
Location
085 Concrete For Ancillary Purposes
Spacing
170 Protective treatments Bar mark
P01 10/07/20 IDC Issue HG AM ---
Dia. of bars
171 Maintenance coating P02 10/07/20 IDC Issue JH AM ---
Type of steel
172 Protective coating of new structural steelwork No. of bars (xx = varies ) P03 04/09/20 Updated CAT 3 Issue DG KS ---

Rev Date Description of Revisions Drawn Chkd Appr


173 Protective coating of existing structural steelwork and ironwork Abbreviations used:
Status Suitability
1700 Structural Concrete NF
FF
- Near face
- Far face
Suitable for Co-ordination S1
1800 Steelwork
EF - Each face
130-134 Inspection Works T - Top
T1 - Top bar outermost layer
T2 - Top bar innermost layer

General B
B1
- Bottom
- Bottom bar outermost layer
Notes: B2 - Bottom bar innermost layer
AB - Alternatively placed bars
1. All dimensions are in millimetres unless stated otherwise. In which unhatched zones equate to 'good' bond conditions.
hatched zones equate to 'poor' bond conditions.
2. All levels are in meters above ordnance datum to xrail 09 unless stated
otherwise.
Extract from BS EN 1992-2
Authorised Signed Date
3. Do not scale from the drawings.
--- ---
4. Standard colour key: Contractor(s)
REINFORCEMENT IN TENSION. BAR
Black - Existing or unchanged assets BOND DIAMETER, Ø (mm) REINFORCEMENT
Blue - Assets to be modified ANCHORAGE DEPTH CONDITION IN COMPRESSION
Green - Existing assets to be removed or abandoned 12 16 20 25 32 40
Red - Proposed assets Location\Level
Orange - Proposed assets designed by other disciplines or GOOD 290 440 600 800 1070 1490 35 Ø All Levels
STRAIGHT BARS
works to be submitted in another package
ONLY Type Sub-type
Magenta - Temporary works POOR 420 630 860 1140 1530 2130 50 Ø
CAD Drawing
Grey - OS/Survey data
GOOD 200 390 480 600 770 1050 35 Ø Role Discipline

5. The contractor shall be responsible for the design, fabrication, erection and OTHER BARS Structure
POOR 290 550 690 860 1100 1490 50 Ø
removal of all temporary works. Volume\System

GOOD 290 440 600 800 1070 1490 35 Ø Site Wide


6. The contractor is to check all setting out prior to the commencement of the % LAPS <25% Phasing Grip Stage
works. POOR 420 630 860 1140 1530 2130 50 Ø 5
Project
7. The units are to be uniquely numbered and the packing requirement recorded GOOD 340 510 690 920 1230 1720 40 Ø
during the trial erection to assist installation of the units on site during the LAP DEPTH % LAPS <33%
possession. POOR 480 720 980 1310 1760 2450 57 Ø Gatwick Station Development
8. The unique numbering shall be clear and readable and should be visible whilst GOOD 410 620 840 1110 1500 2090 48 Ø Contract No.
% LAPS <50%
the units are installed.
POOR 580 880 1200 1590 2140 2980 69 Ø
9. Elements are to be marked clearly with relevant reference and East or West /
142637
GOOD 440 660 900 1190 1610 2240 52 Ø
North or South end elements to ensure correct placement. % LAPS >50% Contract Title
POOR 620 940 1280 1700 2290 3200 74 Ø

NOTES:
Gatwick Station Development
1. NOMINAL COVER TO ALL SIDES IS >40mm; AT LAPS A CLEAR DISTANCE BETWEEN BARS IS >75mm. Drawing Title

2. ALPHA VALUES HAVE BEEN CALCULATED IN ACCORDANCE WITH NOTE 1.


3. DESIGN STRESS HAS BEEN TAKEN AS 435N/mm² IN THE BARS AT THE POSITION OF ANCHORAGE SO BARS USED MUST HAVE A MINIMUM Airport Entrance - P7 Substructure
FYK = 500N/mm².
4. ANCHORAGE AND LAP LENGTHS HAVE BEEN ROUNDED UP TO THE NEAREST 10mm. General Notes
5. FOR THE DEFINITION OF 'GOOD' AND 'POOR' BOND CONDITION (SEE BELOW)
6. THE ABOVE VALUES HAVE BEEN CALCULATED FOR C32/40 CONCRETE, TO CONVERT TO OTHER CONCRETE STRENGTHS MULTIPLY BY
THE FACTORS BELOW.

CONCRETE CLASS C20/25 C25/30 C28/35 C30/37 C35/45 C40/50 C45/55 C50/60

Designed Signed Date


ADJUSTMENT FACTOR 1.368 1.179 1.093 1.044 0.942 0.861 0.798 0.743 KEVIN SUMNER KS 09/07/20
Drawn Signed Date
D.GRANDICH DG 02/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

N/A VTB3 26m 37ch to 26m 62ch


Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-00000-ZZ-DRG-EST-252003 P03

Sheet Size A1 594 x 841


304

Legend/Notes

P02
142637-COT-03700-ZZ-DRG-EST-253705
Drawing Number

P01 29/05/20 First Revision JH AM ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing Schematic
Role Discipline
Structure
Volume\System
Platform 7
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


P7 South Escalator Pit
Reinforcement

Designed Signed Date


KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown VTB3 to 26m 62ch


Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03700-ZZ-DRG-EST-253705 P02

Sheet Size A1 594 x 841


296

Legend/Notes

P02
142637-COT-03700-ZZ-DRG-EST-253706
Drawing Number

P01 29/05/20 First Revision JH AM ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing Schematic
Role Discipline
Structure
Volume\System
Platform 7
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


P7 North Escalator Pit
Reinforcement

Designed Signed Date


KEVIN SUMNER KS 26/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown VTB3 to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03700-ZZ-DRG-EST-253706 P02

Sheet Size A1 594 x 841


319

Legend/Notes

P02
142637-COT-03700-ZZ-DRG-EST-253707
Drawing Number

P01 29/05/20 First Revision JH AM ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Platform 7
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


P7 Combined Lift Pit
Reinforcement 1

Designed Signed Date


KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03700-ZZ-DRG-EST-253707 P02

Sheet Size A1 594 x 841


321

Legend/Notes

P02
142637-COT-03700-ZZ-DRG-EST-253708
Drawing Number

P01 29/05/20 First Revision JH AM ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Platform 7
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


P7 Combined Lift Pit
Reinforcement 2

Designed Signed Date


KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03700-ZZ-DRG-EST-253708 P02

Sheet Size A1 594 x 841


322

Legend/Notes

P02
142637-COT-03800-ZZ-DRG-EST-253709
Drawing Number

P01 16/06/20 First Revision JH AM ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Back of Platform 7 (including Service Core)
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


P7 North Escalator
Equipment Room
RC details
Designed Signed Date
KEVIN SUMNER KS 26/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown VTB3 to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03800-ZZ-DRG-EST-253709 P02

Sheet Size A1 594 x 841


323

Legend/Notes

P02
142637-COT-03700-ZZ-DRG-EST-253710
Drawing Number

P01 16/06/20 First Revision JH AM ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Platform 7
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


P7 South Escalator
Equipment Room
RC Details
Designed Signed Date
KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03700-ZZ-DRG-EST-253710 P02

Sheet Size A1 594 x 841


324

Legend/Notes

P02
142637-COT-03700-ZZ-DRG-EST-253711
Drawing Number

P01 29/05/20 FIrst Revision JH AM ---

P02 04/09/20 Final Cat III Check JH KS ---

Rev Date Description of Revisions Drawn Chkd Appr

Status Suitability

Suitable for Co-ordination S1

Authorised Signed Date


--- ---
Contractor(s)

Location\Level
All Levels
Type Sub-type
CAD Drawing
Role Discipline
Structure
Volume\System
Platform 7
Phasing Grip Stage
Proposed 5
Project

Gatwick Station Development


Contract No.

142637
Contract Title

Gatwick Station Development


Drawing Title

Airport Entrance - P7 Substructure


P7 Substructure Combined Lift Pit
Wall Reinforcement Details

Designed Signed Date


KEVIN SUMNER KS 28/08/20
Drawn Signed Date
J.HUNTER JH 03/09/20
Checked Signed Date
K.SUMNER KS 04/09/20
Approved Signed Date
-- ---
Scale(s) ELR & Mileage

As Shown to
Alternative Reference Sheet

of

Drawing Number Revision

142637-COT-03700-ZZ-DRG-EST-253711 P02

Sheet Size A1 594 x 841