JABALPUR DEVELOPMENT AUTHORITY JABALPUR

TENDER SCHEDULE
NAME OF WORK:- Constration of Cement Concrete Road at Scheme No. 5 Near P/No 1269

i rum er Amount 1(5.311UUU.UU


S. No. Particular of items Quantity Rate Per 5.0 RI/p. MP.
PWD Binding
work S.O.R.
75/03/2022
Excavation in Soil by Manual Means 150.00 156.00 m3 19/3.1
Excavation for roadway in soil including loading in
truck for carrying of cut earth to embankment site with
all lifts and lead upto1000 metres as per clauses of section-
300.

2 Construction of embankment with approved material havng 30.00 155.00 m3 20/3.13


CBR>7 ovtained from borrow pits with all lift and leads
transporting to site spreading grading to required slope and
compacting to meet requirement of table 300-1, 300-2 and as
per relevent clauses of section-300

3 Construction of granular sub-base by providing well 45.37 934.00 m3 73,14.1


graded material like natural sand crushed gravel or
crushed stone having CBR >30, spreading in uniform layers
with motor grader on prepared surface, mixing by mix in
place method with rotavator or plant mix method at
OMC, and compacting with vibratory rollers of 80 to 100
kN static weight to achieve the desired density, complete as
per Clause 401 of Specification.

4 Deduction for item No.4.1, 4.2, 4.3, 4.4, 4.5, 4.6 & 4.8 if
vibratory roller / motor grader is not used with prior
written approval by C.E. :
If static roller is used in place of vibratory roller.
If motor grader is not used. 50.00 m3 2<./4.9(i)
- 50.00 m3 2414.900
5 Providing, laying, spreading and compacting stone aggregates
of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing,
rolling with vibratory roller 8-10 tonnes in stages to
proper grade and camber, applying and brooming
requisite type of screening/ binding Materials to fill up
the interstices of coarse aggregate, watering and
compacting to the required density as per clause 404 of
specification.
Grading-1 (63 to 45mm)
Grading-11 (53 to 22.4mm) 10.00 1347.00 m3 24/4.8(0(a)
14.62 1250.00 m3 24/4 Egli)
6 Deduction for item No.4.1, 4.2, 4.3, 4.4, 4.5, 4.6 & 4.8 if
vibratory roller / motor grader is not used with prior
written approval by C.E. :
If static roller is used in place of vibratory roller.
If motor grader is not used.
- 50.00 :113 24/4.90)
50.00 m3 24/4S(ii)
7 Construction of dry lean cement concrete Sub- base 9.50 2767.00 :n3 35/5.1
over a prepared sub-grade with coarse and fine aggregate
conforming to IS: 383, the size of coarse aggregate not
exceeding 25 mm, aggregate cement ratio not to exceed
15:1, aggregate gradation after blending to be as per table
600-1, cement content not to be less than 150 kg/ cum,
optimum moisture content to be determined during trial
length construction, concrete strength not to be less than
10 Mpa at 7 days, mixed in a batching plant, transported to
site, laid with a paver with electronic sensor, compacting with
8- 10 tonnes vibratory roller, finishing and curing as per
clause 601 of specification complete in all respect.
E Deduct from Item No.6.1 above if paver with electronic 150.00 m3 26/52
sensor, vibratory roller are not used and laying, compaction is
done by any other method.
(The acceptance criteria regarding level, thickness,
surface regularity, texture finish, strength of concrete and all
other quality control measures shall be the same as in
case of machine laid work.) .

9 Construction of un-reinforced, dowel jointed, plain 27.37 5685.0D m3 26/C2.4


cement concrete pavement M-30 grade concrete over a
prepared sub base with cement , coarse and fine aggregate
conforming to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a batching and mixing plant
as per approved mix design, transported to site, laid
with a fixed form or slip form paver, spread, compacted
and finished in a continuous operation including
provision of contraction, expansion, construction and
longitudinal joints, joint filler, separation membrane,
sealant primer, joint sealant, debonding strip, admixtures
as approved, curing compound, finishing to lines and grades
as per drawing as per IRC 15 2011 and as per relevant
clauses of section 602 of specifications complete but
excluding cost of steel in dowel bar
and tie rods etc.

10 Deduct from Item No.6.3 & 6.4 above if paver with 350.0C m3 37/6.5
electronic sensor is not used and laying, compaction is
done by any other method
(The acceptance criteria regarding level, thickness,
surface regularity, texture finish, strength of concrete and all
other quality control measures shall be the same as in
case of machine laid
work.)
11 Add extra in item no. 6.3,6.4,6.6&6.10 above for the cost of 229.06 63587.00 MT 37 /63
steel in dowel bar and tie rod including craddle laps etc. 0.229
complete required as per design.

12 Construction of shoulders with approved material/selected 53.10 223.0D m3 25/4.13(B)


soil i/c excavation all lifts & leads i/c grading to required
slope & camber of 4% and compacting using vibratory roller
of 80 to 100 kN static weight to meet requirement as per
relevant clause of 400.
13 Deduction for item No.4.13 if vibratory roller / motor grader
is not used with prior written approval by CE. :
1. If static roller is used in place of vibratory roller.
1. If motor grader is not used. 50.00 m3 25/4.16(i)
50.00 m3 25/4.150a

--\\
c
En A.E. E.E.
J.D.A. f. D.4.