You are on page 1of 2

Project: 21 SQM.

STUDIO TYPE UNIT INTERIOR FIT-OUT ( UNIT 246)


Client: BRENDA Q. CORDOVA
Location:

Subject: Method Statement


TILING WORK
GENERAL:
MATERIALS:
A. Tiles
B. Adhesive
C. Grout
TOOLS & EQUIPMENT:
A. Grinder
EXECUTION:
1. The area of substrate to be tiled shall be brushed clean.
2. Provide temporary but rigid lumber for guide/reference to check alignment.
3. Setting out shall be done by the worker approved by the contractor, provide symmetry
about center lines of the space or area to minimize tile cutting.
4. Tiling should be started from the start point as fixed on the approved shop drawings.
5. Apply tile adhesive to the floor with the required thickness
6. The tiles shall be neatly cut before laying
7. When the installation has hardened sufficiently (after 24 hours) a thick grout of
cement mixed with a minimum amount of water shall be prepared and brushed over
the floor until all the joints are thoroughly filled.
Subject: Method Statement
CABINET INSTALLATION
GENERAL:
MATERIALS:
A. BUILT-IN CABINETS
TOOLS & EQUIPMENT:
B. Grinder
EXECUTION:

You might also like