(NONM) Non-Maintenance Work

R3456275
*R3456275*
Print Date: 4/3/2023
CIMERWA Instrumentation foreman plant section Resp: Philippe Ahishakiye
Stationary or In Motion

Asset Detail: RC JM3-1 PH021 84.14Q Event: Job Start Date: 2023/04/03
Asset Imp: 7
84.14Q, Seperator oil service station
Resp Trade: Instr. / Electronic Technician
R3456275
Total Job: Duration hrs: 00:00 Downtime hrs: 00:00 Requester: Anita Uwineza Date Created: 2023/04/03
Work Priority: Status: Approved Required By: 2023/04/08
STOP Hours Capt
Check Work Performed Planned 5 Why Rework Down - OT
Sheet: time

Callout OT NT UnPlanned Failure Improvement NT


Analysis
Work Request & Reason:
Please attend to check separator lub. station is flashing
Name: Signature: Date:
Problem Identified:

Corrective Action Taken:

J/X Imp ACP Task Added Detail: Interval Time (Min)


Future Preventive Actions:

Name Signature Compl date/time NT OT x1.5 OTx2

Provide Failure Analysis for Work Performed


Failed Assembly: Failure:

Failed Component: Root Cause:

Production Downtime From: Repair Type:

Production Downtime To:


Done In Not Done Comment
Progress
Requisitioned Item Required

Approved By Signature: Date:

Page: 1 of 2
(NONM) Non-Maintenance Work
R3456277
*R3456277*
Print Date: 4/3/2023
CIMERWA Instrumentation foreman plant section Resp: Philippe Ahishakiye
Stationary or In Motion

Asset Detail: RC JM3-1 SU026 84.19 Event: Job Start Date: 2023/04/03
Asset Imp: 7
84.19, Dust collector
Resp Trade: Instr. / Electronic Technician
R3456277
Total Job: Duration hrs: 00:00 Downtime hrs: 00:00 Requester: Anita Uwineza Date Created: 2023/04/03
Work Priority: Status: Approved Required By: 2023/04/08
STOP Hours Capt
Check Work Performed Planned 5 Why Rework Down - OT
Sheet: time

Callout OT NT UnPlanned Failure Improvement NT


Analysis
Work Request & Reason:
Please fix air leakage
Name: Signature: Date:
Problem Identified:

Corrective Action Taken:

J/X Imp ACP Task Added Detail: Interval Time (Min)


Future Preventive Actions:

Name Signature Compl date/time NT OT x1.5 OTx2

Provide Failure Analysis for Work Performed


Failed Assembly: Failure:

Failed Component: Root Cause:

Production Downtime From: Repair Type:

Production Downtime To:


Done In Not Done Comment
Progress
Requisitioned Item Required

Approved By Signature: Date:

Page: 2 of 2