REQUEST FOR PRICE QUOTATION


Date:
RFQ No.:

Company Name:
Address:
TIN:
Business Permit No.:
PhilGEPS Cert. No.:

Please quote your best offer for the item/s described below, subject to the Terms and Conditions
provided at the back portion of this request for quotation. Submit your quotation duly signed by you or your duly
authorized representative not later than _____________.
Open quotations may be submitted, manually or through facsimile or email at the address and contact
number indicated below.
Atty. MAY ANGELI M. ESTOLAS
Acting Chief, Procurement Office
After having carefully read and accepted the Terms and Conditions, I/We submit our quotation/s for the
item/s as follows:
OFFER
Approved Compliance with
Unit of Budget for the Price Technical
Item Description Qty.
Issue Contract Specifications Remarks
(ABC)
(Inclusive of Tax) (please check)

Unit Price Total Price Yes No

Supply and Installation of 1 lot 800,000.00


Overhead Tank with Steel
Framing at Gusaling Villegas,
Pamantasan ng Lungsod ng
Manila
Scope of Work
1. Installation of Two (2) units
Overhead Tank, 10,000
liters/unit
Color: Blue
Warranty: Five (5) Years
2. Dismantling of existing
Overhead Tank and Steel
Framing
3. Clearing of area for
Fabrication of Steel Frame and
Steel Ladder
4. Fabrication of Steel Frame and
Steel Ladder using:
• GI Pipe, schd. 40 x 1-
1/2”  x 20’
• GI Pipe, schd. 40 x 2” 
x 20’
• MS Flat Bar, 3mm thk x
1” x 20’
• MS Rod, 10mm  x 20’
• MS Plate, 6mm thk x 4 x
8’
Gen. Luna cor. Muralla Sts., Intramuros, Manila
Telefax No. (02)8528-4592,Email add: ncdiscaya@plm.edu.ph
1|Page
• MS Plate, 3mm thk x 4 x
8’
• MS Angle Bar, 6mm x 3”
x 3” x 20’
• MS Angle Bar, 6mm x 2”
x 2” x 20’
5. Preparation of the area and
surroundings for lifting activities
6. Lifting of 2 units, 10,000L
Overhead Tank
7. Installation of 2 units, 10,000L
Overhead Tank at location
8. Tapping of new pipe to inlet
and outlet fitting of the newly
installed Overhead Tank
9. Testing and Commissioning
10. Turn-over of 2 units, 10,000L
Overhead Tank to End-user
11. Demobilization
No. of days of complete the
project: 75 Calendar Days
Terms of Reference
1. The Contractor must be
PhilGEPS Registered
2. The Contractor shall conduct
site survey, review the Design,
Cost Estimate, Technical
Specifications and Scope of
Work prior submission of
quotation.
3. The Contractor shall strictly
follow the drawings,
specification and BOQs of the
contract documents
4. The Contractor shall process
and secure all the necessary
permits as required by
authorities for the preparation,
execution and upon completion
of the contract.
5. The Contractor shall assign a
Full-time Project Engineer to
oversee the construction
activities
6. The Contractor shall submit
Weekly Accomplishment Report
7. Construction Works
The Contactor shall perform the
following activities during
construction bit is not limited to
the following:
a. Mobilization/Demolition
Mobilization shall include the
obtaining and transporting to
jobsite of equipment, materials,
tools, personnel and all
necessary items for the
execution and completion of the
Gen. Luna cor. Muralla Sts., Intramuros, Manila
Telefax No. (02)8528-4592,Email add: ncdiscaya@plm.edu.ph
2|Page
work.
b. Temporary Facilities
The Contractor shall provide
sub-meters for water and power
supplies
c. Demobilization
Shall include dismantling and
removal from the site of the
Contractor’s materials and
equipment and all temporary
facilities. It also include a clean-
up of the site after completion of
the contract as well as
transportation from the site of
the Contractor’s personnel
d. Site Clearing and Proper
Waste Disposal
Clearing operations include the
removal of demolished materials
and objectionable matter,
protection of existing
structures/facilities left
functional and clearing to allow
for new construction protection
necessary to prevent damage to
existing structures and facilities.
Likewise, disposal of materials,
trash and debris in a safe and
acceptable manner in
accordance with applicable laws
and ordinances.
8. The Contractor shall provide
adequate signage and safety
precautions in the entire
proximity of the Project site.
9. The Contractor shall strictly
observe the sanitation, safety
and security rules and
regulations of the PLM in the
execution of this project.
10. Any damage to the system,
facilities and equipment of the
PLM due to negligence, theft or
pilferage, directly or indirectly
caused by the Contractor
personnel shall be immediately
repaired, restored or replaced by
the Contractor for its account.
Any repair, restoration made by
PLM for the same purpose shall
be deducted from any payable
account of the Contractor.
11. The Contractor shall be
responsible for all injury to
persons or damage to PLM and
other property caused by the
execution of the works and shall
be liable for any claims against
PLM on account of such injury
Gen. Luna cor. Muralla Sts., Intramuros, Manila
Telefax No. (02)8528-4592,Email add: ncdiscaya@plm.edu.ph
3|Page
and/or damage.
12. The Contractor shall turn-
over the project
“SATISFACTORILY COMPLETED”.
PR 05-26-01 PFMO

This is to certify that I Payment Terms: ______________ _________________________________________________

personally conducted the (Signature over Printed Name)


canvass and that the data -0 Delivery Period: ______________ Tel. No.:
Mobile No.:

NOLI C. DISCAYA, JR. E-Mail:


Canvasser
Mobile No.: Mobile No.: 0925-7305799
Email Add.: ncdiscaya@plm.edu.ph

Gen. Luna cor. Muralla Sts., Intramuros, Manila


Telefax No. (02)8528-4592,Email add: ncdiscaya@plm.edu.ph