Discharge Plan: M.T. Gemini Sun
Discharge Plan: M.T. Gemini Sun
GEMINI SUN
DISCHARGE PLAN
PORT : Whitegate CARGO: Okubyom blend
BERTH : Berth 1 RATE: 3000 cub/he
API: 40.3 AVG TEMP: 28.0 Deg C
STAGE Initial Stage STAGE 1 STAGE 2 STAGE 3 STAGE 4
Critical Stage Normal Stage Normal Stage Normal Stage Normal Stage
TANKS ull vol ull vol ull vol ull vol ull vol
1P 3.11 7642.3 8.00 5444.5 11.00 4096.2 13.00 3197.3 16.00 1853
1S 3.12 7640.0 8.00 5446.7 11.00 4098.4 13.00 3199.5 16.00 1856
2P 3.34 9250.1 6.00 7805.8 9.00 6176.1 11.00 5099.7 14.00 3462
2S 3.32 9255.0 6.00 7799.8 9.00 6170.8 11.00 5085.0 14.00 3456
3P 3.34 9291.7 5.00 8385.9 6.00 7840.2 9.00 6203.0 10.00 5657
3S 3.33 9299.9 5.00 8388.6 6.00 7842.9 9.00 6206.0 10.00 5660
4P 3.64 9126.9 8.00 6747.7 10.00 5656.3 12.00 4565.0 15.00 2928
4S 3.38 9266.1 8.00 6744.9 10.00 5653.6 12.00 4562.0 15.00 2925
5P 3.02 9458.7 5.00 8378.2 7.00 7286.8 10.00 5650.0 13.00 4013
5S 4.06 8894.4 5.00 8381.5 7.00 7290.1 10.00 5652.0 13.00 4016
6P 2.95 9114.5 4.50 8268.6 6.00 7450.0 8.10 6304.1 8.90 5867
6S 4.18 8447.0 4.50 8272.4 6.00 7453.9 8.10 6307.9 8.90 5871
SLP 5.53 1666.0 9.00 1165.4 9.00 1165.4 9.00 1165.4 9.00 1165.4
SLS 5.56 1648.9 9.00 1167.1 9.00 1167.1 9.00 1167.1 9.00 1167.1
1)Start No.1 COP and discharge 4W's 1)Open COT'S-Slop P/S.Continue 1)Stop COT'S-Slop P/S at ullage- .Continue discharging bulk cargo .Continue discharging bulk cargo
COT Initially at slow rate.Terminal to be discharging bulk cargo from 9m.Continue discharging bulk from COT's -1W,2W,3W,4W,5W, from COT's -1W,2W,3W,4W,5W
informed commenced discharge.
Monitor the CCR readouts to confirm
COT's -1W,2W,3W,4W,5W, 6W & cargo from COT's - 6W & Slop P using No.1 , No. 2 & 6W using No.1 , No. 2 & No.3
that cargo is flowing out from the FIRST Slop W's using No.1 , No. 2 & 1W,2W,3W,4W,5W, 6W using & No.3 COP. COP.
nominated tanks 4W’s COT only. No.3 COP. No.1 , No. 2 & No.3 COP. 2)Maintain Manifold 2)Maintain Manifold
2)After getting readiness from the 2)Maintain Manifold 2)Maintain Manifold Pressure/Discharge rate as Pressure/Discharge rate as
Remarks- terminal to increase to maximum then Pressure/Discharge rate as Pressure/Discharge rate as agreed. agreed.
Cargo Start No.2 & No.3 COP.Open Cargo
agreed. agreed.
Tanks-1W,2W,3W,4W,5W,6W
HRS Normal Stage Critical Stage Critical Stage Critical Stage Critical Stage
TANKS ull vol ull vol ull vol ull vol ull vol
1P 20.82 0
1S 20.82 0
2P 20.82 0
2S 20.82 0
3P 20.82 0
3S 20.82 0
4P 20.82 0
4S 20.82 0
5P 20.82 0
5S 20.82 0
6P 20.82 0
6S 20.82 0
SLP 20.82 0
SLS 20.82 0
Final Departure
condition
Remarks-
Cargo
TOTAL 0
RATE 513
DRAFTS
FWD 6.40
AFT 7.90
TRIM 1.50
S.F. (%@FR) 48 Fr: 64
B.M.(%@FR) 77 Fr: 144
GoM 15.01
14.80
16.25
BALLAST (SOUNDING IN METRES)
FPK H 4.0 48
FPK L 11.5 2097
1P 20.6 2602
1S 20.6 2602
2P 20.6 2706
2S 20.6 2706
3P 20.6 2699
3S 20.6 2699
4P 20.5 2699
4S 20.3 2677
5P 21.0 2656
5S 21.0 2656
6P 20.6 3287
6S 17.0 3010
APK 1.5 9
TOTAL -M3 35105
RATE-M3 1150
Remarks- FINAL DEPARTURE BALLAST
Ballast CONDITION
7.32 13.3
14 18/ 22 26 28 32
16.02 2.45 18.17 20.62 20.62
16.02 2.45 18.17 20.62 20.62
14.09 3.57 17.05 1.36 19.26 20.62
14.09 3.57 17.05 1.36 19.26 20.62
12.36 6.43 14.19 4.41 16.21 1.34 19.28
12.36 6.43 14.19 4.41 16.21 1.34 19.28
15.32 2.82 17.8 20.62 20.62
15.32 2.82 17.8 20.62 20.62
13.53 4.95 15.67 2.7 17.92 20.62
13.53 4.95 15.67 2.7 17.92 20.62
12.19 6.56 14.06 4.17 16.45 1.98 18.64
12.19 6.56 14.06 4.17 16.45 1.98 18.64