Method Statement

PLUMBING/SANITARY WORKS
DISINFECTION OF WATER DISTRIBUTION SYSTEM AND WATER TANKS

KARL JARED MASANQUE JOVERT BERNABE

0 Project Engineer Operations Manager First Issue

Rev. Date Prepared Checked Description

Document Review

Name Title Signature Date

Reviewed:

Reviewed:

Reviewed:

Reviewed:

Approved:

Originator: Page No. 1


Identification Number
PACERS TRADING Project Type Number Revision
AND SERVICES
O H P W P - M S - C W 0 0 1 0

OHP-MS-01, Rev. 0
Table of Contents

1 SCOPE OF WORK ............................................................................................................................................... 3

2 REFERENCE DOCUMENTS ............................................................................................................................. 3

3 WORK METHODOLOGY .................................................................................................................................. 3

4 MAJOR TOOLS AND EQUIPMENT ................................................................................................................ 5

5 SAFETY PRECAUTIONS ................................................................................................................................... 6

6 ENVIRONMENTAL PROTECTION MEASURES.......................................................................................... 6

7 RESPONSIBILITIES ........................................................................................................................................... 6

8 CALCULATION OF 50PPM CHLORINE SOLUTION .................................................................................. 6

OFW HOSPITAL Project Type Number Rev

PLUMBING/SANITARY
WORKS
Page No. 2 of 6 O H P W P - MS - C W 0 0 1 0
1 SCOPE OF WORK
This method statement is intended for the disinfection of water distribution system and water
tanks of the OFW Hospital.

2 REFERENCE DOCUMENTS
Project Consultant Specifications
Plumbing/Sanitary Specification – IFC Plans

3 WORK METHODOLOGY

3.1 PRE-DELIVERY AND STORAGE PREPARATION


a) Prepare delivery and check site conditions as well as storage
capacity.

b) Prior to delivery of materials on-site, conduct a site survey and make


all necessary coordination with the main contractor as regards to
access of the said material to the designated location of warehouse.

c) Coordinate with the project team of the process of materials and


tools withdrawal.

3.2 INCOMING STORAGE AT SITE


a) Check specifications of material against delivery order.

b) Check any damage that may have occurred during transportation.

c) If there is any evidence of damage, an internal inspection shall be


made by Pacers’ representative together with TBDI’s representative.
A report shall be made and submitted to TBDI.

d) Make sure hazardous chemicals are stored properly and in proper


containers with label.

3.3 CLEANING OF CISTERN TANK


a) Conduct site inspection to the fabrication and working area.
Securing all necessary permits such as work permit.

b) Prepare necessary materials and tools needed for the said activity.

c) Wear proper PPE & prepare proper ventilation when working at


confined space.

d) Flush the water inside the tank.

e) Use pressure washer, brushes and rug to clean the inside of the
tank.

f) Refill and flush the tank continuously to free the tank from residual
dirt, germs, bacteria, etc.

g) Conduct inspection and approval of cleaning result with TBDI Field


Engineer

OFW HOSPITAL Project Type Number Rev

PLUMBING/SANITARY
WORKS
Page No. 3 of 6 O H P W P - MS - C W 0 0 1 0
h) Upon approval, refill the tank with water in preparation of the
Sodium Hypochlorite (NaOCl) Solution mixing.

3.4 DISINFECTION OF CISTERN TANK


a) Fill the cistern tank with water from local water distributor.

b) Add the 22 pails Sodium Hypochlorite (NaOCl) Solution to the water


until the 50-ppm concentration is achieved.

c) Leave the solution for 16-hrs inside the tank.

d) After 16-hrs, flush the solution through the drain and rinse the tank
with water again.

e) Conduct inspection and approval of disinfection result with TBDI


Field Engineer.

3.5 CLEANING OF CWL PIPING


a) Refill the Cistern Tank with water from local water distributor

b) Turn on the Transfer Pump to cleaning the piping system with water.

c) Inspect the farthest point of the pipeline and check if water has
already reached that point.

d) Continuously pump water through the pipeline until clear water is


seen.

e) Conduct inspection and approval of cleaning result with TBDI Field


Engineer.

f) Upon approval, refill the tank with water in preparation of the


Sodium Hypochlorite (NaOCl) Solution mixing.

3.6 DISINFECTION OF CWL PIPING


a) Fill the cistern tank with water.

b) Add the 22 pails of Sodium Hypochlorite (NaOCl) Solution to the


water until the 50-ppm concentration is achieved.

c) Pump the solution to fill the piping system.

d) Inspect the farthest point of the pipeline and check if the solution
has already reached that point.

e) Leave the solution within the piping system for 16-hrs.

f) During the 16-hr period, occasionally check for leakage in the piping
system.

g) After 16-hrs, flush the solution to the nearest floor drain. Rinse the
piping system with water pumped by the transfer pump.

OFW HOSPITAL Project Type Number Rev

PLUMBING/SANITARY
WORKS
Page No. 4 of 6 O H P W P - MS - C W 0 0 1 0
h) Conduct inspection and approval of disinfection result with TBDI
Field Engineer.

3.7 CLEANING OF OVERHEAD TANK


a) Flush the water inside the tank.

b) Use pressure washer, brushes and rug to clean the inside of the
tank.

c) Refill and flush the tank continuously to free the tank from residual
dirt, germs, bacteria, etc.

d) Conduct inspection and approval of cleaning result with TBDI Field


Engineer

e) Upon approval, refill the tank with water in preparation of the


Sodium Hypochlorite (NaOCl) Solution mixing.

3.8 DISINFECTION OF OVERHEAD TANK


a) Fill the cistern tank with water from local water distributor.

b) Using the transfer pump, transfer the water from the cistern tank to
the overhead tank.

c) Add the 22 pails Sodium Hypochlorite (NaOCl) Solution to the water


until the 50-ppm concentration is achieved.

d) Leave the solution for 16-hrs inside the tank.

e) After 16-hrs, flush the solution through the drain and rinse the tank
with water again.

f) Conduct inspection and approval of disinfection result with TBDI


Field Engineer.

3.9 POTABILITY TEST


a) Pump water through the transfer pump.

b) Take a 3-point water sample from the system. (1st point – Cistern
Tank; 2nd point – Middle part of piping system; 3rd point – farthest
point of piping system.)

c) Take the samples to an accredited water testing laboratory.

d) Check and review the laboratory results. If the samples passed the
laboratory test, the system is good to operate.

e) If the results failed, repeat the cleaning and disinfection procedures.

4 MAJOR TOOLS AND EQUIPMENT


Pressure Washer
Submersible Pump
Blowers
Basic Hand Tools

OFW HOSPITAL Project Type Number Rev

PLUMBING/SANITARY
WORKS
Page No. 5 of 6 O H P W P - MS - C W 0 0 1 0
5 SAFETY PRECAUTIONS
Review Chemical MSDS
Wear proper PPE
Accomplish Proper Permits
Conduct Toolbox Meeting before every activity

6 ENVIRONMENTAL PROTECTION MEASURES


Proper drainage/disposal of chemical

7 RESPONSIBILITIES
8.1 SubCon PIC – Routes the Work Request (WAP) part to different trades and ensure to
complete the signatures of the related trade. To Conducts progress work inspection and testing
at project site.

8.2 SubCon SO – To ensure that workers are equipped with complete PPE’s and with safe
working environment. To orient workers with safety precautions.

8.3 TBDI SO/SS – To ensure pre-activity requirement/orientation has been completed. To


check and Inspect safety of work as per Safety standards.

8.4 TBDI FE – Review work activity and coordinate conflict with the other trades (if any).
Ensure WAP has been routed and signed by all related trades. To Check and Inspect the quality
of work based on the approved ITP and Inspection checklist. Ensures acceptable Quality of
work.

8.5 TBDI PS – To verify the completeness and quality of work done and recommends the
approval of the work activity.

8.6 TBDI PIC – To ensure all quality control requirements are compiled and approved the
submitted Work Request (WR).

8 CALCULATION OF 50PPM CHLORINE SOLUTION

618 cu. m – Volume of Cistern Tank


7% (70,000 ppm) - Sodium Hypochlorite concentration
50ppm – required chlorine solution disinfectant
P – litres of sodium hypochlorite solution

70,000 ppm x P = 618,000 L x 50 ppm


P = (618,000 L x 50 ppm) / 70,000 ppm
P = 441.43 L

1 pail = 20L
P = 441.43 L / 20L
P = 22.07 Pails

OFW HOSPITAL Project Type Number Rev

PLUMBING/SANITARY
WORKS
Page No. 6 of 6 O H P W P - MS - C W 0 0 1 0