You are on page 1of 1

No Photo Item Name Specification Qua. Unit Un.

Price Total Price


Meeting hall

Vertical wooden cladding and partition at the meeting hall to . Structure


Material: australia framing. Cladding material: laminated mdf. Color: as per
1 MDF wood cladding work the design. Accessory: screw and fisher different size, tools, cutting machine,
screw driver and leveling machine Price includes material and workmanship,
153.66 m2 3,142 ETB 482,799.72
and transportation cost.

Gypsum board false ceiling At the meeting hall. Material 244*122 cm paper
laminated gypsum board material. Structure 4*5cm australia fraiming. Finish
2 Gypsum Board ceiling material gypsum plastering and paint. Price includes all accessories and 158.85 m2 2,850 ETB 452,722.50
transportation cost

Raised front stage at the meeting hall material 60*40mm RHS structure
3 Stage material. 2.5*30cm treated australia riser, thread and landing (stage top 59.76 m2 1,794 ETB 107,209.44
flooring). Price includes all accessories and transportation cost

movable custome made conference stage counter desk. Made of packed mdf
4 Counter Desk wood material with back shelf and drawers and accessories for electric
system and sound system
2.925 m2 22,500 ETB 65,812.50

Terrace
10mm thick tempered glass partition framed with 2cm thick aluminium u
1 Tempered glass partition channel and silcon filler 211.146 m2 5,036 ETB 1,063,357.56
2 RHS post 40*40 RHS structural post on the terrace out door 19.5 ml 1,980 ETB 38,610.00
40*30mm painted steel structure outdoor terrace roofing decoration with
3 Steel structure terrace roo 40*40cm random meshing and vine plantation 116.144 m2 2,560 ETB 297,328.64

4 wood partition Painted and treated 7*5 australia wood partion on the terrace 6.21 m2 3,445 ETB 21,393.45
Gypsum board false ceiling At the terracel. Material 244*122 cm paper
laminated gypsum board material. Structure 4*5cm australia fraiming. Finish
5 Gypsum Board ceiling material gypsum plastering and paint. Price includes all accessories and 194.37 m2 2,850 ETB 553,954.50
transportation cost

wooden strand false ceiling At the terrace. Material 7*2.5 cm australia and
6 Wood ceiling paint. Price includes all accessories and transportation cost 18.63 m2 3,120 ETB 58,125.60
Roof maintenance work at terrace find the damaged covering and truss system
7 Roof maintenance work and maintain accordingly 1 l.s 75,000 ETB 75,000.00

WOOD WORK

custom made 18Mmm thick laminated mdf kitchen cabinet inclduing


Modern Kitchen
1
bottom cabinet
marble toping, including doors and drawers, and marble toping. price 10 m² 13,250 ETB 132,500.00
includes material and workmanship cost

Modern Kitchen uper custom made wooden kitchen cabinet inclduing boiler, sacker
2
cabinet
fixing,doors and drawers.price includes material and workmanship 6.5 m² 12,150 ETB 78,975.00
cost

Painting and related works

Plastering / Chalk Apply gypsum plastering to partition wall and ceiling surface. price includes
1
work material and workmanship cost 353 m2 155 ETB 54,749.10
Purchase and install wall to wall fabric type carpet with mastish joiner and
2 Carpet flooring alumunium edge 285 m2 1,050 ETB 299,250.00
Apply three coats of plastic emulsion paint to plastered wall and gypsum
3 Painting work board ceiling and partition wal surfaces. 353 m2 210 ETB 74,176.20
Customes

Custome made rectangulare built in highland table


Rectangular built in
1 and plantation pot structure material brick finshed 54 m2 2,250 ETB 121,500.00
highland table
massonry wall
Supply and fix 10cm high spc tile skirting to wall
2 Counters
with necessary accesseries. 9.9 m2 4,150 ETB 41,085.00

LIGHTING AND ELECTRIC INSTALLATION


supply and fix 2.5mm2 electric wiring
Electical
1 installation price includes wiring, conduting and 500 ml 290 ETB 145,000.00
installation
boxing
2 Spot light 5Watt Supply and install 7 watt spot light 75 Pcs 550 ETB 41,250.00
supply and fix circular hanging light on the terrace price includes
3 suspended ight material and technician
28 pcs 5,400 ETB 151,200.00
4 strip light supply and fix triple strip light price includes material and technician 300 ml 250 ETB 75,000.00
switch and power supply and install switch and socket system for the newly introduced
5
socket lightings and fixtures
50 pcs 485 ETB 24,250.00
6 AC system supply and install Ac system for the terrace 16 pcs 2,550 ETB 40,800.00

Note: 1. the price validity is only for five days, if the client comes after this days the price will G.total before VAT ETB 4,496,049.21
be adjusted accordingly 2.
since this project is turn key the customer has the right to add or remove service from the list
VAT ETB 674,407.38

PLEASE CAREFULLY READ ALL THE DESCRIPTIONS G.total After VAT ETB 5,170,456.59

You might also like