Professional Documents
Culture Documents
Gypsum board false ceiling At the meeting hall. Material 244*122 cm paper
laminated gypsum board material. Structure 4*5cm australia fraiming. Finish
2 Gypsum Board ceiling material gypsum plastering and paint. Price includes all accessories and 158.85 m2 2,850 ETB 452,722.50
transportation cost
Raised front stage at the meeting hall material 60*40mm RHS structure
3 Stage material. 2.5*30cm treated australia riser, thread and landing (stage top 59.76 m2 1,794 ETB 107,209.44
flooring). Price includes all accessories and transportation cost
movable custome made conference stage counter desk. Made of packed mdf
4 Counter Desk wood material with back shelf and drawers and accessories for electric
system and sound system
2.925 m2 22,500 ETB 65,812.50
Terrace
10mm thick tempered glass partition framed with 2cm thick aluminium u
1 Tempered glass partition channel and silcon filler 211.146 m2 5,036 ETB 1,063,357.56
2 RHS post 40*40 RHS structural post on the terrace out door 19.5 ml 1,980 ETB 38,610.00
40*30mm painted steel structure outdoor terrace roofing decoration with
3 Steel structure terrace roo 40*40cm random meshing and vine plantation 116.144 m2 2,560 ETB 297,328.64
4 wood partition Painted and treated 7*5 australia wood partion on the terrace 6.21 m2 3,445 ETB 21,393.45
Gypsum board false ceiling At the terracel. Material 244*122 cm paper
laminated gypsum board material. Structure 4*5cm australia fraiming. Finish
5 Gypsum Board ceiling material gypsum plastering and paint. Price includes all accessories and 194.37 m2 2,850 ETB 553,954.50
transportation cost
wooden strand false ceiling At the terrace. Material 7*2.5 cm australia and
6 Wood ceiling paint. Price includes all accessories and transportation cost 18.63 m2 3,120 ETB 58,125.60
Roof maintenance work at terrace find the damaged covering and truss system
7 Roof maintenance work and maintain accordingly 1 l.s 75,000 ETB 75,000.00
WOOD WORK
Modern Kitchen uper custom made wooden kitchen cabinet inclduing boiler, sacker
2
cabinet
fixing,doors and drawers.price includes material and workmanship 6.5 m² 12,150 ETB 78,975.00
cost
Plastering / Chalk Apply gypsum plastering to partition wall and ceiling surface. price includes
1
work material and workmanship cost 353 m2 155 ETB 54,749.10
Purchase and install wall to wall fabric type carpet with mastish joiner and
2 Carpet flooring alumunium edge 285 m2 1,050 ETB 299,250.00
Apply three coats of plastic emulsion paint to plastered wall and gypsum
3 Painting work board ceiling and partition wal surfaces. 353 m2 210 ETB 74,176.20
Customes
Note: 1. the price validity is only for five days, if the client comes after this days the price will G.total before VAT ETB 4,496,049.21
be adjusted accordingly 2.
since this project is turn key the customer has the right to add or remove service from the list
VAT ETB 674,407.38
PLEASE CAREFULLY READ ALL THE DESCRIPTIONS G.total After VAT ETB 5,170,456.59