1. The document provides a status update on pile caps and girders for 7 structures as of 16-Apr-23.
2. It shows that 60 of the 75 required pile caps are complete, leaving 15 remaining.
3. For girders, 56 of the 208 required are complete, with 152 still outstanding.
Original Description:
Original Title
Status of Pile Caps & Girders as on 16.04.2023
1. The document provides a status update on pile caps and girders for 7 structures as of 16-Apr-23.
2. It shows that 60 of the 75 required pile caps are complete, leaving 15 remaining.
3. For girders, 56 of the 208 required are complete, with 152 still outstanding.
1. The document provides a status update on pile caps and girders for 7 structures as of 16-Apr-23.
2. It shows that 60 of the 75 required pile caps are complete, leaving 15 remaining.
3. For girders, 56 of the 208 required are complete, with 152 still outstanding.
Pile Caps - Scope Pile Caps - Status Girders - Scope Girders - Status Remarks Service/ Upto Total As 1.90m 1.70m 1.40m 1.20m Upto Total As S.No Chainage Type of Structure MCW Total Today Total Today Balance Slip Road Today on Date (PSC) (PSC) (PSC) (RCC) Today on Date 1 4+285 Major Bridge 14 7 21 21 21 66 66 33 33 33