Lesson 1

SCAAG CONSTRUCTIONS

BILL OF QUANTITIES

Project No: 96002


Project Name: PARRAMATTA
Date: 8/7/2013

Total Floor Area: 440


Builders Margin: 0.1

COST CODE DESCRIPTION UNIT QTY RATE


PRELIMINARIES
101 FOREMAN WK 28 1200
102 LABOUR WK 20 600
103 PHONE(MOBILE) WK 28 40
104 LUNCH SHED WK 24 60
105 CONTAINER WK 24 40
106 TOILET WK 24 30
107 CONNECT TEMP SERVICES ITEM 1 450
108 SURVEYOR ITEM 1 400
109 WASTE BINS NO 7 250
110 TOOL HIRE ITEM 1 1000
111 INSURANCE ITEM 1 800
112 DEMOLITION ITEM 1 7000
113 FINAL CLEAN ITEM 1 2095
100 TOTAL PRELIMINARIES TO SUMMARY
GROUNDWORK
201 STRIP SOIL M2 700 4
202 DETAIL EXCAVATION M3 40 40
200 TOTAL GROUNDWORKS TO SUMMARY
CONCRETOR
301 S&F TRENCH MESH TO FOOTINGS ITEM 1 1750
302 CONCRETE SUPPLY TO FOOTINGS M3 35 115
303 CONCRETE PLACEMENT &FINISHING ITEM 1 600
304 CONCRETE BOOM PUMP TO FOOTINGS ITEM 1 900
305 S&F GROUND SLABS TO GARAGES M2 100 48
306 S&F FORMWORK, REO, CONCRETE TO M3 66 480
ALL SUSPENDED SLABS/STAIRS
307 CONCRETE BOOM PUMP TO ABOVE ITEM 1 1800
308 S&F CONCRETE TO DRIVEWAY/PATHS M2 55 210
309 CONCRETE KERBS M 40 20
300 TOTAL CONCRETOR TO SUMMARY
BRICKWORK
401 COMMONS THOU 39 270
402 FACE THOU 18 350
403 BRICLAYING THOU 57 600
404 MORTAR THOU 57 120
405 SUNDRIES ITEM 1 3500
406 BRICK CLEANING M2 360 2.5
407 SCAFFOLDING ITEM 1 12000
408 HOIST WK 18 200

Page 1
Lesson 1

400 TOTAL BRICKWORK TO SUMMARY


CARPENTRY
501 ROOF/CEILING FRAMING @ 450 CTS M2 270 62
502 4.5MM FC LINING TOO EAVES M2 70 14
503 FIBRO JOINTS ITEM 1 80
504 S&F DOORS,2040*820 35MM HOLLOW NO 16 100
505 DITTO, 2040*720 NO 12 100
506 DITTO, 2040*820,40MM,1HR FIRE RATING NO 4 220
507 DITTO,2040*820,EXT DOOR,SOLID 40MM NO 1 160
508 DITTO, SOLID ENTRY DOOR 2040*920 NO 1 1200
WITH SIDE PANEL FIXED TO TIMBER
DOOR JAMB
500 TOTAL CARPENTRY TO SUMMARY
JOINERY
601 KITCHENS(PC ALLOWANCE) NO/UNITS 4 2500
602 WARDROBES(PC ALLOWANCE) NO/UNITS 4 600
603 SHELVING TO LINEN CUPBOARDS ITEM 1 10000
600 TOTAL JOINERY TO SUMMARY
WINDOWS
701 POWDERCOAT ALUMINIUM WINDOWS NO/UNITS 4 1500
(SLIDING) AND SLIDING DOORS
700 TOTAL WINDOWS TO SUMMARY
GARAGE DOORS
801 2100*2100 ALUMINIUM POWDERCOAT NO 4 900
TILT A DOOR
800 TOTAL GARAGE DOORS TO SUMMARY
HARDWARE
901 DOMESTIC HARDWARE TO ALL DOORS ITEM 1 1200
900 TOTAL HARDWARE TO SUMMARY
ROOFING
1001 S&F CONCRETE ROOF TILES INCLUDING M2 283 28
SARKING
1002 RIDGE AND HIP TILES M 38 6
1000 TOTAL ROOFING TO SUMMARY
PLASTERING
1201 13MM PLASTERBOARD TO CEILINGS M2 200 32
WITH 1HR FIRE RATING
1202 90MM COVED CORNICE M 444 5
1203 12MM CEMENT RENDER TO WALLS & M2 995 9
SOFFITS OF BALCONIES
1204 WHITE SETTING TO SOFFITS OF SLABS M2 172 9
1200 TOTAL PLASTERING TO SUMMARY
TILING
1301 100*100 FLR TILES IN MORTAR BED M2 78 70
1302 200*200TERRACOTTA TILES TO M2 32 70
BALCONIES ON MORTAR BED
1303 200*200 WALL TILES FIXED WITH M2 88 70
CEMENT BASED ADHESIVE
1304 200*200 SKIRTING TILE M 16 8
1305 200*100 SKIRTING TILE M 24 8
1306 TILING TO STAIRS (LABOUR) NO/STEP 34 40
1307 TILE TO BALCONY EDGE M 28 14

Page 2
Lesson 1

1308 CERAMIC SOAP HOLDER NO 16 12


1309 CERAMIC TOILET PAPER HOLDER NO 4 12
1310 BRICKWORK TO BATHS AND HOBS ITEM 2 32
1311 WATERPROOFING M2 112 55
1312 TILE ACCESSORIES ITEM 1 500
1300 TOTAL TILING TO SUMMARY
FLOOR FINISHES
1401 CARPET M 88 90
1402 VINYL TO FLOORS M2 48 42
1403 COVED VINYL SKIRTING M 36 6
1400 TOTAL FLOOR FINISHES TO SUMMARY
GLAZING
1501 SHOWER SCREENS,LAMINATED GLASS NO 4 300
1502 MIRRORS NO 4 60
1500 TOTAL GLAZING TO SUMMARY
PAINTING
1601 INTERNAL AND EXTERNAL PAINTING NO/UNITS 4 2000
WHERE REQUIRED
1600 TOTAL PAINTING TO SUMMARY
PLUMBER/DRAINER
1701 PROVISIONAL SUM PER UNIT, INCLUDES NO/UNITS 4 4500
ROOF PLUMBING
1702 STORMWATER DETENTION TANKS & PITS ITEM 1 6000
1700 TOTAL PLUMBING TO SUMMARY
ELECTRICAL
1801 PROVISIONAL SUM PER UNIT, INCLUDES NO/UNITS 4 4200
LIGHTS & VIDEO INTERCOM
1800 TOTAL ELECTRICAL TO SUMMARY
PC ITEMS
1901 900MM VANITIES NO 4 350
1902 CAROMA BOWL INCLU PLUG & WASTE NO 4 180
1903 COMPLETE WC-CAROMA NO 4 300
1904 SS LAUNDRY TUB UNIT NO 4 200
1905 SS KITCHEN SINK -1.5 BOWLS NO 4 300
1906 BATH TUBS NO 4 150
1907 KITCHEN TAP - MIXER NO 4 120
1908 VANITY TAP SET NO 4 90
1909 BATH SET NO 4 90
1910 SHOWER SET NO 4 90
1911 LAUNDRY TUB SET NO 4 45
1912 WASHING MACHINE SET NO 4 30
1913 ELECTRIC OVEN UNDER BENCH NO 4 750
1914 ELECTRIC COOKTOP, 4 ELEMENTS 600MM NO 4 350
1915 ELECTRIC RANGEHOOD 600MM NO 4 120
1916 ELECTRIC HOT WATER SYSTEM NO 4 250
1900 TOTAL PC ITEMS TO SUMMARY
MISCELLANEOUS
2001 SIGNAGE ITEM 1 500
2002 LETTER BOXES ITEM 1 200
2003 CLOTHES LINE ITEM 1 800
2004 LANDSCAPING-COMPLETE ITEM 1 10000
2005 FENCING-TIMBER 1800 HIGH M 90 33

Page 3
Lesson 1

2000 TOTAL MISCELLANEOUS TO SUMMARY


METAL WORK
2101 ALUMINIUM POWDERCOAT BALUSTRADES M 36 180
2102 PRIMED 1HR FIRE RATED DOOR JAMBS NO 4 80
1.6MM THICK, SINGLE REBATE
2103 STANDARD NON RATED FRAMES NO 25 40
2100 TOTAL METALWORK TO SUMMARY

Page 4
Lesson 1

TOTAL

Page 5
Answer 1

SCAAG CONSTRUCTIONS

BILL OF QUANTITIES

Project No: 96002


Project Name: PARRAMATTA
Date: 8/7/2013

Total Floor Area: 440


Builders Margin: 10%

COST
CODE DESCRIPTION UNIT QTY RATE
PRELIMINARIES
101 FOREMAN WK 28 $1,200.00
102 LABOUR WK 20 $600.00
103 PHONE(MOBILE) WK 28 $40.00
104 LUNCH SHED WK 24 $60.00
105 CONTAINER WK 24 $40.00
106 TOILET WK 24 $30.00
107 CONNECT TEMP SERVICES ITEM 1 $450.00
108 SURVEYOR ITEM 1 $400.00
109 WASTE BINS NO 7 $250.00
110 TOOL HIRE ITEM 1 $1,000.00
111 INSURANCE ITEM 1 $800.00
112 DEMOLITION ITEM 1 $7,000.00
113 FINAL CLEAN ITEM 1 $2,095.00
100 TOTAL PRELIMINARIES TO SUMMARY
GROUNDWORK
201 STRIP SOIL M2 700 $4.00
202 DETAIL EXCAVATION M3 40 $40.00
200 TOTAL GROUNDWORKS TO SUMMARY
CONCRETOR
301 S&F TRENCH MESH TO FOOTINGS ITEM 1 $1,750.00
302 CONCRETE SUPPLY TO FOOTINGS M3 35 $115.00
303 CONCRETE PLACEMENT &FINISHING ITEM 1 $600.00
304 CONCRETE BOOM PUMP TO FOOTINGS ITEM 1 $900.00
305 S&F GROUND SLABS TO GARAGES M2 100 $48.00
306 S&F FORMWORK, REO, CONCRETE TO ALL M3 66 $480.00
SUSPENDED SLABS/STAIRS
307 CONCRETE BOOM PUMP TO ABOVE ITEM 1 $1,800.00
308 S&F CONCRETE TO DRIVEWAY/PATHS M2 55 $210.00
309 CONCRETE KERBS M 40 $20.00
300 TOTAL CONCRETOR TO SUMMARY
BRICKWORK
401 COMMONS THOU 39 $270.00
402 FACE THOU 18 $350.00
403 BRICLAYING THOU 57 $600.00
404 MORTAR THOU 57 $120.00
405 SUNDRIES ITEM 1 $3,500.00
406 BRICK CLEANING M2 360 $2.50
407 SCAFFOLDING ITEM 1 $12,000.00

Page 6
Answer 1

SCAAG CONSTRUCTIONS

BILL OF QUANTITIES

Project No: 96002


Project Name: PARRAMATTA
Date: 8/7/2013

Total Floor Area: 440


Builders Margin: 10%

COST
CODE DESCRIPTION UNIT QTY RATE
408 HOIST WK 18 $200.00
400 TOTAL BRICKWORK TO SUMMARY

Page 7
Answer 1

SCAAG CONSTRUCTIONS

BILL OF QUANTITIES

Project No: 96002


Project Name: PARRAMATTA
Date: 8/7/2013

Total Floor Area: 440


Builders Margin: 10%

COST
CODE DESCRIPTION UNIT QTY RATE
CARPENTRY
501 ROOF/CEILING FRAMING @ 450 CTS M2 270 $62.00
502 4.5MM FC LINING TOO EAVES M2 70 $14.00
503 FIBRO JOINTS ITEM 1 $80.00
504 S&F DOORS,2040*820 35MM HOLLOW NO 16 $100.00
505 DITTO, 2040*720 NO 12 $100.00
506 DITTO, 2040*820,40MM,1HR FIRE RATING NO 4 $220.00
507 DITTO,2040*820,EXT DOOR,SOLID 40MM NO 1 $160.00
508 DITTO, SOLID ENTRY DOOR 2040*920 WITH NO 1 $1,200.00
SIDE PANEL FIXED TO TIMBER DOOR JAMB
500 TOTAL CARPENTRY TO SUMMARY
JOINERY
601 KITCHENS(PC ALLOWANCE) NO/UNITS 4 $2,500.00
602 WARDROBES(PC ALLOWANCE) NO/UNITS 4 $600.00
603 SHELVING TO LINEN CUPBOARDS ITEM 1 $10,000.00
600 TOTAL JOINERY TO SUMMARY
WINDOWS
701 POWDERCOAT ALUMINIUM WINDOWS NO/UNITS 4 $1,500.00
(SLIDING) AND SLIDING DOORS
700 TOTAL WINDOWS TO SUMMARY
GARAGE DOORS
801 2100*2100 ALUMINIUM POWDERCOAT TILT A NO 4 $900.00
DOOR
800 TOTAL GARAGE DOORS TO SUMMARY
HARDWARE
901 DOMESTIC HARDWARE TO ALL DOORS ITEM 1 $1,200.00
900 TOTAL HARDWARE TO SUMMARY
ROOFING
1001 S&F CONCRETE ROOF TILES INCLUDING M2 283 $28.00
SARKING
1002 RIDGE AND HIP TILES M 38 $6.00
1000 TOTAL ROOFING TO SUMMARY
PLASTERING
1201 13MM PLASTERBOARD TO CEILINGS WITH M2 200 $32.00
1HR FIRE RATING
1202 90MM COVED CORNICE M 444 $5.00
1203 12MM CEMENT RENDER TO WALLS & M2 995 $9.00
SOFFITS OF BALCONIES

Page 8
Answer 1

SCAAG CONSTRUCTIONS

BILL OF QUANTITIES

Project No: 96002


Project Name: PARRAMATTA
Date: 8/7/2013

Total Floor Area: 440


Builders Margin: 10%

COST
CODE DESCRIPTION UNIT QTY RATE
1204 WHITE SETTING TO SOFFITS OF SLABS M2 172 $9.00
1200 TOTAL PLASTERING TO SUMMARY

Page 9
Answer 1

SCAAG CONSTRUCTIONS

BILL OF QUANTITIES

Project No: 96002


Project Name: PARRAMATTA
Date: 8/7/2013

Total Floor Area: 440


Builders Margin: 10%

COST
CODE DESCRIPTION UNIT QTY RATE
TILING
1301 100*100 FLR TILES IN MORTAR BED M2 78 $70.00
1302 200*200TERRACOTTA TILES TO BALCONIES M2 32 $70.00
ON MORTAR BED
1303 200*200 WALL TILES FIXED WITH CEMENT M2 88 $70.00
BASED ADHESIVE
1304 200*200 SKIRTING TILE M 16 $8.00
1305 200*100 SKIRTING TILE M 24 $8.00
1306 TILING TO STAIRS (LABOUR) NO/STEP 34 $40.00
1307 TILE TO BALCONY EDGE M 28 $14.00
1308 CERAMIC SOAP HOLDER NO 16 $12.00
1309 CERAMIC TOILET PAPER HOLDER NO 4 $12.00
1310 BRICKWORK TO BATHS AND HOBS ITEM 2 $32.00
1311 WATERPROOFING M2 112 $55.00
1312 TILE ACCESSORIES ITEM 1 $500.00
1300 TOTAL TILING TO SUMMARY
FLOOR FINISHES
1401 CARPET M 88 $90.00
1402 VINYL TO FLOORS M2 48 $42.00
1403 COVED VINYL SKIRTING M 36 $6.00
1400 TOTAL FLOOR FINISHES TO SUMMARY
GLAZING
1501 SHOWER SCREENS,LAMINATED GLASS NO 4 $300.00
1502 MIRRORS NO 4 $60.00
1500 TOTAL GLAZING TO SUMMARY
PAINTING
1601 INTERNAL AND EXTERNAL PAINTING WHERE NO/UNITS 4 $2,000.00
REQUIRED
1600 TOTAL PAINTING TO SUMMARY
PLUMBER/DRAINER
1701 PROVISIONAL SUM PER UNIT,INCLUDES NO/UNITS 4 $4,500.00
ROOF PLUMBING
1702 STORMWATER DETENTION TANKS & PITS ITEM 1 $6,000.00
1700 TOTAL PLUMBING TO SUMMARY
ELECTRICAL
1801 PROVISIONAL SUM PER UNIT,INCLUDES NO/UNITS 4 $4,200.00
LIGHTS & VIDEO INTERCOM
1800 TOTAL ELECTRICAL TO SUMMARY

Page 10
Answer 1

SCAAG CONSTRUCTIONS

BILL OF QUANTITIES

Project No: 96002


Project Name: PARRAMATTA
Date: 8/7/2013

Total Floor Area: 440


Builders Margin: 10%

COST
CODE DESCRIPTION UNIT QTY RATE
PC ITEMS
1901 900MM VANITIES NO 4 $350.00
1902 CAROMA BOWL INCLU PLUG & WASTE NO 4 $180.00
1903 COMPLETE WC-CAROMA NO 4 $300.00
1904 SS LAUNDRY TUB UNIT NO 4 $200.00
1905 SS KITCHEN SINK -1.5 BOWLS NO 4 $300.00
1906 BATH TUBS NO 4 $150.00
1907 KITCHEN TAP - MIXER NO 4 $120.00
1908 VANITY TAP SET NO 4 $90.00
1909 BATH SET NO 4 $90.00
1910 SHOWER SET NO 4 $90.00
1911 LAUNDRY TUB SET NO 4 $45.00
1912 WASHING MACHINE SET NO 4 $30.00
1913 ELECTRIC OVEN UNDER BENCH NO 4 $750.00
1914 ELECTRIC COOKTOP, 4 ELEMENTS 600MM NO 4 $350.00
1915 ELECTRIC RANGEHOOD 600MM NO 4 $120.00
1916 ELECTRIC HOT WATER SYSTEM NO 4 $250.00
1900 TOTAL PC ITEMS TO SUMMARY
MISCELLANEOUS
2001 SIGNAGE ITEM 1 $500.00
2002 LETTER BOXES ITEM 1 $200.00
2003 CLOTHES LINE ITEM 1 $800.00
2004 LANDSCAPING-COMPLETE ITEM 1 $10,000.00
2005 FENCING-TIMBER 1800 HIGH M 90 $33.00
2000 TOTAL MISCELLANEOUS TO SUMMARY
METAL WORK
2101 ALUMINIUM POWDERCOAT BALUSTRADES M 36 $180.00
2102 PRIMED 1HR FIRE RATED DOOR JAMBS NO 4 $80.00
1.6MM THICK, SINGLE REBATE
2103 STANDARD NON RATED FRAMES NO 25 $40.00
2100 TOTAL METALWORK TO SUMMARY

Page 11
Answer 1

TOTAL

$33,600.00
$12,000.00
$1,120.00
$1,440.00
$960.00
$720.00
$450.00
$400.00
$1,750.00
$1,000.00
$800.00
$7,000.00
$2,095.00
$63,335.00

$2,800.00
$1,600.00
$4,400.00

$1,750.00
$4,025.00
$600.00
$900.00
$4,800.00
$31,680.00

$1,800.00
$11,550.00
$800.00
$57,905.00

$10,530.00
$6,300.00
$34,200.00
$6,840.00
$3,500.00
$900.00
$12,000.00

Page 12
Answer 1

TOTAL
$3,600.00
$77,870.00

Page 13
Answer 1

TOTAL

$16,740.00
$980.00
$80.00
$1,600.00
$1,200.00
$880.00
$160.00
$1,200.00

$22,840.00

$10,000.00
$2,400.00
$10,000.00
$22,400.00

$6,000.00

$6,000.00

$3,600.00

$3,600.00

$1,200.00
$1,200.00

$7,924.00

$228.00
$8,152.00

$6,400.00

$2,220.00
$8,955.00

Page 14
Answer 1

TOTAL
$1,548.00
$19,123.00

Page 15
Answer 1

TOTAL

$5,460.00
$2,240.00

$6,160.00

$128.00
$192.00
$1,360.00
$392.00
$192.00
$48.00
$64.00
$6,160.00
$500.00
$22,896.00

$7,920.00
$2,016.00
$216.00
$10,152.00

$1,200.00
$240.00
$1,440.00

$8,000.00

$8,000.00

$18,000.00

$6,000.00
$24,000.00

$16,800.00

$16,800.00

Page 16
Answer 1

TOTAL

$1,400.00
$720.00
$1,200.00
$800.00
$1,200.00
$600.00
$480.00
$360.00
$360.00
$360.00
$180.00
$120.00
$3,000.00
$1,400.00
$480.00
$1,000.00
$13,660.00

$500.00
$200.00
$800.00
$10,000.00
$2,970.00
$14,470.00

$6,480.00
$320.00

$1,000.00
$7,800.00