Professional Documents
Culture Documents
xls
Government of Nepal
Ministry of Culture, Tourism & Civil Aviation
Department of Archaeology
Rates of Traditional Materials
Notes:-
1 The rates for other Districts (outside Kathmandu Valley)
should be increased by 75 percent except group 'ka' and 'kha'
rural area
2 The rates for India should be increased by 100 percent
3 The rates for Craftesman of out side valley should be
increased by the same proportion as the rates of Craftesman of
Kathmandu Valley to the rates fixed by Distict Office.
Rates of Labours
Project:- Inside Kathmandu Valley
Fiscal Year:- 2078/079 2075/076 2075/076
___________________________________________________
S.No. Description of Labours Rate pe day
________________
__________________________________________________ __________
1 Head Labour 0 0 0
2 Labour 790 700 700
3 Mason,Carpenter,Painter,---Trained 1125 960 960
4 Mason,Carpenter,Painter---Untrained 0 0 0
5 Mason,Carpenter,Painter etc.---Trained 1125 960 960
6 Mason,Carpenter,Painter etc.----Untrained 0 0 0
7 Sawing man 0 0 0
Page 1
660230821.xls
Government of Nepal
Ministry of Culture, Tourism & Civil Aviation
Department of Archaeology
Rates of Traditional Materials
Project:- Inside Kathmandu Valley
Fiscal 2078/079
___________________________________________________ Rate per unit.
S.No. Description of Traditional Materials
Transpo Transpo
________________
_________________________________________________ without 3.5%Tra. rtation rtation
1 Dachi Appa (Traditional Brick) large-(8-1/2"*2-3/8"*5) 0
2 Dachi Appa (Traditional Brick) small-(8-3/8"*2-1/8"*4-1/4") 29 1 1
3 Kun Appa (Dachi Appa)-Corner Brick(large) 0
4 Kun Appa (Dachi Appa)-Corner Brick(small) 40 1 1
5 Ma Appa (Traditional Local Brick)-large(8-7/8"*2-1/4"*5-3/4" 0
6 Ma Appa (Traditional Local Brick)-small (8-3/4"*2"*5") 22 1 1
7 Dhuri Chang (Ridge tile)-large-(9-7/8"*5-1/2") 84 1 1
8 Dhuri Chang small 25 1 1
9 Jhingati (Roof tile) new-(8-3/4"*4") 11.25 0.25 0.25
10 Jhingati (roof tile) old 8 1 1
11 Du Kun (Valley tile) 84 1 1
12 Kopu(Tile used under Dhuri Chang) large 84 1 1
13 Kopu(Tile used under Dhuri Chang) small 23 1 1
14 Gongacha Appa (Corner Bird) 276 1 1
15 Stone for Peti (10" X 4" ) per m 3280
16 Nagol Brick 31 1 1
17 Roofing Clay --per m3 318.6
18 Yellow Mud (clay) for Brick work-per m3 1000
19 Gold per tola 0
20 Mercury per gram (11.66) 3498
21 Carnesh Brick over wooden carnesh 33 1 1
22 Carnesh Brick over window 33 1 1
23 Tractor fare for disposing waste material 0
24 Wind Bell 4" 476
25 Lhakayan (set ) 5500
26 Corner Nhayakan Stone (10".*10".*14".) 1900
27 20 gauge Brass sheet (@7.9 kg. per m2)--per kg. 1127
Page 2
660230821.xls
Page 3
660230821.xls
Page 4
660230821.xls
Page 5
660230821.xls
Page 6
660230821.xls
2075/076
Rate pe day
__________
2076/077 2076/077
1430 1430 1300
1350 1350 1230
1235 1235 1125
1150 1150 1050
1590 1590 1450
1330 1330 1210
5% 5% 10%
0 0 0
750 750 750
1030 1030 1030
0 0 0
1030 1030 1030
0 0 0
0 0 0
7 % up 7 % up no change
Page 7
660230821.xls
2078-79 2075-76
0 0
28 25
39 35
21 19
83 75
24 22
11 10
7 7
83 75
83 75
22 22
275 250
1000 900
30 27
318.6 318.6
1000 1000
68669.58 56902.82
300 300
32 32
32 32
0 0
476 476
5500 5000
1900 1900
1127 1025
Page 8
660230821.xls
1485 1350
27 27
22 22
0 0
1400 1400
950 950
27 27
70 70
132 132
204827.00 247205
197764.00 197764
0 0
1000 900
0 0
0 0
805 851
88 88
88 88
0 0
1550 1550
0 0
24 22
35 35
63 63
63 63
14.54 14.54
6250 7500
23 23
14 14
14.54 14.54
60 60
112 112
210 210
13.2 13.2
2500 2500
318.6 318.6
2355 2355
109.52 109.52
18 18
63 65
94 94
Page 9
660230821.xls
88 88
89 89
0 0
1788 1788
1788 1788
29 29
137 137
3 3
103 103
88 88
76 76
0 0
23 23
121 121
0 0
Page 10
660230821.xls
31 31
88 88
35 35
41.04 41.04
0 0
30 27
30 27
2100 2000
3200 3000
9000 8500
1000 1000
1400 3700
10000 25000
Page 11
660230821.xls
3500 40000
70000 70000
105000 105000
240000 240000
5200 5200
Page 12