Professional Documents
Culture Documents
COLOUR COMBINATION
SIZE
LABEL
PURE
1 WHITE LA210194 COO AVERY RED
GREY
MAIN
LABEL
2 ML880255 AVERY RED
PURE
WHITE
GREY
FTY
YC
3 GUES RM-210997 LABELTEX SYBK-BLACK
LOGO
OLATE
CARE
LABEL
SLIT
4 EDGE CL 90016 AVERY BLACK
SATIN
CARE
LABEL
SLIT
4 EDGE CL 90016 AVERY BLACK
SATIN
BLACK
W/QR
Zipper
(COIL
CLOSE
D W/
DA
PULLE
5 RZP210 ZI210532 NO3 TALON BLACK
120
SEMI
AUTOL
OCK
GUESS
PULL)
FTY
NEW
6 SIZE JO210127 AVERY RED
JOKER
S
LION
7 32L BU211002 Jet Black A996 (JBLK)
BUTTON
LION
8 24L BU211002 Jet Black A996 (JBLK)
BUTTON
Hook
9 NO 29 BTSX GUN-GUNMETAL
and Bar
barcode
10 ST 338 Trung Dũng WHITE
sticker
FABRI
C 85%
POLYE
11 STER DTR 160W YIPHI Jet Black A996 (JBLK)
15%
RAYO
N
LININ
12 210T LESEN JET BLACK
G
FUSIN
G FOR
14 BS730 5S Charcoal
SMALL
PART
BAROL FACTORY
15 CS950 BLACK
L SOURCE
CARTO HOÀNG
16
N LONG
Coats Phong
17 Thread 20 42MMT
Phú
Coats Phong
18 Thread 60/2 C9600
Phú
Coats Phong
19 Thread EPIC 42MMT
Phú
Coats Phong
20 Thread 20 C9600
Phú
Coats Phong
21 Thread 7 C9600
Phú
Hướng xử lí
Đầu tiên ta xác định nguyên nhân gây ra hàng bị trả về ,hàng bị lỗi để tìm ra giải pháp phù hợp :
Sẽ có 2 trường hợp xảy ra:
TH1:Do khách hàng hay nhà cung cấp NPL không ,do đủ trong
lúc vận
quáchuyển
trình sản
gặpxuất
sự cố
lôgây
hàng
ragây
hàng
rabị hỏn
TH2:Do lỗi từ phíachủdoanh
quannghiệp
không công
chú tâm
ty mình
vào công việc gây ra tình trạng Hàng lỗi ,thiếu
Sau khi xác định nguyên nhân ,ta sẽ có những giải pháp phù hợp sau:
giải pháp 1:Đầu tiên ,ta cần cân đối xem số lượng NPL bị thiếu hay lỗi là bao nhiêu .Sau khi xác đị
Đàm phán với khác hàng ,yêu cầu họ gửi thêm số lượng để bù vào hàng bị lỗi để sản xuất cho kịp ti
Giải pháp 2:Nếu do lỗi công ty,đầu tiên cũng cần phải cân đối số lượng NPL bị thiếu hay lỗi ,sau đ
Từ đó ,tất cả đều phải chủ động kiểm tra kỹ lưỡng để tránh mắc sai lầm lần sau,cần đưa ra lời cam k
Nhưng có một vấn đề nữa mà bạn cần lưu ý, đó là hàng bị trả lại sẽ xử lý như thế nào, vấn đề sổ sác
BALANCE SHEET OF MATERIAL
R COMBINATION
MARMONT
POSITION / REMARKS SIZE UNIT CONS WASTAGE
RED
28
29
30
CENTERED UNDER 31
RED PCS 1 2%
MAIN LABEL 32
34
36
38
1 2%
1 2%
ABOVE WEARERS
SYBK-BLACK RIGHT WELT BLACK PCS 1 2%
POCKET
1 2%
28 1 2%
29 1 2%
38 1 2%
1 2%
28 1 2%
29 1 2%
30 1 2%
31 1 2%
RED CF PSC
34 1 2%
36 1 2%
38 1 2%
CENTERED
REDON WEARERS BACK LEFT PANEL ON WAISTBAND
PSC 1 2%
RED CF PCS 1 2%
WHITE polybag 2 5%
MARMONT RED SHELL FABRIC 56'' Y 1 5%
JET BLACK
SIDE SEAMS AND BACK WELT POCKETS
56'' Y 0 5%
ay lỗi là bao nhiêu .Sau khi xác định được cần tính tổng và chi phí phát sinh rồi ta liên hệ đén nhà cung cấp gi
o hàng bị lỗi để sản xuất cho kịp tiến độ và liên hệ bên vận chuyển để tính chi phí phát sinh .
lượng NPL bị thiếu hay lỗi ,sau đó liên hệ đến khách hàng để giải thích ,thương lượng .Sau khi đã lắng nghe
ai lầm lần sau,cần đưa ra lời cam kết chắc chắn không để lặp lại tình trạng này nữa.
sẽ xử lý như thế nào, vấn đề sổ sách, báo cáo có được làm đúng hay không. Rất nhiều shop do không kiểm soá
CONS+WASTAGE
GARMENT QTY NEED STOCK ORDER REMARKS
0.00 6756 0 0 0
0.00 401 0 0 0
0.00 0 0 0 0
30.60 0 0 0 0
iên hệ đén nhà cung cấp giải thích rõ nguyên nhân gây ra tình trạng đó .
ợng .Sau khi đã lắng nghe để khách hàng nguôi giận, việc tiếp theo mà bạn cần làm là cùng họ tìm hiểu nguyê
ều shop do không kiểm soát được việc này dẫn đến hàng thất thoát, nhân viên lợi dụng sơ hở để trộm đồ, số liệ
Số
received lượng
ship doc qty
acctual Defect có thể
Materia sử dụng Đồng bộ
l Balance Miss Garment NPL
6891
15320 100 15220 8329 8165.56862745 14922
919 1230 0 1230 311 304.882352941 1206
1072 1800 0 1800 728 713.705882353 1765
1701 2200 20 2180 445 436.254901961 2137
701 610 10 600 -1135 -1112.76470588 -412
937 1210 10 1200 263 257.470588235 1176
695 619 10 609 -86 -83.9411764706 597
409 1230 10 1220 811 795.078431373 1196
409
409
145 100 45 -364 -356.882352941 44
88 78 30 48 48 0 0
120.86
33.84
67.91
25.65
-158.74
28.02
-12.33
198.27
199.74
138.71
152.78
106.22
131.60
29.25
32.75
66.97
32.56
-14.83
30.58
-12.47
197.30
190.94
-75.65
-89.00
29.88
-98.55
-94.49
-92.07
-97.11
-83.93
0.00
0.00
0.00
0.00
0.00
-91.11
-82.25
-90.52
-16.83
-99.13
g vội quy trách nhiệm.Cần xem xét mức độ thiệt hại gây ra co khách hàng đưa ra hướng giải quết phù hợp.sau
giải quết phù hợp.sau đó ,điều động lại nhân viên và chỉ ra cho họ các lỗi sai để họ chú tâm vào công việc.Nếu
âm vào công việc.Nếu không tìm được NPL hãy thương lượng với nhà cung cấp để mua thêm để bù sản xuất h
thêm để bù sản xuất hàng bị lỗi
TRIMS CARD
STYLE : X94B01R8AN1 GARMENT : PANT
(X94B01-001)
STEFANO SATIN TAPE
PANT
Item: Fabric Item:LINING Item:BAROLL Item:FUSING FOR
85% POLYESTER 15% Place:WAISTBAND SMALL PART
RAYON Place:Pocketing lining Color:Black Place: FUSING
Place :SHELL FABRIC Color:Jet FOR SMALL PART
Color:Jet black A996( Jet black
black A996) Marmont Color:Charcoal
red(marmont red)
Item:FTY YC Item:Hook and Bar Item: MAIN LABEL Item: SIZE LABEL
GUESS LOGO PLATE Place:Waistband Place:INSIDE CB Color: Place:CENTERED
Place:ABOVE Color:GUN- RED UNDER MAIN LABEL
WEARERS RIGHT WELT Gunmetal Color:RED
BACK POCKET
Color:SYBK-
SHINY BLACK BLACK
Item:button Item:button
Place:CF Place:2 BACK
Color: Jet black A996( Jet POCKETS AND
black A996) Marmont WASIBAND
red( red) Color: Jet black
A996( Jet black A996)
Marmont red( red)
Item:Care label SLIT
EDGE SATIN BLACK
W/QR Place: SEW
IN BETWEEN THE
SEAM OF THE WB
AND THE LEFT FRONT
PANEL 2 INCHES
FROM SIDE SEAM
Color:BLACK
NO ITEM ART/CODE SUPPLIER
SIZE LABEL
PURE WHITE
GREY
MAIN LABEL
2 PURE WHITE ML880255 AVERY
GREY
Zipper (COIL
CLOSED W/ DA
5 PULLERZP210120 SEMI ZI210532 NO3 TALON
AUTOLOCK GUESS
PULL)
RED RED
RED RED
SYBK-BLACK SYBK-BLACK
BLACK BLACK
BLACK BLACK
BLACK RED
RED RED
Jet Black A996 (JBLK) RED
Jet Black A996 (JBLK) RED
GUN-GUNMETALGUN-GUNMETAL
WHITE WHITE
BLACK BLACK
42MMT 40MMT
C9600 C9700
42MMT 40MMT
C9600 C9700
C9600 c9700
BALANCE SHEET OF MATERIAL
28
29
30
31
32
CENTERED UNDER MAIN LABEL PCS 1
34
36
38
1
INSIDE CB PCS 1
1
1
28 1
29 1
30 1
31 1
32 1
34 1
SEW IN BETWEEN THE SEAM OF THE WB AND THE
36 PCS 1
LEFT FRONT PANEL 2 INCHES FROM SIDE SEAM
38 1
SEW IN BETWEEN THE SEAM OF THE WB AND THE
PCS
LEFT FRONT PANEL 2 INCHES FROM SIDE SEAM
38 1
1
28 1
29 1
30 1
CF PSC
31 1
34 1
36 1
38 1
CENTERED ON WEARERS BACK LEFT PANEL ON WAISTBAND PSC 1
UNDER COLLAR FELT PCS 1
2 BACK POCKETS AND WASIBAND PCS 2
WAISTBAND SET 1
polybag 2
WAISTBAND 110CM M 0
5% 0.00 6756 0 0 0
5% 0.00 401 0 0 0
2% 0.00 0 0 223 -223
2% 0.00 0 0 0 0
2% 30.60 0 0 0 0
5% 145.95 6756 986038 0 986038
409
409
409
88 78 30 48 48 0
0 0 90 -90 -90 -2.9412
1442.3529411765 Tổ may 2
1202 199.74
16127 138.71 19352.941176471 Tổ may 3
7500 152.78 9000
7814 106.22 9376.4705882353
15647.05882353 Tổ may 4
15647 131.60
6985.8823529412 Tổ may 5,6
8732 29.25
1196 32.75 956.86274509804 Tổ may 5
1755 66.97 1403.9215686275 Tổ may 5
2255 32.56 1803.9215686275 Tổ may 5
597 -14.83 477.64705882353 Tổ may 5
1200 30.58 960 Tổ may 5
596 -12.47 476.86274509804 Tổ may 5
1192 197.30 953.72549019608 Tổ may 6
1167 Tổ may 6
933.33333333333
0 Tổ may 6
Tổ may 6
0 933.33333333333
Tổ may 6
0
0 190.94 Tổ may 6
1645 -75.65
43.428571428572 Tổ cắt
1086 -83.93
6756 0.00 270.24 Tổ cắt
401 0.00 16.04 Tổ cắt
0 Tổ cắt
0 0.00
0 Tổ cắt
0 0.00
-3 0.00 -0.0588235294118 Tổ cắt
720.32887975334 Tổ hoàn thành
600 -91.11
1438.7301587302 Tổ hoàn thành
1199 -82.25
768.60952380952 Tổ hoàn thành
641 -90.52
6742.8571428572 Tổ hoàn thành
5619 -16.83
70.857142857143 Tổ hoàn thành
59 -99.13
BALANCE SHEET OF MATERIAL
COLOUR COMBINATION
(MYGY
(JBLK) )
SUPPL Jet MOUN POSITI
NO ITEM ART SIZE UNIT CONS
IER Black TAIN ON
A996 GREY
A928
SIZE
LABEL
28
29
CENTE
PURE RED 30
1 WHITE
LA210194 COO/
AVERY RED RED UNDER 31 PCS 1
MAIN 32
LABEL 34
36
GREY
38
MAIN
1
LABEL
INSIDE
2 ML880255AVERY RED RED PCS
PURE CB
1
WHITE
GREY 1
ABOVE
FTY WEAR
YC ERS
LABEL
3 GUESRM-210997 SYBK-BLACK
SYBK-BLACK
RIGHT PCS 1
TEX
LOGO WELT
OLATE BLACK
POCKE
T
BETWE 1
EN THE
CARE
EN THE
28 1
SEAM
OF THE 29 1
CARE 30 1
WB
LABEL 31 1
AND
SLIT
THE 32 1
EDGE
4 CL 90016AVERY BLACK BLACK LEFT 34 PCS 1
SATIN
FRONT 36 1
BLAC
PANEL
K
2
W/QR
INCHE
S 38 1
FROM
(COIL SIDE
CLOSE 1
D W/ 28 1
DA 29 1
PULLE 30 1
5 RZP210ZI210532 NO3
TALON BLACK RED CF PSC
120 31 1
SEMI 34 1
AUTO 36 1
LOCK 38 1
GUESS
FTY
NEW
6 SIZE BU211187
CENTERED
AVERY ON
RED
WEARERS
RED BACK LEFT PANELPSC
ON WAISTBAND
1
JOKER
S
LION UNDER
7 32L BU211002BUTTO
Jet Black A996 (JBLK)
RED COLLA PCS 1
N R FELT
LION
8 24L HF7256 BUTTO
Jet Black A996
2 BACK
(JBLK)
RED
POCKETS AND WASIBAND
PCS 2
N
Hook
9 NO 29 BTSC
GUN-GUNMETAL
GUN-GUNMETAL
WAISTBAND SET 1
and Bar
barcode Trung
10 ST 338 WHITE WHITE polybag 2
sticker Dũng
FABRI
C 85%
POLYE
11 STER DTR 160WYIPHI
Jet Black A996
MARMONT
(JBLK)
SHELL
REDFABRIC56'' Y 1
15%
RAYO
N
LININ
12 210T LESENJET BLACK
JET POCKETING
BLACK LINING
56'' Y 0
G
13 SATIN ST223 FTY JET
SIDE
BLACK
SEAMS
JET BLACK
AND BACK WELT
56'' POCKETS
Y 0
FUSIN
FUSIN
G FOR
G FOR
14 SMAL BS730 5S Charcal Charcal 150 CM M 0
SMALL
L
PART
PART
FACTO
BARO RY
15 CS950 BLACK BLACK
WAISTBAND
110CM M 0
LL SOURC
E
HOÀN
CART
16 G PACKING150cm CNT 30
ON
LONG
Coats
Chỉ may 5000m/
18 Thread 60/2 Phong C9600 C9700 M 90
lót cone
Phú
Chỉ đính
Coats
cúc, 5000m/
19 Thread EPIC Phong 42MMT 40MMT M 15
quấn cone
Phú
chân cúc
REMA
WASTAGE
CONS+WASTAGE
GARMENT QTY
NEED STOCK ORDER
RKS
5% 0.00 6756 0 0 0 0
5% 0.00 6756 0 0 0 0
2% 0.00 0 0 0 0 0
2% 30.60 0 0 0 0 0
COLOR
FABRIC ORDER QUANTITY
ITEM # CODE & CODE NO: LD NO.
DESCRIPTION (YDS)
NAME
JET
1 SATIN BLACK
ST223 0
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY NAME TRUNG DŨNG
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT (VND) ETD ETA REMARK
(VND/CONE) BY
SEA
0 0
uld be sent to PPJ office 3 days before ex-mill date under fabric supplier account
rcial invoice
list + detail packing list
ding (or AWB)
ion report
er should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
packed in water/air proof nylon bags free from BHT (it is the least packing).
: to be packed in Black Nylon bags free from BHT.
D and ETA confirmation, PPJ deduct 3% amount from the shipped quantity.
D and ETA confirmation, PPJ deduct 5% amount from the shipped quantity.
TD and ETA confirmation, PPJ deduct 10% amount from the shipped quantity.
and ETA confirmation, PPJ reserves the right to cancel order the order without paying any liabilities.
Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
son incharge
y liabilities.
FROM:
PHONG PHU
INTERNATIONAL
TANG NHON PHU JSC
B WARD, DISTRICT
9, HCMC, VIETNAM
TEL: +(84) 8-7305 6886
EMAIL:
COLOR
FABRIC ORDER QUANTITY
ITEM # CODE & CODE NO: LD NO.
DESCRIPTION (YDS)
NAME
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY NAME FACTORY SOURCE
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT (VND) ETD ETA REMARK
(VND/CONE) BY
SEA
0 0
uld be sent to PPJ office 3 days before ex-mill date under fabric supplier account
rcial invoice
list + detail packing list
ding (or AWB)
ion report
er should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
packed in water/air proof nylon bags free from BHT (it is the least packing).
: to be packed in Black Nylon bags free from BHT.
D and ETA confirmation, PPJ deduct 3% amount from the shipped quantity.
D and ETA confirmation, PPJ deduct 5% amount from the shipped quantity.
TD and ETA confirmation, PPJ deduct 10% amount from the shipped quantity.
and ETA confirmation, PPJ reserves the right to cancel order the order without paying any liabilities.
Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
son incharge
y liabilities.
FROM:
PHONG PHU
INTERNATIONAL
TANG NHON PHU JSC
B WARD, DISTRICT
9, HCMC, VIETNAM
TEL: +(84) 8-7305 6886
EMAIL:
COLOR
FABRIC ORDER QUANTITY
ITEM # CODE & CODE NO: LD NO.
DESCRIPTION (YDS)
NAME
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY NAME HOÀNG LONG
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT (VND) ETD ETA REMARK
(VND/CONE) BY
SEA
0 0
uld be sent to PPJ office 3 days before ex-mill date under fabric supplier account
rcial invoice
list + detail packing list
ding (or AWB)
ion report
er should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
packed in water/air proof nylon bags free from BHT (it is the least packing).
: to be packed in Black Nylon bags free from BHT.
D and ETA confirmation, PPJ deduct 3% amount from the shipped quantity.
D and ETA confirmation, PPJ deduct 5% amount from the shipped quantity.
TD and ETA confirmation, PPJ deduct 10% amount from the shipped quantity.
and ETA confirmation, PPJ reserves the right to cancel order the order without paying any liabilities.
Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
son incharge
y liabilities.
FROM:
PHONG PHU
INTERNATIONAL
TANG NHON PHU JSC
B WARD, DISTRICT
9, HCMC, VIETNAM
TEL: +(84) 8-7305 6886
EMAIL:
COLOR
FABRIC ORDER QUANTITY
ITEM # CODE & CODE NO: LD NO.
DESCRIPTION (YDS)
NAME
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY NAME FTY
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT (VND) ETD ETA REMARK
(VND/CONE) BY
SEA
0 709
uld be sent to PPJ office 3 days before ex-mill date under fabric supplier account
rcial invoice
list + detail packing list
ding (or AWB)
ion report
er should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
packed in water/air proof nylon bags free from BHT (it is the least packing).
: to be packed in Black Nylon bags free from BHT.
D and ETA confirmation, PPJ deduct 3% amount from the shipped quantity.
D and ETA confirmation, PPJ deduct 5% amount from the shipped quantity.
TD and ETA confirmation, PPJ deduct 10% amount from the shipped quantity.
and ETA confirmation, PPJ reserves the right to cancel order the order without paying any liabilities.
Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
son incharge
y liabilities.
FROM:
PHONG PHU
INTERNATIONAL
TANG NHON PHU JSC
B WARD, DISTRICT
9, HCMC, VIETNAM
TEL: +(84) 8-7305 6886
EMAIL:
COLOR
FABRIC ORDER QUANTITY
ITEM # CODE & CODE NO: LD NO.
DESCRIPTION (YDS)
NAME
GUN-
SYBK-
1 Hook and Bar BLACK
GUNMET 4598
AL
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY NAME BTSX
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT (VND) ETD ETA REMARK
(VND/CONE) BY
SEA
0 460
uld be sent to PPJ office 3 days before ex-mill date under fabric supplier account
rcial invoice
list + detail packing list
ding (or AWB)
ion report
er should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
packed in water/air proof nylon bags free from BHT (it is the least packing).
: to be packed in Black Nylon bags free from BHT.
Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
son incharge
y liabilities.
FROM:
PHONG PHU
INTERNATIONAL
TANG NHON PHU JSC
B WARD, DISTRICT
9, HCMC, VIETNAM
TEL: +(84) 8-7305 6886
EMAIL:
COLOR
FABRIC ORDER QUANTITY
ITEM # CODE & CODE NO: LD NO.
DESCRIPTION (YDS)
NAME
1
Zipper (COIL 28 919
CLOSED W/
DA
ZI210532
PULLERZP210 NO3
2 120 SEMI 29 1072
3 AUTOLOCK 30 1701
4
GUESS PULL 31 701
5 34 937
36 695
38 409
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shad
a. Quality Attention: 4. DELIVERY COND
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY NAMTALON
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT (VND) ETD ETA REMARK
(VND/CONE)
BY SEA
0.09 83
0.09 96
0.09
153
0.09
0.09 84
0.09 63
0.09 37
rcial invoice
list + detail packing list
ding (or AWB)
ion report
er should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
packed in water/air proof nylon bags free from BHT (it is the least packing).
: to be packed in Black Nylon bags free from BHT.
Phu B ward, Dist 9, HCM city, Vietnam.
D and ETA confirmation, PPJ deduct 3% amount from the shipped quantity.
D and ETA confirmation, PPJ deduct 5% amount from the shipped quantity.
TD and ETA confirmation, PPJ deduct 10% amount from the shipped quantity.
and ETA confirmation, PPJ reserves the right to cancel order the order without paying any liabilities.
Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
FROM:
PHONG PHU
INTERNATIONAL
TANG NHON PHU JSC
B WARD, DISTRICT
9, HCMC, VIETNAM
TEL: +(84) 8-7305 6886
EMAIL:
COLOR
FABRIC ORDER QUANTITY
ITEM # CODE & CODE NO: LD NO.
DESCRIPTION (YDS)
NAME
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY NAME LABELTEX
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT (VND) ETD ETA REMARK
(VND/CONE) BY
SEA
0 276
uld be sent to PPJ office 3 days before ex-mill date under fabric supplier account
rcial invoice
list + detail packing list
ding (or AWB)
ion report
er should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
packed in water/air proof nylon bags free from BHT (it is the least packing).
: to be packed in Black Nylon bags free from BHT.
Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
son incharge
y liabilities.
FROM: TO: CONTACT PERSON
PHONG PHU
INTERNATIONAL
TANG NHON PHU JSC
B WARD, DISTRICT COMPANY 5S
9, HCMC, VIETNAM Address :
TEL: +(84) 8-7305 6886 TEL#: FAX#:
EMAIL: EMAIL:
FOB QD
COLOR ORDER PRICE
FABRIC
ITEM # CODE & CODE NO: LD NO. QUANTI (USD/Y AMOUNT ETD
DESCRIPTION
NAME TY (YDS) DS) BY (USD)
SEA
1 Charcoal BS730 2520 0.25 630.00
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncludingCommercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHU is allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DANG VU HUNG
RSON
ETA REMARK
ent to PPJ office 3 days before ex-mill date under fabric supplier account
ld send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
d in water/air proof nylon bags free from BHT (it is the least packing).
packed in Black Nylon bags free from BHT.
er must compensate the goods in right quality in the time frame required by Phong Phu
orting, retreatment,…)
FROM: TO: CONTACT PERSON
PHONG PHU INTERNATIONAL
JSC
TANG NHON PHU B WARD, DISTRICT 9, COMPANY LESEN
HCMC, VIETNAM Address :
TEL: +(84) 8-7305 6886 TEL#: FAX#:
EMAIL: EMAIL:
FOB QD
COLOR ORDER PRICE
FABRIC CODE
ITEM # CODE & LD NO. QUANTI (USD/Y AMOUNT ETD
DESCRIPTION NO:
NAME TY (YDS) DS) BY (USD)
SEA
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 day
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation wiIncludingCommercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ba
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by iro - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No shortPHONG shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash, 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ
b. Supplier should cut 80cm head end on each ro* Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ bu* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DANG VU HUNG
RSON
ETA REMARK
ent to PPJ office 3 days before ex-mill date under fabric supplier account
ld send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
d in water/air proof nylon bags free from BHT (it is the least packing).
packed in Black Nylon bags free from BHT.
rting, retreatment,…)
FROM: TO: CONTACT PERSON
PHONG PHU INTERNATIONAL
TANG NHON JSC
PHU B WARD, DISTRICT 9, HCMC, COMPANY
VIETNAM Address :
TEL: +(84) 8-7305 6886 TEL#:
EMAIL: EMAIL:
FOB QD
COLOR ORDER PRICE
CODE
ITEM # FABRIC DESCRIPTION CODE & LD NO. QUANTI (USD/Y
NO:
NAME TY (YDS) DS) BY
SEA
FABRIC 85%
DTR
1 POLYESTER 15% 160W
56" 7094 1.88
RAYON
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ off
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation wiIncludingCommercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs t
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of good
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ironing or - Fabrics should be carefully packed in water/air p
- Dead folds that cannot be removed by ironing or chemic- For White and Light fabrics: to be packed in Blac
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short shipment PHONG
is allowed.
PHU INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, H
2. APPROVED DYE LOT, HEAD END, FABRIC TEST AND BLAN (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash, rinse w 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : ) under * Above 1-3 days late of ETD and ETA confirmati
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmati
b. Supplier should cut 80cm head end on each roll (free * Above 7-10 days late of ETD and ETA confirma
2 sets of blanket (all rolls) shipped together w/ bulk fabric* Over 10 days late of ETD and ETA confirmation
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DANG VU HUNG
TO: CONTACT PERSON
YIPHI TEX
FAX#:
PO ref.#:
PO DATED:
13,336.72
hades should be sent to PPJ office 3 days before ex-mill date under fabric supplier account
ONDITIONS:
rcial invoice
list + detail packing list
ding (or AWB)
on report
y LC, shipper should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
t)/ (Shipping dept).
must show the true value of goods for customs declaration & payment purpose.
be carefully packed in water/air proof nylon bags free from BHT (it is the least packing).
ight fabrics: to be packed in Black Nylon bags free from BHT.
TERNATIONAL JSC
Tang Nhon Phu B ward, Dist 9, HCM city, Vietnam.
t)/ (Shipping dept).
late of ETD and ETA confirmation, PPJ deduct 3% amount from the shipped quantity.
late of ETD and ETA confirmation, PPJ deduct 5% amount from the shipped quantity.
s late of ETD and ETA confirmation, PPJ deduct 10% amount from the shipped quantity.
te of ETD and ETA confirmation, PPJ reserves the right to cancel order the order without paying any liabilities.
s, Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
o person incharge
ng any liabilities.
FROM:
PHONG PHU
INTERNATIONAL
TANG NHON PHU JSC
B WARD, DISTRICT
9, HCMC, VIETNAM
TEL: +(84) 8-7305 6886
EMAIL:
COLOR
FABRIC ORDER QUANTITY
ITEM # CODE & CODE NO: LD NO.
DESCRIPTION (YDS)
NAME
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation withIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough yarn - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY NAMCOATS PHONG PHÚ
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT (VND) ETD ETA REMARK
(VND/CONE)
BY SEA
32800 32342046400
31801 20303094042
31801
3383849007
31801
31801 11279496690
uld be sent to PPJ office 3 days before ex-mill date under fabric supplier account
rcial invoice
list + detail packing list
ding (or AWB)
ion report
er should send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
packed in water/air proof nylon bags free from BHT (it is the least packing).
: to be packed in Black Nylon bags free from BHT.
D and ETA confirmation, PPJ deduct 3% amount from the shipped quantity.
D and ETA confirmation, PPJ deduct 5% amount from the shipped quantity.
TD and ETA confirmation, PPJ deduct 10% amount from the shipped quantity.
and ETA confirmation, PPJ reserves the right to cancel order the order without paying any liabilities.
Supplier must compensate the goods in right quality in the time frame required by Phong Phu
PURCHASER
FROM: TO: CONTACT PERSON
INTERNATIONAL
JSC
TANG NHON PHU B WARD, COMPANY NAME
DISTRICT
TEL: +(84)9,8-HCMC, VIETNAM Address :
7305 6886 TEL#:
EMAIL: EMAIL:
GREY
38 409 0.02
28 919 0.1
38 409 0.1
4
FTY NEW
SIZE
JOKERS JO210127 6891 0.04
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 days
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation within one rolIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ban
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cus
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by ir - Fabrics should be carefully packed in water/air proof nylo
- Dead folds that cannot be removed by ironing - For White and Light fabrics: to be packed in Black Nylon b
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No short PHONG
shipment
PHUis allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city,
2. APPROVED DYE LOT, HEAD END, FABRIC TEST (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ d
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ d
b. Supplier should cut 80cm head end on each ro * Above 7-10 days late of ETD and ETA confirmation, PPJ
2 sets of blanket (all rolls) shipped together w/ b* Over 10 days late of ETD and ETA confirmation, PPJ res
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DANG VU HUNG
TACT PERSON
AVERY
FAX#:
AMOUNT
ETD ETA REMARK
(USD)
18.38
21.44
34.02
14.02
18.74
13.90
8.18
8.18
151.30
193.25
91.90
107.20
170.10
70.10
93.70
69.50
40.90
40.90
275.64
ent to PPJ office 3 days before ex-mill date under fabric supplier account
d send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
in water/air proof nylon bags free from BHT (it is the least packing).
packed in Black Nylon bags free from BHT.
er must compensate the goods in right quality in the time frame required by Phong Phu
orting, retreatment,…)
PURCHASER
FROM:
INTERNATIONAL
JSC
DISTRICT 9, HCMC,
VIETNAM
TEL: +(84) 8-
7305 6886
EMAIL:
FABRIC COLOR
ORDER QUANTITY
ITEM # DESCRIP CODE & CODE NO: LD NO.
(YDS)
TION NAME
button,
MATTE
PLASTIC BLACK
1 LOGO BU211187 32L 6891
BUTTON GREY
button,
MATTE BLACK
PLASTIC
2 LOGO BU211187 24L 13782
BUTTON
GREY
1. PAYMENT TERM:
Paymen
45 FOB
t term:
2. QUALITY and QUANTITY ALLOWANCE: 2 yds of 3 main shades should be sent to PPJ office 3 day
a. Quality Attention: 4. DELIVERY CONDITIONS:
Pls overcome unaccepted defects: a. Docs required:
- Slub - Color variation within one rollIncluding: Commercial invoice
- Foreign yarn - Fade of color Packing list + detail packing list
- Thin yarn, rough - Dyeing block Bill of lading (or AWB)
- Break yarn - Color spot Inspection report
- Needle holes - Dirty *With payment by LC, shipper should send docs to the ba
- Stop mark - Holes (Purchasing dept)/ (Shipping dept).
- Scratch - Printing error *Invoice and PL must show the true value of goods for cu
- Color staining b. Packing/ Lableling:
- Fold, crease mark that can't be removed by iro - Fabrics should be carefully packed in water/air proof nyl
- Dead folds that cannot be removed by ironing o- For White and Light fabrics: to be packed in Black Nylon
b. Quantity allowance: c. Consignee/ Invoice to:
Overshipped qty -2%-> 0% is accepted. No shortPHONG shipmentPHU
is allowed.
INTERNATIONAL JSC
Only good quality quantity is paid Tang Nhon Phu, Tang Nhon Phu B ward, Dist 9, HCM city
2. APPROVED DYE LOT, HEAD END, FABRIC TEST A (Purchasing dept)/ (Shipping dept).
a. Bulk Dye lots approved (1 set = before wash, 5. PENALTY POLICY:
should be sent to PPJ person incharge (Attn : * Above 1-3 days late of ETD and ETA confirmation, PPJ
courier account 7-10 days before ex-mill date. * Above 4-6 days late of ETD and ETA confirmation, PPJ
b. Supplier should cut 80cm head end on each rol* Above 7-10 days late of ETD and ETA confirmation, PP
2 sets of blanket (all rolls) shipped together w/ bul* Over 10 days late of ETD and ETA confirmation, PPJ re
* If any defects were found in the goods at Phong Phu's production process, Supplier must compensate th
(usually within one week upon receipt of the claim).
* All costs arise due to defected fabrics will be charged to Suppliers (for example: sorting, retreatment,…)
DIRECTOR CHECK BY
DANG VU HUNG
TO: CONTACT PERSON
COMPANY N LION BUTTON
Address :
TEL#: FAX#:
EMAIL:
PO ref.#:
PO DATED:
FOB QD
PRICE
AMOUNT ETD ETA REMARK
(USD/YDS)
(USD)
BY SEA
0.05 344.55
0.05 689.10
sent to PPJ office 3 days before ex-mill date under fabric supplier account
uld send docs to the bank within 3 days from vessel date and inform AWB# to person incharge
ed in water/air proof nylon bags free from BHT (it is the least packing).
packed in Black Nylon bags free from BHT.
er must compensate the goods in right quality in the time frame required by Phong Phu
orting, retreatment,…)
PURCHASER