Project Development of an Access Controlled Six Lane (Expandable to Eight Lane) Greenfield "Ganga Expressway" from Km.

xpressway" from Km. 496+800 To Km. 548+800 in the State of Uttar Pradesh on DBFOT (Toll) basis under PPP. Package-12 (G-IV).

Client U.P. Expressway Industrial Development Authority (UPEIDA)


Independent Engineer M/S Dhruv Consultancy ServicesLtd. In JV with Global Infra Solution.
Contractor Unnao Prayagraj Road Private Limited

REQUEST FOR INSPECTION (RFI) SUMMARY SHEET


Date:- 10/5/2023
Group Sl No RFI No. RFI- Carriage Date of RFI Task/ Side Description of RFI / Item Inspection Date/ Layer / Test RFI-Checking
No Type way Chainage Structure Time Lift IE Comment
Group/
Section/HWY (Revisio
or Str or Sur n/ (MCW/SR)
or Lab or
Misc./ RFI Spot)
Number From To
1 2 3 4 5 6 7 8 9 10 12 12 13 14 15
Highway
4 7704 4/3/HWY/7704 MCW 9-May-23 548+800 549+000 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 12:15 PM 2 FDD
4 7705 4/3/HWY/7705 MCW 9-May-23 548+800 549+000 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 11:10 AM 2 FDD
4 7706 4/3/HWY/7706 MCW 9-May-23 549+000 549+200 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 12:15 PM 2 FDD
4 7707 4/3/HWY/7707 MCW 9-May-23 549+000 549+200 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 12:10 PM 2 FDD
4 7708 4/3/HWY/7708 SR 9-May-23 550+900 551+000 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 02:00 PM 1 FDD
4 7709 4/3/HWY/7709 SR 9-May-23 551+000 551+250 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 11:00 AM 1 FDD
4 7710 4/3/HWY/7710 SR 9-May-23 551+250 551+450 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 01:15 PM 1 FDD
4 7711 4/3/HWY/7711 MCW 9-May-23 554+300 554+400 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 11:00 AM 10 FDD
4 7712 4/3/HWY/7712 MCW 9-May-23 554+300 554+400 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 03:20 PM 8 FDD
4 7713 4/3/HWY/7713 MCW 9-May-23 554+400 554+500 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 12:45 PM 8 FDD

4 7714 4/3/HWY/7714 MCW 9-May-23 554+906 RE PANEL Checking of Reinforcement, shuttering and pouring of 10/05/23 / 11:10 AM Type- 2F Checking
concrete for Precast RE Panel (6 Nos.)

4 7715 4/3/HWY/7715 MCW 9-May-23 554+906 RE PANEL Checking of Reinforcement, shuttering and pouring of 10/05/23 / 12:45 PM Type- 4S Checking
concrete for Precast RE Panel (40 Nos.)
4 7716 4/3/HWY/7716 MCW 9-May-23 556+450 556+630 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 12:10 PM 12 FDD
4 7717 4/3/HWY/7717 MCW 9-May-23 557+800 557+900 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 02:00 PM 5 FDD
4 7718 4/3/HWY/7718 MCW 9-May-23 558+450 558+650 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 11:00 AM 1 FDD
4 7719 4/3/HWY/7719 MCW 9-May-23 558+710 558+800 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 01:30 PM 4 FDD
4 7720 4/3/HWY/7720 MCW 9-May-23 558+710 558+800 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 03:20 PM 5 FDD
4 7721 4/3/HWY/7721 MCW 9-May-23 559+000 559+300 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 01:15 PM 12 FDD
4 7722 4/3/HWY/7722 MCW 9-May-23 559+080 559+300 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 11:00 AM 24 FDD
4 7723 4/3/HWY/7723 MCW 9-May-23 563+480 563+650 Subgrade L/S FDD Checking of Subgrade Layer 10/05/23 / 03:20 PM SG-1 FDD
4 7724 4/3/HWY/7724 MCW 9-May-23 563+480 563+650 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 12:45 PM Emb Top-1 FDD
4 7725 4/3/HWY/7725 MCW 9-May-23 565+500 565+650 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 11:00 AM 2 FDD
4 7726 4/3/HWY/7726 MCW 9-May-23 568+550 568+650 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 11:10 AM 8 FDD
4 7727 4/3/HWY/7727 MCW 9-May-23 569+750 570+000 Subgrade R/S FDD Checking of Subgrade Layer 10/05/23 / 12:45 PM SG-2 FDD

4 7728 4/3/HWY/7728 MCW 9-May-23 570+570 Box culvert R/S FDD Checking of Embankment Layer (Backfilling 10/05/23 / 04:30 PM 2 FDD
Portion A1 Side)

4 7729 4/3/HWY/7729 MCW 9-May-23 570+570 Box culvert R/S FDD Checking of Embankment Layer (Backfilling 10/05/23 / 12:45 PM 1 FDD
Portion A2 Side)

4 7730 4/3/HWY/7730 MCW 9-May-23 570+570 Box culvert R/S FDD Checking of Embankment Layer (Backfilling 10/05/23 / 01:30 PM 2 FDD
Portion A2 Side)

4 7731 4/3/HWY/7731 MCW 9-May-23 570+570 Box culvert L/S FDD Checking of Embankment Layer (Backfilling 10/05/23 / 02:00 PM 2 FDD
Portion A2 Side)
4 7732 4/3/HWY/7732 MCW 9-May-23 570+850 571+000 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 02:00 PM 12 FDD
4 7733 4/3/HWY/7733 MCW 9-May-23 571+130 571+240 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 02:00 PM 7 FDD
4 7734 4/3/HWY/7734 MCW 9-May-23 571+130 571+190 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 12:45 PM 9 FDD
4 7735 4/3/HWY/7735 MCW 9-May-23 571+190 571+240 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 02:00 PM 6 FDD
4 7736 4/3/HWY/7736 MCW 9-May-23 572+000 572+100 Subgrade R/S FDD and level Checking of Subgrade Layer 10/05/23 / 01:15 PM SG Top FDD & LEVEL
4 7737 4/3/HWY/7737 MCW 9-May-23 573+700 573+800 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 12:45 PM 1 FDD
4 7738 4/3/HWY/7738 MCW 9-May-23 573+700 573+800 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 02:00 PM 1 FDD
4 7739 4/3/HWY/7739 MCW 9-May-23 578+500 578+600 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 11:00 AM 4 FDD
4 7740 4/3/HWY/7740 MCW 9-May-23 578+850 579+600 C&G L/S CLearing and grubbing road land 10/05/23 / 12:45 PM Checking
4 7741 4/3/HWY/7741 MCW 9-May-23 578+850 579+600 OGL L/S OGL - FDD Checking 10/05/23 / 02:00 PM FDD(OGL)
4 7742 4/3/HWY/7742 MCW 9-May-23 580+250 580+350 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 02:00 PM 7 FDD
4 7743 4/3/HWY/7743 MCW 9-May-23 580+250 580+350 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 03:20 PM 8 FDD
4 7744 4/3/HWY/7744 MCW 9-May-23 581+300 581+400 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 12:10 PM 2 FDD
4 7745 4/3/HWY/7745 MCW 9-May-23 582+850 583+000 Embankment R/S FDD Checking of Embankment Layer 10/05/23 / 01:15 PM 3 FDD
4 7746 4/3/HWY/7746 MCW 9-May-23 582+850 583+000 Embankment L/S FDD Checking of Embankment Layer 10/05/23 / 12:10 PM 3 FDD

4 7747 4/3/HWY/7747 MCW 9-May-23 584+600 584+800 Embankment R/S FDD Checking of Embankment Layer (widening 10/05/23 / 11:00 AM 2 FDD
portion(width-15m) ref RFI-4014

Lab

Structure
4 1593 4/3/Str/1593 MCW 9-May-23 554+960 Flyover R/S Checking of Reinforcement, Shuttering and pouring of 10/05/23 / 11:00 AM P1
concrete for pile cap
9-May-23 SVUP R/S Checking of Reinforcement,shuttering and pouring of
4 1594 4/3/Str/1594 MCW 562+457 concreting of BOTTOM HUNCH A1 & A2
10/05/23 / 01:00 PM

9-May-23 LVUP R/S Checking of Reinforcement,shuttering and pouring of


4 1595 4/3/Str/1595 MCW 563+027 concrete M40 For Wall 4th Lift A1 & A2
10/05/23 / 12:00 PM 4
4 1596 4/3/Str/1596 MCW 9-May-23 587+300 Flyover Checking Of Pile Load Test A2 10/05/23 / 12:30 PM
9-May-23 LVUP R/S Checking of Reinforcement,shuttering and pouring of
4 1597 4/3/Str/1597 MCW 590+770 concrete M40 for Wall 3rd Lift A2
10/05/23 / 11:45 AM 3
Checking of Reinforcement,shuttering and pouring of
4 1598 4/3/Str/1598 MCW 9-May-23 CAMP SVUP 10/05/23 / 12:00 PM
concrete M40 for RCC Plank ( SVUP) - 7 Nos
9-May-23 LVUP Checking of Reinforcement,shuttering and pouring of
4 1599 4/3/Str/1599 MCW CAMP concrete M40 for RCC Plank ( LVUP) - 01 Nos
10/05/23 / 12:30 PM

10-May-23 BOX CULVERT R/S Checking of Reinforcement,shuttering and pouring of


4 1600 4/3/Str/1600 Spot MCW 552+757 concreting of BOTTOM HUNCH A1 & A2
10/05/23 / 02:00 PM
Survey
4 700 4/3/SUR/700 9-May-23 578+850 579+600 OGL L/S OGL Jointly Levels Checking 10/05/23 / 11:15 AM OGL Checking