You are on page 1of 1

NOTES:

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO. SHT. NO. DRAWING NUMBER INDEX PLANT NO.
3/4 "
SCALE:
REV. DATE JO/EWO DESCRIPTION ENGG. CERT. PMT OPRNS.
NO.
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION DESIGN REVIEW FOR
UNTIL CERTIFIED AND DATED. CERTIFICATION KEY DRAWINGS
DESIGN CERTIFICATION
DRAWN BY CHECKED BY
DATE STARTED DATE COMPLETED
DISCIPLINE ENGINEER
PROJECT ENGINEER
THIS DRAWING IS NOT TO BE CERTIFIED BY:
USED FOR CONSTRUCTION (NAME)
UNTIL CERTIFIED AND DATED. SIGNATURE DATE
SAUDI ARABIAN OIL COMPANY
REVIEW FOR KEY DRAWINGS REQUIRED NOT REQUIRED
CONSTRUCTION AGENCY
OPERATIONS
OTHER
DRAWING TYPE
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
Saudi Aramco 2634 ENG. (07/93)
VECTOR CADD-03

You might also like