You are on page 1of 4

Goodman Mfg Co, L.P.

A member of Daikin group General Work Standard Document


Status Approved

Template Number Form 002 GWS Rev 1 Document Type Process Name Product Family Revision History
Document Number AAH-GWS-051 Rev. Level Rev. A Rev. B Rev. C Rev. D
Date Created 8-Jun-17 GWS Air Handler
Rev. Date 10/31/2018
Models / Ernest
Make Dept. Production Dept. Mgr.
Name / Signature Pat Galloway Lower Door Assy Part Numbers
Prepared by (Name)
Demmings
Dept. Mgr.
Approver Dept. Production Name / Signature Dhaval Shah ARUF/ASPT Approved by (Name) Jazmin Mar

Step # Step Description Operation Control Quality/Safety Aspect Picture or Diagram

Grab lower door & refrigerant Verify correct parts are


1 Place Panel
panel place them together used on the line

Grab gun & screws. Secure


2 Secure panel the refrigerant panel & lower .
door together

Drop gun. Grab grommet and


3 Install Grommet
insert it in the lower door

Ensure the correct


labels are used, and in
the right orientation
Grab label & place it on the and location Per
4 Apply Label
unit drawing.

Ensure labels are Free


from damage

ISO --> DTTP --> Assembly --> Master Document Location Page 1 of 4
Air Handler --> Level 3--> GWS http://web.goodmanmfg.com
Printed copies are uncontrolled and for reference purposes only
Goodman Mfg Co, L.P.
A member of Daikin group General Work Standard Training Record Document
Status Approved

Format Number: Form 002 GWS Rev 1 Document Type Process Name
Product Family
Revision History
Document Number AAH-GWS-051 Rev. Level Rev. A Rev. B Rev. C Rev. D
Date Created 6/8/2017 GWS Air Handler
Rev. Date 10/31/2018 0 0 0

Make Dept. Production Dept. Mgr.


Pat Galloway
Lower Door Models /
Prepared by (Name) Ernest Demmings 0 0 0
Name / Signature

Dept. Mgr.
Assy Part Numbers

Approver Dept. Production Name / Signature Dhaval Shah ARUF/ASPT Approved by (Name) Jazmin Mar 0 0 0

Employee Number Name Training Date/Time Employee Signature Trainer/Supervisor's signature

ISO --> DTTP --> Assembly --> Master Document Location Page 2 of 4
Air Handler --> Level 3--> GWS http://web.goodmanmfg.com
Printed copies are uncontrolled and for reference purposes only
Goodman Mfg Co, L.P.
A member of Daikin group General Work Standard Training Record Document
Status Approved

Format Number: Form 002 GWS Rev 1 Document Type Process Name
Product Family
Revision History
Document Number AAH-GWS-051 Rev. Level Rev. A Rev. B Rev. C Rev. D
Date Created 6/8/2017 GWS Air Handler
Rev. Date 10/31/2018 0 0 0

Make Dept. Production Dept. Mgr.


Pat Galloway
Lower Door Models /
Prepared by (Name) Ernest Demmings 0 0 0
Name / Signature

Dept. Mgr.
Assy Part Numbers

Approver Dept. Production Name / Signature Dhaval Shah ARUF/ASPT Approved by (Name) Jazmin Mar 0 0 0

Employee Number Name Training Date/Time Employee Signature Trainer/Supervisor's signature

ISO --> DTTP --> Assembly --> Master Document Location Page 3 of 4
Air Handler --> Level 3--> GWS http://web.goodmanmfg.com
Printed copies are uncontrolled and for reference purposes only
Goodman Mfg Co, L.P.
A member of Daikin group General Work Standard Revision Block
Template Number: Form 002 GWS Rev 1 Document Type Process Name Product Family Revision Approvals

Document Number AAH-GWS-051 Air Handler Rev. Level Rev. A Rev. B Rev. C Rev. D
GWS
Date Created 08-Jun-17 Models / Part Numbers 10/31/2018 0 0 0
Lower Door Assy
Rev. Date

Dept. Mgr.
Make Dept. Production Pat Galloway Prepared by (Name) Ernest Demmings 0 0 0
Name / Signature
ARUF/ASPT
Dept. Mgr.
Approver Dept. Production
Name / Signature
Dhaval Shah Approved by (Name) Jazmin Mar 0 0 0

New Change
Page Process # Revision Changed Requestor's
Contents Before Change Change Highlights Reason for change Revision Requestor
Revised Revised Date Name
Level Dept.

NA NA NA NA Initial Release 1 10/31/2018 Assembly Ernest Demmings

ISO --> DTTP --> Assembly --> Revision History


Air Handler --> Level 3--> GWS

You might also like