Repair/panel shop- Remove 1 x panel shop lunch room door, 1.00 5,175.00 10% 5,175.00
supply & install 1 x new door to suit, modify door jamb to allow
door to be hinged outwards, paint new door, supply & install
new panic bar push to open latch, install new external rim
cylinder lock (does not include installation of new lock barrel to
suit master key, locksmith will be required).
Remove 1 x medical transport lunch room door, modify door
jamb to allow door to be hinged outwards, rehinge existing door
to open outward, supply & install new panic bar push to open
latch, install new external rim cylinder lock (does not include
installation of new lock barrel to suit master key, locksmith will
be required).
Remove 1 x workshop rear door, modify existing metal door
jamb to allow door to open outward, supply & install new panic
bar push to open latch.
Construct timber step/ramp at rear workshop door to eliminate
large step down on emergency exit door.
Wash bay- Remove existing locking hardware from 1 x existing 1.00 495.00 10% 495.00
outward opening door, supply & install new panic bar push to
open latch.
Workshop- Supply & install 2 x timber panels to board off 1 x 1.00 330.00 10% 330.00
unused window & 1 x unused door. Cut boards to size, fix off
using suitable fasteners, seal off all edges to eliminate dust
ingress into operations room.
Operations room patch & paint- Plaster repair 1 x wall in 1.00 495.00 495.00
operations room and 1 x damaged wall in stairwell, install new
plasterboard where required, set joints using suitable joint
tape/plaster base coat/plaster top coat, sand/prep ready for
paint, apply colourmatched wall paint to entire wall (2 in total)
to eliminate any evidence or repair. Supply new brackets &
hardware, install existing handrail on stairwell wall.
Subtotal 12,740.00
Terms
Payment terms are 7 days from the date of invoice. All works will be invoiced under the Building and Construction Industry Security of Payment Act
1999.
Payment schedule: 40% Deposit required, 60% Payment within 7 days of job completion.