RIVET CONNECTION PROBLEM:

① SHEARING OF RIVETS
4 -
lum ->
P

#Diss) ~-> 75mm WIDT

P:CAPACITY
RIVETS
n NO. OF
CONNECTON
OF
am!i -> P


=

DDIAMETER
=
OF RIVETS 4-42mm
SS:SHEARING STRESS

& FIND CAPACITY


THE THE
OF CONNECTON SO AS NOTTO

③ BEARING STRESS OF
RIVETS IN PLATES EXCEED THE ALLOWABLE SHEARING STRESS OF
110MPa.

InSpl t:THICKNESS OF PLATES p


4bnS (22)(4)(110) 1k)
=
=
=

SB:BEARING STRESS

④ FIND SAFE
THE VALUE OF P NOT TO EXCEED TE

③ TEARING OFPLATES BEARING STRES OF 220 MPa.

1
Anets" N)
t P Dt n SB
=
22(1)(4)(220)
=
=

here Me
4,OHOLE
ST:TENSILE STRESS FIND
8. THE SAFE VALUE

ST O.GFy
=

W:WIDTHOF
-> NOT
IF

PLATE
SPECIFIED
w *0HOLE
P t[w-nOHOLE] ST
=

P11(75 2(22
=
-

1.4)) (138)
+

O HOLE: DIAMETER
OF HOLE Me #
20KN/ LOWEST
. VALUE

0 HOLE 0 RIVET
=
+1.6

&
EFFICIENCY

1ot
FOR

DRIE
e


EFC
NCre
FULL STRENGTHCAPACITY: Ag ST
Ag txy
=
NBEM:g00mm
3RD CASE
200
LONG 200mm WIDEX lamm THI

PLATES CONNECTED
ARE AS SHOWN. DIAMETER
THE

OF RIVET HOLE IS ASSUME


TO BE 3mm LARGER THAN
150
RIVET DIAMETE2. Fu: 400 MPa, Fy=248 MPa.

THICK

P = 16mm
-> P P16/200
=
-

2.5(25)] (0.3)(4003 SHEAR


-

#
16
+

(150 1.5(25)]
-

(0.5 (400) TENSILE

KN)
#4
! in,
50mm
I ANs.

↑- 100mm -> P
-50mm
COCHRAINESCORRECTION FORMULA
I
140,88,00, came
E PITCH
S: HORIZONAL
THE
OR SPAUNC

OF
RIVETS.

①FIND VALUE
SAFE
THE OF P SO THAT THE
ALLOWABLE 9 = GAGE THE
OR VERTICAL SPACING

SHEARING STRESS OF 0.3 FU IN RIVETS IS NOT EXCEEDE. OF RIVETS.

SOLUTION:

0 HOLE =
ORIVET + 3 22+3 25mm
= =

4b2nS 4(22)(6) (0.3)(400):1ki/


*x
4 = =

② FIND

PIF BEARING STRESS IS Fy.
1.35

P Dt n SB
=
E

P22((b)(6)
=
(248):kN)
·
Ist CASE

③ FIND
THE
SAFE VALUE P
OF CONSIDERING BLOCK SHEAR. 2ndCASE

USING ALLOWABLE STRESSES OF 0.3FU FOR SHEARB0.5Fn 3rd CASE

FOR TENSION.

MAX AREA NET REQUIRES BYTHE NSCP REQUIREMENT


↑St CASE 2ND CASE
300mm
200
L / 0.85
/ / AREA net (max) =

Ag -

Anet: t/w-nonoles [] +

100

DOUBLE SHEAR
PAne+S
=
SHER

P 16/200 -2.5(25)) (2) (0.3) (400)
=

P((300
= -

3(25))(2)(0.3)(400) + 16(100 -1(253] (0.5)(400)


↳ TEVSIE
14kN 18kN/
PROBLEM:SOLE FOR SAFEST VALUE OF D. RIVETE BRACKETCONNECTION
C 300mm
=

Farayonin

nest.
p45kN
=

·o
P 400mm


- MOST STRESSED RIVE
I
250 R* ↑R
I ↳ I
250 R* M ↑R
I I
RY ↑R
200 200

Anet=t /w-noholes 44)


+ M Pe =

RP
=

I
ABCD
Anet=12(400-425) +
ta t SHEARING
& STRESS DUE
TO ANAL LOAD ONLY

#
4021.875mm2
as
A

lot isi
R RIVET
=
CAPACITY OF THE MOST

STRESSED RIVET.

SS: SHEARING STRESS

⑧Esteson
ABD

-scasti R
t
p:Anet ST
E,
**
*
moststEse RIVE

4 3980.14(0.6(48)]
AR =
=

92.25kN/ y
X
CENTROID

Exty2=POLAR MOMENT
OF INETA

RIVES FROM CENTROID


By:DISTANCES
& OF
③ MAXIMUM SHEARING STRESS
① FIND
THE SHEARING STRESS To
DUE

SCOMBINEDAXALI BENDING STRESS) ANAL LOAD ONLY.

R ASS
I

I (20) 15.87MPal
FOR AVERAL
a) CONCENTRATES LOD

I
=

F 1,000- (20)"S

↑4/n
b) ②
FORADHORION
CONCENTARES LO FIND
THESHEARING STRESS DUE
TO

↑Es MOMENT ONLY.

+In Ex2ty2 6(200)


"
(250)"
=
+4

6) Exty2 490,000
ase
·Get
tatron-
FORINCINONCEVRARS
i
CO

:
=

pity
#1 gas,


yc 500(5) 7.7
Fx =
i
=

PyIn
=

PROBLEM: (2007
Fy
(800) 5.2
i
=
-

C 300mm
=

p45kN
=

③ FIND
THE MAX SHEARING STRESS DUE
TO

BOTH BENDING.
AXAL
&

⑰ xy 1(Fy
- MOST STRESSED RIVE

250
I
R* ↑R
R =

4) +

I ↳ I
R* ↑R
↑1:4R=1562+/5510.2+)
250 M
I I
RY ↑R
200 200

R14,720.9GN-RIVE CAPACITY
M Pe
=

&LORNE (max)
RP
=

=
I R ASS

14,720.96 =
I 1203 6MPa)