Resident Engineer
RESPONSE ACE
INFRASTRUCTURE DEVELOPMENT
AUTHORITYPUNJAB (IDAP) OBSERVATION /
RECOMMENDATION FORM
Secretariat Office Building & Allied Works in Multan
Point No. 01
Comments:
Unsafe Condition (Blocked access and Egress)
Site Access and Egress/Emergency Escape Route was found blocked. The emergency
escape routes mustbe kept free of any obstacle.
IDAP Observation
Comments: The Access and Egress has been cleared and instructions have been given to
keep it clear for the Staff and Workers Movement
Supervision Consultant
Page 1 of 9
Secretariat Office Building & Allied Works in Multan
Point No. 02
Comments:
Unsafe Condition (Poor Housekeeping)
Construction Scrap (Shuttering Material, Wooden Ply, Scrap Steel etc.) was found at
various places of site.Housekeeping should be done to avoid any Fall/Slip & Trip
hazard.
IDAP Observation
Comments: The materials, pointed in the report, has been lifted and stacked properly.
After Stacking they have been properly barricaded.
Supervision Consultant
Page 2 of 9
Secretariat Office Building & Allied Works in Multan
Point No. 03
Comments:
Unsafe Act (Non-Compliance of PPEs)
Non-compliance of PPEs (mandatory and job specific) i-e Violation of clause SP-23, Sub-
clause c (PPERequirements) & j (Working at Height) of Conditions of Contract (CoC) was
observed at site. MandatoryPPEs include Helmet, Vest and Shoes. Job Specific PPE include
IDAP Observation
Comments: The workers were newly inducted at the site. The workers have been now given HSE
induction and Mandatory PPEs.
Supervision Consultant
Page 3 of 9
Secretariat Office Building & Allied Works in Multan
Point No. 03
Comments:
Unsafe Act (Non-Compliance of PPEs)
Non-compliance of PPEs (mandatory and job specific) i-e Violation of clause SP-23, Sub-
clause c (PPERequirements) & j (Working at Height) of Conditions of Contract (CoC) was
observed at site. MandatoryPPEs include Helmet, Vest and Shoes. Job Specific PPE include
Fall protection System (Safety Harness)
IDAP Observation
Comments: The workers have been provided Refresher Training and Safety Harness. The Last
Supervision Consultant
Page 4 of 9
Secretariat Office Building & Allied Works in Multan
Point No. 04
Comments:
Unsafe Condition (Unprotected Openings and Work Areas)
Unprotected openings were observed on 2nd and 3rd Floors of Main Building. Hard
Barricade and HazardCommunication (Pictogram) is required to avoid fall hazard. Material
Lift areas and Area under any deshuttering activity should be kept clean and protected with
physical barriers.
IDAP Observation
Page 5 of 9
Secretariat Office Building & Allied Works in Multan
Point No. 4
Comments:
Unsafe Condition (Unprotected Openings and Work Areas)
Unprotected openings were observed on 2nd and 3rd Floors of Main Building. Hard
Barricade and HazardCommunication (Pictogram) is required to avoid fall hazard. Material
IDAP Observation
Lift areas and Area under any deshuttering activity should be kept clean and protected with
physical barriers.
Comments: The unprotected platforms and areas have been cleared. All the shuttering material
that were posing Fall hazard have been cleared and workers have been instructed to avoid this
situation in the future
Supervision Consultant
Page 6 of 9
Secretariat Office Building & Allied Works in Multan
Point No. 4
Comments:
Unsafe Condition (Unprotected Openings and Work Areas)
Unprotected openings were observed on 2nd and 3rd Floors of Main Building. Hard
Barricade and HazardCommunication (Pictogram) is required to avoid fall hazard. Material
Lift areas and Area under any deshuttering activity should be kept clean and protected with
physical barriers.
IDAP Observation
Comments: On each floor, the lift has been provided with proper and safe platform
Supervision Consultant
Page 7 of 9
Secretariat Office Building & Allied Works in Multan
Point No. 5
Comments: The activity has been completed. Wooden planks have been removed. The
Shuttering and Scaffolding team have been instructed to tied wooden planks for the future
activities
Supervision Consultant
Page 8 of 9
Secretariat Office Building & Allied Works in Multan
Point No. 06
Comments:
IDAP Observation
Comments: The water accumulation has been removed and the shuttering material are now
properly stacked and barricaded
Supervision Consultant
Page 9 of 9