Riyadh City South Phase 5 – Infrastructure and Streetscape – C418

NEAR MISS REPORT


Project / :
C - 418
A near miss is any event that has the potential to cause personal injury (Major Division
or Minor) any loss of productivity, any environmental damage or any property
damage. Location : Area 61

DETAILS OF NEAR MISS (to be completed by concerned employee)

Date 08.11.2020 Time : 12.00 PM


Exact Location : Area 61 Storm water Manhole.

Description of
Near Miss :
It has been observed that on Monday 8th November, 2020 at area 61, a SBD foreman and
his crew were involved in a concrete pouring activity for the manhole construction for
storm water line with use of concrete bucket and mobile crane, while doing so concrete
got struck in the bucket and concrete was not coming from the bucket chute. Meanwhile
an employee unsafely climbed on top of the concrete bucket at the height aprox.2 meter
(working on the hanging load) without any fall protection / secure platform in place for
releasing the blocked concrete from the bucket.
Potential result
of Near Miss : Fall from height
Investigation carried out with involved crew advised concern foreman to use alternate
Immediate safe method to be used for release the blockage from concrete bucket /or change the
Actions taken : concrete bucket.

1.
WITNESSES Name: Mr.Yousuf (Foreman) ID No: Contact No: 0567739571
(if any)
Mr. Kazali (HSEO) 39280 0558233646

INVESTIGATION FINDINGS & FOLLOW-UP ACTIONS (to be completed by HSE Division)


Risk Potential: Minor Major
 Poor planning and arrangements by Engineer/supervisor and Lack of awareness of
Findings:
job hazards
 Failed to flow working at height procedures

 Safe Work Platform to be provide as per OSHAD-SF CoP-23.0 Working at


Recommendations: Height Requirements

 TBT shall be conducted to Mr. Raji foreman and his crew regarding the near miss/safe working at
height procedure to avoid such violation in future.

Reported by (concerned employee) Reported to HSE Report Closed Out by


Name/Job Name/Job Name/Job
Title: Rajesh.B Title: Karthikeyan Title: Venkadesh PR

Sign: Sign: Sign:

Date: 17.11.2020 Date: 17.11.2020 Date: 17.11.2020

SBD HSEMS Revision: 00


HSEMSP03/F03 Date : June 2020
Project C-418 Page : Page 1 of 2
Riyadh City South Phase 5 – Infrastructure and Streetscape – C418

UNSAFE PRACTICE ON 8TH NOVEMBER 2020 AT AREA 61

SBD HSEMS Revision: 00


HSEMSP03/F03 Date : June 2020
Project C-418 Page : Page 2 of 2