GENERAL NOTES:

1. DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTS,


SERVICES ENGINEERS AND APPROVED SUB-CONTRACTORS DRAWINGS AND THE
SPECIFICATION. ANY DESCRIPANCY SHALL BE BROUGHT TO CLIENT'S NOTICE.

2. ALL DIMENSIONS ARE IN mm UNLESS NOTED OTHERWISE.


3. DRAWING IS NOT TO BE SCALED, THE CONTRACTOR IS TO WORK TO FIGURED
DIMENSIONS ONLY.
4. UNLESS SHOWN OTHERWISE ALL MEMBERS ARE PLACED SYMMETRICALLY ABOUT
2 3 4 B1
5 6 345 GRID LINES.
7662 7662 7662 7662
5. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE TO BE VERIFIED ON SITE BY THE
175 3125 969 4431 769 1693 1507 3200 3125 CONTRACTOR PRIOR TO COMMENCEMENT OF THE WORK.
6. CONTRACTOR TO PREPARE SHOP DRAWINGS AND TO BE SUBMITTED FOR
ENGINEER'S REVIEW & APPROVAL.

125
1 F4 F4 F4 F4 F4 F4 F4 F4

345 C1B C1B C1B C1B C1B C1B C1B C1B

8000 7662

(TYP.)
750
A B

4295
G 750
REFER DWG. GC-ST-09 (TYP.)
677 1200 1200 1200 1200
823
6500
F1 F1 F1 F1

1095

1095

1095

1095

220
F2 F2

645

645
P1 P1 P1 P1
520

2150 F5
A
P3 P2A

45°
Ø30
2150

40 1845
A B

6520
10000

1020
980
45°
45°

1000

975
P3A
D P2 D
B
F3 F3
F F
Ø30
00
00
32
Ø
400

6520

12 0
95
Ø1

CONSTRUCTION DRAWINGS
120°

P2
P3A
12

C
1000

1025
F3 F3
8500

980 1020


12 0
95
Ø1
FOUNDATION HAS BEEN REVISED AS PER PEB

6520
2 17-05-2023 HM
H H REACTIONS
120°

D
1 07-05-2023 REVISED AS PER PEB REACTIONS AND SITE LEVEL HM
12
0° 1845
C
0 09-04-2023 ISSUED FOR CONSTRUCTION HM

Revisions Date Description Checked


1180

6500 P3 P2A
CLIENT:
G D
645

645
1095

1095

1095

1095
P1A P1A P1A

220
F2 P4 F2
F1 F1 F1 F1
823
677 1293 1200 1200 1200

C D

CONSULTANT:

- STRUCTURAL G.A PLAN AT FOUNDATION LEVEL ISMAIL KHONJI ASSOCIATES


CONSULTING ENGINEERS Telephone:
Note:
+973 17714463 - Fax: +973 17712292 Email:
1. BASE PLATE AND ANCHOR BOLTS DETAILS SHOULD ikabah@batelco.com.bh PO Box 72, Bahrain
REFER TO THE PEB INPUT DRAWINGS.

MEP CONSULTANT:

SCHEDULE OF FOOTINGS

REINFORCEMENTS
SIZE GRADE "A" MEP CONSULTANT
MARK THICKNESS DESIGN & SUPERVISION
(L x W) BOTTOM REBARS TOP REBARS License No. EP.BN/177
Tel. 17382264 : Fax. 17382267
T12-150 PO Box 18236, Kingdom of Bahrain
F1 500 2400 x 2400 T16-150 www.sjmmep.com

F2 500 1500 x 1500 T16-150 T12-150


PROJECT:

F3 450 2000 x 2000 T16-150 T12-150

F4 300 1500 x 1500 T16-150 - PROPOSED FILLING STATION


F5 AS PER PLAN 18000 x 6500 T20-150 T16-150 at RAS ZUWAYED

DRAWING TITLE:

GENERAL NOTES: STRUCTURAL G.A PLAN AT


1. DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTS, 7. ALL BLOCK WORK AND CONCRETE SURFACE IN CONTACT WITH GROUND TO BE 15. THE FOUNDATION IS DESIGNED FOR A SAFE BEARING CAPACITY OF 150 kN/m².
SERVICES ENGINEERS AND APPROVED SUB-CONTRACTORS DRAWINGS AND GIVEN CONCRETE PROTECTION AS PER THE SPECIFICATION. ALL BLOCK WORK
BELOW GROUND LEVEL SHALL BE FILLED WITH CONCRETE C45 AND PROVIDED
ALL FOUNDATION SHALL REST ON HARD STRATA. TOP HARD STRATA OF 50mm
SHALL BE REMOVED PRIOR TO PLACING BLINDING. THE ROCKS IF ANY SHALL BE
21. REINFORCEMENT SHALL BE CHECKED BY THE SUPERVISING OFFICER BEFORE
CONCRETING.
FOUNDATION LEVEL
THE SPECIFICATION. ANY DESCRIPANCY SHALL BE BROUGHT TO CLIENT'S NOTICE.
T12-400c/c BARS ANCHORED 500mm TO FOOTING BELOW. CAREFULLY EXAMINED FOR THE PRESENCE OF VOIDS. IF ENCOUTERED, THESE 22. FOR EVERY STAGE OF CONCRETING A WRITTEN APPROVAL SHALL BE TAKEN FROM GENERAL NOTES ON PEB SUPPLIER:
2. LEVEL SHOWN ARE TO BE TOP OF STRUCTURAL MEMBER AND ARE GIVEN IN METER SHALL BE THOROUGHLY CLEANED OUT AND IN FILLED WITH MASS CONCRETE. THE SUPERVISING OFFICER BEFORE CONCRETING. ( SUB CONTRACTOR TO MAIN CONTRACTOR)
8. BLOCKS ARE TO ATTAIN A MINIMUM STRENGTH OF 7 N/mm² WHEN TESTED
RELATED TO LOCAL DATUM. ACCORDING TO THE REQUIREMENT OF BS 2028 APPENDIX "F" MORTAR SHALL BE
THIS IS TO BE CONFIRMED BY CONTRACTOR ON SITE.
23. ALL MATERIALS WORKMANSHIP AND ALL OTHER CONDITIONS TO COMPLY WITH BS HM JM
1:5 WITH PLASTICISER UNLESS OTHERWISE SPECIFIED. 16. BARS MARKED 'T' TO BE HIGH TENSILE DEFORMED BAR TYPE - 2 CONFORMING TO 8110, AND THE MINISTRY OF WORKS. 1. DESIGN CODE - EURO CODE - 3 /AISC
3. ALL DIMENSIONS ARE IN mm UNLESS NOTED OTHERWISE. BS 4449.
4. DRAWING IS NOT TO BE SCALED, THE CONTRACTOR IS TO WORK TO FIGURED 9. POLYTHENE SHALL BE SINGLE SHEET MEMBRANE WITH MIN. THICKNESS OF 1000 24. PRIOR TO EXCAVATIONS, CONTRACTOR SHALL CHECK FOR ANY LIVE ELECTRICAL 2. LOADING DETAILS:
17. FABRIC REINFORCEMENT TO BE BS 4483 WITH MIN. LAP OF 200mm IN EACH
DIMENSIONS ONLY. GUAGE MICRON END LAPS SHALL BE 200mm MIN.DOUBLE LAPPED AND SEALED
UNLESS OTHERWISE SPECIFIED.
DIRECTION UNLESS OTHERWISE SPECIFIED .
CABLES IF FOUND SHALL BE RELOCATED. ALL EXCAVATIONS ADJACENT TO THE
EXISTING FOUNDATIONS SHALL BE DONE CAREFULLY AND ENSURE THAT IT IS NOT A. DEAD LOAD - ROOF SHEETING , PURLIN WEIGHT, IF ANY HM TMS
5. UNLESS SHOWN OTHERWISE ALL MEMBERS ARE PLACED SYMMETRICALLY ABOUT DISTURBED. HVAC EQUIPMENT WEIGHT ON ROOF
GRID LINES. 10. THE CONTRACTOR'S PROPOSED ARRANGEMENTS OF CONSTRUCTION JOINTS ARE 18. APPROVED P.C. CONCRETE/ PLASTIC SPACERS ONLY SHALL BE USED FOR ALL R . C .
WORKS. 25. THE FOUNDATION DETAILS SHOWN IN THE DRAWING IS TENTATIVE ONLY THE SIZE B. LIVE LOAD - 0.60kN/M² ON ROOF (BS6399-PART3)
SUBJECT TO APPROVAL BY THE S.O. UNLESS NOTED OTHERWISE.
6. UNLESS OTHERWISE SPECIFIED CONCRETE MIX SHALL BE AS FOLLOWS: 11. CEMENT FOR SUB-STRUCTURES SHALL BE SULPHATE RESISTING CEMENT. FOR SUPER 19. CLEAR COVER TO REINFORCEMENT TO BE AS FOLLOWS: OF FOUNDATION SHALL BE FINALIZED AFTER RECEIVING THE LOADING DETAILS
FROM THE PEB SUPPLIER.
C. WIND LOAD - 152 km/h TMS
CHARAC. STRUCTURES, OPC CEMENT UNLESS OTHERWISE SPECIFIED. SLAB THICKENING - 75mm
LOCATION MIX. MIN.CEMENT MAX. FREE 26. ALL THE EXISTING SERVICES SHALL NOT BE DISTURBED DURING CONSTRUCTION AND 3. THE CALCULATIONS AND DRAWINGS ARE TO BE SUBMITTED FOR
STRENGTH 12. DISTRIBUTION STEEL NOT CALLED UP ON THE DRAWING SHALL BE T10-300c/c.
& USAGE DESIGNATION CONTENT W/C RATIO RAFT, FOOTINGS & COLUMNS - 75mm. RELOCATION IF ANY, SERVICES ARE REQUIRED, IT SHALL BE UNDERTAKEN BY THE REVIEW & APPROVAL
N/mm²
13. WHERE REQUIRED BAR BENDING SCHEDULE SHALL BE PREPARED BY THE BELOW GROUND CONTRACTOR. DEC
CONC.
BLINDING
20/20/SRC 260 kg/m³ 0.60 20 CONTRACTOR AND SHALL BE SUBMITTED TO THE CLIENT FOR RECORD. GROUND SLAB - INTERNAL - 50mm TO ALL STEEL
AS SHOWN 2 2021
BELOW
GROUND
45/20/SRC 370 kg/m³ 0.42 45
14. THE CONTRACTOR SHALL PROCURE SITE TOPOGRAPHICAL SURVEY AND FORWARD
TO ENGINEER FOR REVIEW. GROUND BEAMS
EXTERNAL - 50mm TO ALL STEEL
- 75mm.
27. ALL SCAFOLDINGS USED DURING CONSTRUCTION SHALL COMPLY WITH RELEVANT
BS STANDARDS. *
ABOVE BEAMS & COLUMNS - 50mm TO ALL STEEL.
GROUND
35/20/OPC 350 kg/m³ 0.45 35
20. ALL INTERFACES TO BE SCRABBLED PRIOR TO CONCRETING. c GC-ST-01 1315