DCC2073

CONTRACT AND
ESTIMATING
CHAPTER 7
QUANTITY MEASUREMENT
(PILING WORKS)
WHAT IS PILING?
• Piling is a type of ground
treatment
• Driving a pile into the ground
below ground level.
• Used to transfer the building load
to the ground.
• Length Of Pile : 3metres,
6metres, 9metres and 12metres.
• Depth Of Piling : depending
on the condition of ground.
• First pile : “starter pile” (initial
pile) will be driving in until it
can’t be driven in anymore.
Good control of the drive ability and
execution in general thanks to integrity
measurements.

Illustration of Piling Works on site


Driving
Pile
Cut off top
Load bearing test
PILE DRIVING
A B C D
2500 4000 2500
100mm thick Reinforced
concrete slab grade 20
P1 P1 P1 P1
1 with Fabric
** ** ** ** Original reinforcement BRC A6 &
Ground Damp proof membrane.
3000 Level
P1 P2 P3 P1
2 ** ** ** **
* **
3000
P1 300mm thick
P2 P1
3 ** ** Hardcore filling
**
* with aggregate
to making up
3000 level
P1 P1
4 ** **

PLAN
SECTION
Notes :
Total penetration depth should be 14m
200mm x 200mm PC Pile
SCHEDULE OF PILES CAP

Location Type of Pile Caps


P1 P2 P3
A/1-2 2 - -
B/1-3 2 1
C/1-4 2 1 1
D/1-4 4
Total 10 2 1
Project : ____________________________ Page: _1/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)

TAKING OFF LIST

1. Bringing in & removing plant Item


2. Maintaining plant on site Item
3. Initial piles No
4. Driven depth m
5. Pile extension No
6. Extension pile not exceeding 3.00 long m
7. Extension pile exceeding 3.00 long m
8. Cut off pile heads No
9. Prepare pile heads No
10. Preliminary load tests Item
11. Second load tests Item
12. Third load tests Item
Project : ____________________________ Page: _2/11_

Amount
Dimension Description Unit Qty Rate
RM cent

Query List

No. Query Answer/ Remarks


Assumption

1 What is the supply length 6.00m


for initial pile?
Project : ____________________________ Page: _3/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)

Bringing to and
removing from site all
plant required for this Item
section of the site.
Item

Maintaining on site all


plant required for this
section of the site Item

Item
Project : ____________________________ Page: _4/11_
Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)
Supply 200mm x 200mm
Precast concrete piles “UCP”
6.00m long complete with
200mm x 200mm x 1.25kg.
Mild steel head and 200mm
x 200mm x 10kg m.s shoe.
obtainable from UCP
Item
Manufacturing (M) Sdn. Bhd.
2 P1
10
20

3 P2
2
6

4 P3
1
4
30
Project : ____________________________ Page: _5/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)
Driven, 200mm x 200mm
Precast concrete piles m 420

2
10
P1
14.00
280.00
3
2
14.00 P2
84.00

4
1
14.00 P3
56.00
420.00
Project : ____________________________ Page: _6/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)

Precast concrete pile


extensions No. 60

2
10
2
P1
40
3
2 P2
2
12

4
1
2 P3
8
60
Project : ____________________________ Page: _7/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)
Supply 200mm x 200mm
Precast concrete extension
piles “UCP” not exceeding m 90
3.00m length
2
10 P1
3.00
60.00

3
2 P2
3.00
18.00

4
1 P3
3.00
12.00
90.00
Project : ____________________________ Page: _8/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)
Supply 200mm x 200mm
Precast concrete extension
piles “UCP” exceeding m 180
3.00m length
2
10
P1
5.00
120.00
3
2
5.00 P2
36.00

4
1
5.00 P3
24.00
180.00
Project : ____________________________ Page: _9/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)

Cut off top of piles to


required level No. 30

2 P1
10
20

3 P2
2
6

4 P3
1
4
30
Project : ____________________________ Page: _10/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)
Prepare concrete pile
heads and reinforcement
No. 30
for capping

2 P1
10
20

3 P2
2
6

4 P3
1
4
30
Project : ____________________________ Page: _11/11_

Amount
Dimension Description Unit Qty Rate
RM cent
PRECAST CONCRETE PILE
(All provisional)

Allow for 1 no testing on a


group of 4 nos. 200mm x
200mm piles by kentledges
to a total load of 360 Item
tonnes (twice their combined
working load)
Item
Ditto; 1 no testing on a group
of 3 nos. 200mm x 200mm
piles by kentledges to a total Item
load of 270 tonnes; ditto
Item
Ditto; 1 no testing on a group
of 2 nos. 200mm x 200mm
piles by kentledges to a total Item
load of 180 tonnes; ditto
Item
SCHEDULE OF PRECAST CONCRETE PILES

Type No. of No. of Total Penetration No. of Driven No. of Extn. Extn. Cut off &
of pile pile no.of depth Initial depth pile n.e exc. Preparation
pile cap point pile piles extn. 3.00m 3.00m top of pile
cap /pile points long long
cap
P1 10 2 20 14.00 20 20/14.00 20/2 20/3.00 20/6.00 20
P2 2 3 6 14.00 6 6/14.00 6/2 6/3.00 6/6.00 6
P3 1 4 4 14.00 4 4/14.00 4/2 4/3.00 4/6.00 4
Total 30 30 420.00 60 9.00 180.00 30