You are on page 1of 1

PANEL AIR CONDITIONERS EXHAUST AIR AND MAKEUP AIR HEAT LOAD CALCULATION

Detail of Air-conditioners for Panel in SMD Heat Load


Room conditions 25 ± 3 C˚ 65% RH 77 F◦ RH: 65% Outside Air (21290 CFM) Heat Load during

Condenser Outlet Sensible Heat Load Being Added in Hall Dry June RH: 22.5 WET August RH:56.5
Machine A/C CFM
Temperature Through A/Cs (DB:107 WB:74.8F) (DB:96.8 WB:82.9)
GDX-1 Top panel AC 41 1235 105.8 38413.44 BTU/hr
GDX-2 Top panel AC 36 1040 96.8 22239.36 BTU/hr
GDX-3 Top panel AC 35 1050 95 20412 BTU/hr
GDX-4 Top panel AC 37 1140 98.6 26593.92 BTU/hr
GDX-5 Top panel AC 37 895 98.6 20878.56 BTU/hr
GDX-6 Top panel AC 39 1250 102.2 34020 BTU/hr
GDX-7 Top panel AC 36 1310 96.8 28013.04 BTU/hr
Loga-1 Vertical Panel AC 55 2240 131 130636.8 BTU/hr
Loga-2 Vertical Panel AC 60 1340 140 91173.6 BTU/hr
Loga-3 Vertical Panel AC 36 620 96.8 13258.08 BTU/hr
Loga-5 Vertical Panel AC 53 1480 127.4 80559.36 BTU/hr
Loga-8 Vertical Panel AC 38 850 100.4 21481.2 BTU/hr
Protos-4 Floor standing Panel A/C 42 1820 107.6 60147.36 BTU/hr
Protos-6 Floor standing Panel A/C 43 1940 109.4 67884.48 BTU/hr
GDX-4 Oil Cooler 42 840 107.6 27760.32 BTU/hr
GDX-5 Oil Cooler 43 830 109.4 29043.36 BTU/hr
GDX-6 Oil Cooler 43 765 109.4 26768.88 BTU/hr
GDX-7 Oil Cooler 43 645 109.4 48344.04 BTU/hr
21290 787627.8 BTU/hr
Totals 65.63565 Tons 44.8 TONS 115.9 TONS

NOTE: SYCHROMETRIC REPORT IS ENCLOSED

A Rauf Khan
Transcold

You might also like