Professional Documents
Culture Documents
R210LC-7 6-4
R210LC-7 6-4
YES
Short circuit or Check and repair
poor connection wire harness or
Check resistance between CN-50 - between CN-50-
YES at EPPR valve CN-75 CN-75
SPEC : 17.5±1Ω(20°
C) Defective EPPR Replace
See TEST 2 NO
valve
Wiring diagram
21076MS51
6-40
2) TEST PROCEDURE
SPEC : 17.5±1Ω(20°
C)
(1) Test 2 : Check resistance at connector
CN-75.
① Starting key OFF. CN-75
② Disconnect connector CN-75 from EPPR
valve at main hydraulic pump.
③ Check resistance between 2 lines as
figure.
Multimeter
(290-7) 6-38(2)
EPPR VALVE
Multimeter
(290-7) 6-38(3)
(290-7) 6-39(1)
6-41
2. ENGINE SPEED IS SLOW AT ALL MODE
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE
Cause Remedy
Good
If test 7 is good,
Check tachometer check TEST 1~4
YES work properly or
not by changing YES
Misalignment Clean speed
the mode. between speed sensor and
Is resistance
YES Is resistance See TEST 6 sensor and fly adjust
between CN-50 between CN-51
No good wheel See : 5-20page
(12) - (23) (25) - (26)
SPEC : 0.2~0.4kΩ ⓐ
SPEC : 1~2Ω
See TEST 7 NO
See TEST 5
Check cable
between accel Defective accel Replace accel
NO
actuator and actuator or short actuator or
injection pump. circuit or poor harness
connection assembly
between CN-50-
CN-76
26 11 2
CN-51 CN-2 CD-17
29076MS03
6-42
2) TEST PROCEDURE SPEC : 1~2Ω
(1) Test 5 : Check resistance between CN-50 Y R G
(12)-(23). CPU
① Starting key OFF. CONTROLLER
② Disconnect connector CN-50 from CPU CN-50
controller. CN-51
CN-50
12 1
23 13
36 25
Multimeter 29076MS04
Unit : rpm
(2) Test 6 : Check tachometer(Work properly
Spec Remark
or not)
① Start engine. H 2150±50 Check rpm after cancel the
② Check tachometer reading. S 2050±50 Auto decel mode.
6-43
(3) Test 7 : Check resistance between CN-51
SPEC : 0.2~0.4kΩ
(25) and CN-51(26).
Y R G
CN-51 12 1
24 13
36 26 25
Multimeter
29076MS05
Engine flywheel
Multimeter
(210-7) 6-42(1)
6-44
3. ENGINE STALL
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE
Cause Remedy
YES
Not enough engine Contact cummins
YES Check pressure power engine dealer
at EPPR Valve
Defective EPPR Replace
SPEC:5~20kgf/cm2 NO
See TEST 4 valve
Check electric
current at EPPR YES
valve Short circuit or Check and repair
poor connection wire harness
SPEC : 200~450mA
See TEST 3 between
Check resistance CN-50 - CN-2 or
NO at EPPR valve
CN-50 - CN-75
SPEC : 17.5±1Ω(20°
C)
See TEST 2 Defective EPPR Replace
NO
valve
Wiring diagram
21076MS51
6-45
2) TEST PROCEDURE SPEC : 200~450mA
(1) Test 3 : Check electric current at EPPR
valve at S-mode
CN-75
① Install multimeter as figure.
② Start engine.
③ Set the accel dial at "10"(max)
④ Set S-mode with 2050±50rpm.
⑤ Check electric current.
EPPR VALVE
Multimeter
6-44(1) 290-7
6-44(2) 290-7
6-46
4. MALFUNCTION OF CLUSTER OR MODE SELECTION SYSTEM
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE
Cause Remedy
YES
No power supply to Check fuse
See if all lamps the CPU controller
YES
off in the CPU
controller case YES
Y R G CPU failure Replace
Y R G
See if Co : Er
NO
on the cluster
NO Y R G
ⓐ
NO
OK
Check connection Cluster failure Replace
between CN-51
ⓐ (29) - CN-5(10) or
CN-51(30) - CN-
5(11) No connection Check and repair
NO
KEY OFF
Wiring diagram
21076MS06
6-47
5. SLOW ACTION OF ENGINE SPEED CHANGE WHEN CHANGE THE MODE
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE
Cause Remedy
YES
Slow action of Check and repair
engine speed
control due to
interference
Check interference
between YES
connecting rod and Defective CPU Replace
Check voltage
accel actuator between CN-5(20)- controller
YES
(21) and check
resistance between
CN-51(20)-(22)
Check resistance Defective accel Replace
NO
between CN-50 SPEC : (20)-(21) : 5±1V actuator
NO (20)-(22) : 0.1~0.9kΩ
(12)-(23) See TEST 12
SPEC : 1~2Ω
See TEST 11 Defective accel Replace
NO
actuator
Wiring diagram
ACCEL ACTUATOR
CPU CONTROLLER
1 P+
2
2 SIG
1 3
12 3 P-
4 NC
5
5 M+ M 6
23 6 M-
CN-76 ACCEL DIAL
CN-50
C -
20 5 B S
21 7 A +
22 CN-142
CN-9
TACHO SENSOR
25 12 1
rp
m
26 11 2
CN-51 CN-2 CD-17
29076MS03
6-48
2) TEST PROCEDURE SPEC : 1~2Ω
(1) Test 11 : Check resistance. Y R G
(23) as figure.
CN-50
12 1
23 13
36 25
Multimeter
29076MS04
6-49
(2) Test 12 : Check voltage and resistance. SPEC : 0.1~0.9kΩ
① Check resistance between CN-51(20)- Y R G
(22). CPU
CONTROLLER
- Starting key OFF.
CN-51
- Disconnect connector CN-51 from CPU
CN-50
controller.
- Check resistance value with multimeter
as figure.
CN-51
12 1
24 22 20 13
36 25
Multimeter
29076MS08
CN-51
12 1
24 21 20 13
36 25
Multimeter
29076MS09
6-50
6. AUTO DECEL SYSTEM DOES NOT WORK
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE
Cause Remedy
YES
Defective CPU Replace
controller
NO
Check resistance Short circuit or Replace or repair
between CN-51
poor connection
(1)-GND and
CN-51(13)-GND vetween CN-51(1),
(13)- pressure
SPEC :
Actuator operating : switches
4~5V
Actuator stop :0~1V
See TEST 13 Defective auto Replace
NO
See TEST 14 decel pressure
switch
Wiring diagram
CD-7
13 1
Pa
2
CN-51 CD-6
29076MS10
6-51
2) TEST PROCEDURE SPEC : Actuator stop : 4~5V
(1) Test 13 : Check voltage at CN-51(1) and Actuator operating : 0~1V
ground. Y R G
copper 36 25
CN-51 12 1
24 13
36 25
Ground
Multimeter
29076MS11
6-52
7. MALFUNCTION OF WARMING UP
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE
Cause Remedy
YES
Defective cluster or Repair or Replace
Check resistance CPU controller or
YES
between CN-51 CD8(Sensor)
(31) - CD-8(2)
SPEC : Below10Ω NO Poor connection Repair
Check resistance KEY OFF
between CN-
between CN -51
(33) - CD-8(1) 51(31) - CD-8(1)
SPEC : Below 10Ω
KEY OFF
NO
Poor connection Repair
between CN-
51(33) - CD-8(2)
Wiring diagram
CONTROLLER
WATER TEMPERATURE SENDER
33 6 1 o
C
31 5 2
CD-8
CN-51 CN-3
210N76ES03
6-53
8. MALFUNCTION OF POWER MAX
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1 ) INSPECTION PROCEDURE
Cause Remedy
YES Check resistance
between CN-88 Defective power Repair or replace
(1) - (2) max. solenoid valve
YES
Resistance
between CN-51 SPEC: 15-30Ω
(2)-GND normal? See TEST 15
Wiring diagram
CPU CONTROLLER
POWER MAX SOLENOID
3 2
1
CN-50
1 CN-88
2 2
FUSE
CN-51 CN-4 NO.23
POWER MAX SWITCH
2
CS-29
29076MS13
6-54
2) TEST PROCEDURE SPEC : Key ON : 24±1V
Key OFF : 0V
(1) Test 15: Check voltage between connector Resistance : 15~30Ω
CN-88 - GND.
① Start key ON.
② Disconnect connector CN-88 from power Power max. switch
max solenoid valve.
③ Check voltage as figure.
LH RCV-lever
CN-88
CN-88
Power max.
solenoid valve
Multimeter
29076MS14
CN-50
CN-51
12 2
24 13
36 25
Ground
Multimeter
29076MS15
6-55