INSTALLATION CHECKLIST FOR SW-SEPC-ICL-BAT-021, Rev: 00
BATTERY
PROJECT NAME & LOCATION: SUNSEAP 168MW SOLAR PHOTOVOLTAIC POWER PLANT
IN NINH THUAN PROVINCE, VIETNAM
NINH THUAN PROVINCE, VIETNAM

Drawing / Specification No.:


Site Location / Area: Inspection Date:

OBSERVATIONS
SR. NO. CHECKS REMARKS
YES NO
1 Check for proper ventilation of battery room
2 Ensure the availability of gloves, apron, water
3 Visual & physical inspection of all cells
Check the installation of battery rack as per approved
4 shop drawing
Before installation of battery on rack ensure for the
5 proepr tightness of battery stand on foundation
6 Check all cell nos. are marked and are visible
Check for identification of polarity and
7 interconnection of cells
Check for tightness of bus bar interconnection links
8 of all cells
Check the specific gravity of electrolyte before filling
9
Check that the electrolyte is filled up to the required
10 level
11 Check the cell voltage
12 Check that the Vaseline is applied on the terminals
13 Check that the vent plugs are in position
Record Cell voltage, temperature and specific gravity
14

COMMENTS/REMARKS:

Checked By S&W: Witnessed By CLIENT:


(Date & Sign) (Date & Sign)