Overall Observation Plans

1. For Khungri Substation: -


a. Levelling and Grading Layout showing retaining walls.
b. Concept of retaining wall
c. General Layout Drawing
d. Concept for achieving plinth level of foundations 200 mm
above top of gravel
e. Architectural Drawing of Guard Room
f. Architectural Drawing of Staff Quarters

2. For Ghorahi Substation: -


a. Layout of panels inside Existing Control Room Building
b. Layout of cable trenches inside Existing Control Room Building
c. Layout of cable trench at existing road crossing.
d. Interfaces with existing systems.
e. Fencing between existing 132 kV Substation and Bay Extension
area
Overall Discussion Plans
1. Status of Survey of Transmission line route
2. Status of Soil investigation of Transmission line route
3. Deployment of EHS officer, Environment Officer, and Biodiversity Officer
4. Environment monitoring (testing of Air Quality, Water Quality and Noise
level) at substation sites.
5. Submission Biodiversity Management Plan
6. Establishment of GRC (Grievance Redress Committee) of the Contractor
7. Mobilization of Construction Team at site
8. Any other agenda to be proposed by NEA and KEC