The approved design and installation plan for the facade stone dry cladding on the tower is as

follows: Design: The design of the facade stone dry cladding was prepared in accordance with
the requirements of the BCSA and NBSA. The design took into account the existing structure of
the tower, the site conditions, and the intended use of the building. The design included the
placement of the cladding panels, the installation of the reinforcing steel, and the connection of
the cladding to the existing structure of the tower. Installation Plan: The installation plan for the
facade stone dry cladding was developed in conjunction with the owner and the architect. The
plan included the following stages: a. Preparation of the site: The site was cleared of debris and
obstructions, and the ground was leveled and stabilized. b. Procurement of materials: The
required materials for the cladding were procured and delivered to the site. c. Installation of the
reinforcing steel: The reinforcing steel was installed in accordance with the approved design and
installation plan. d. Installation of the cladding: The cladding panels were installed on the tower,
following the approved design and installation plan. e. Connection of the cladding to the existing
structure: The cladding was connected to the existing structure of the tower, using the
appropriate fastening systems and connections. f. Final inspection: The cladding was inspected
to ensure that it met the required standards and specifications. g. Commissioning: The cladding
was commissioned and tested to ensure that it functioned properly and was safe for use.
Schedule: The schedule for the installation of the facade stone dry cladding was developed in
conjunction with the owner and the architect. The schedule included the following milestones: a.
Preparation of the site: 1 week b. Procurement of materials: 2 weeks c. Installation of the
reinforcing steel: 3 weeks d. Installation of the cladding: 4 weeks e. Connection of the cladding to
the existing structure: 2 weeks f. Final inspection: 1 week g. Commissioning: 1 week Personnel:
The personnel required for the installation of the facade stone dry cladding were recruited from
reputable contracting companies in the region. The personnel were trained and certified to carry
out the installation work in accordance with the approved design and installation plan.
Equipment: The equipment required for the installation of the facade stone dry cladding included
the following: a. Excavators and bulldozers for clearing the site and moving materials. b. Cranes
and winches for lifting and positioning the cladding panels. c. Drills and saws for cutting and
shaping the cladding panels. d. Fasteners and connectors for connecting the cladding to the
existing structure. e. Testing and inspection equipment for checking the functionality and safety
of the cladding. By following the approved design and installation plan, the facade stone dry
cladding on the tower was successfully installed, and the building was completed within the
required timeframe and budget.