You are on page 1of 38

Title : - Template for Hydraulic Design of Head

Project Name :-
Client :-
Consultant:-
Design Date:-
Design By:-
Name of the Canal

Description of Color-Codes

Input Value from Canal Design template


Filled Value
Calculated Value
Output
Computation control
Paramters to be Iterated

Offtake Canal Name:


Design Input Data
Offtaking Chainage:
Supply canal Symbol
Full Supply Discharge of Canal Q u/s
Bed Level of Canal CBLU/S
Full Supply Level of Canal FSL d/s
Energy level TELU/S
Bed width of Canal BW u/s
Full Supply Depth of Canal FSD u/s
Velocity Vu/s
Offtaking canal
Full supply discharge of Canal Q d/s
Bed Level of Canal CBL d/s
Full Supply Level of Canal FSL d/s
Energy level TELd/s
Bed width of Canal BW d/s
Full Supply Depth of Canal FSD d/s
Side slope of canal SS
Free Board F.B.
Velocity Vd/s
Available Fall in FSL z
Gravitational acceleration g
Lacey's silt factor f

Hydraulic Design
Selection of Pipe
Circular Pipe
Pipe roughness coefficient n
Assume maximum full pipe flow velocity Vmax
Min. Pipe diameter required, D
Use a pipe diameter D
Number of barrel N
Full pipe area Ap
Velocity of full pipe flow Vp
Hydraulic Radius, R Rp
Friction Slope Sf
Take Friction Slope Sf

Critical bed Slope, SC


Angle subtended by cord on water surface teta
Critical cross sectional area Ac
Top water surface inside culvert at critical flow Tc
Froude Number, Fr2 Fr2
Calculated yc/D
Iterate (trial value Until Fr=1) yc/D
Critical depth of flow yc
Critical velocity Vc
Wetted perimeter at critical Pc
Hydraulic radius at critical Rc
Critical Slope, SC Sc
Culvert Length L
Culvert Invert level at Inlet ILinlet
Culvert Invert level at Outlet ILoutlet
Culvert Slope Provided ( S1> Sc) S1

Gate and Required ConditionS For Free Flow


Sill height at crest level (provided) p
Crest level CL
U/S Depth of flow above offtake crest level, H H
Difference in Energy Level (U/S - D/S), z z
Calculated headloss, z (should be lessthan 1/3H) z
Difference in Calculated and available Headloss
Crest width b
Velocity v
Froude Number, Fr > 1 (underflow) Fr>1
Gate opening,w w
U/S depth (u/s FSL -CL = y1 ) y1
D/S depth (d/s FSL -CL= y3) y3
Ratio y1/w
Ratio y3/w
Discharge coefficient CD
Calculated discharge Q
Difference in discharge (Free flow) Q
Energy Level using calculated headloss TEL
Difference in Calculated and available Energy z
Drop In Bed level in offtaking canal, Dz
New CBL in Offtaking canal CBLnew

Control Criteria
Is It Free underflow?
Maximum tail water level y3 for free flow y3
Design tail water level y3 y3
Design Gate opening for 100%Q (For Free underflow) Q
Minimum head loss, zmin 100%Q (free underflow) Q
Minimum head loss, zmin 25%Q (free underflow) Q

Specific Energy Compution


Valid only if the flow is free underflow
Section 1
Angle subtended by cord on water surface teta
Cross sectional area A
Top water surface inside culvert T
Wetted perimeter P
Froude Number, Fr
Calculated d/D
Iterate (trial value Until Fr=1) d/D
Depth of flow d1
Hydraulic Radius R
Mean flow velocity in culvert V
Mean flow velocity in culvert V
Velocity head at Inlet V2/2g
Transition head losses at Inlet zin
Specific energy at beginning of culvert, E S1=Esc ES1
Discharge Q
Section 2
Specific energy at end of sloping culvert, E S2 = d2+hv2 ES2
Specific energy at end of sloping culvert, E S2=Es2+Y1-hf1 ES2
Angle subtended by cord on water surface teta
Cross sectional area A
Top water surface inside culvert T
Wetted perimeter P
Froude Number, Fr
Calculated d/D
Iterate (trial value Until Fr=1) d/D
Friction loss between 1 and 2 hf1
Depth of flow d2
Hydraulic radius R
Mean velocity V2
velocity head hv2
friction slope between section 1 and 2 Sf2
Elevation change between Inlet and Outlet of culvert
Discharge Q
Water Level at Culvert Outlet FSLoutlet
Water level in Offtaking Canal FSLd/s
Total Head Loss z
Drop in water level outlet structure DFSL
Check for Outlet Control condition
Head water depth above Culvert Invert HW
Total Head Loss z
(dc+D)/2
ho
y1=HW
Entrance Submergence Criteria (Y1/D < 1.2-1.5) y1/D

Level and Length of Dowonstream Floor


Specific discharge, q q
U/S Energy Level TELu/s
D/S Energy Level TELd/s
Critical depth of flow yc
Conjugate depth from Using Blench curve or Swamee C. P. regression
formula
The Conjugate Depth of flow at the u/s of jump D1
The Conjugate Depth of flow at the u/s of jump D2
X
Y
Y for z<1.0
Diffrence in Y
Z
Froude number at the Conjugate Depth D2 Fr2
The Energy at the Conjugate Depth D2 E2
D/S floor level CL
D/S canal bed level
Selected Downstream floor level is DFL
Drop in canal bed level (required) DBL
Dowonstream floor length = 5 x (D2-D1) L3

Cut off Depth


U/S cut off
Maximum Scour depth consideration
Minimum Scour depth consideration
Selected scour depth d1 d1
D/S cut off
Maximum Scour depth consideration
Minimum Scour depth consideration,
Selected scour depth, d2 d2

Total floor Length and Exit gradient :


Maximum static head, H H
Depth of d/s cut off , d2 d2
Exit Gradient, GE GE
Total Floor length, (Iterative value) L
1/sqrt(Lambda) λ
Lambda λ
Lambda λ
diffence in lambda
Hence requirement of total floor length L
Minimum downstream horizontal floor L3
D/S floor length criteria requirement
Minimum d/s horizontal floor length provided L3
Length of crest at the gate post (1 to 2.0)
L2
L2
U/S glacis length with 1H:1V
Upstream floor length L1
Total Floor length provided L

Pressure Calculation
(i) At D/S cut off wall
Total floor length (b) L
Depth of D/S cut off wall (d) d2
1/sqrt(Lambda)
Lambda λ
fC fC
fD = Cos-1((l - 1)/l) fD
fE = Cos-1((l - 2)/l) fE
Assuming floor thickness at D/S end as
Correction for floor thickness at U/S end
fE (Corrected) =

( ii ) At U/S cut off wall


Depth of D/S cut off wall d1
1/sqrt(Lambda)
Lambda λ
fD = Cos-1((l - 1)/l) fC
fE = Cos-1((l - 2)/l) fD
fC1 = 100 - fE fC1
fD1 = 100 - fD fD1
fE1 fE1
Assuming floor thickness at D/S end as
Correction for floor thickness at U/S end
fC1 (Corrected) = fC1

Floor Thickness
(i) D/S Floor
At Toe of glacis
Percent Uplift pressure at toe of glacies
Pressure head (Static)
Pressure head (Dynamic)
Governing Head
Specific Gravity of water
Specific Gravity of material (2.1 for stone masonry, 2.4 for mass
S
concret, 2.5 for reinforced concret)
Floor thickness required at toe of glacis
Provide minimum as t1
At a distance (downstream of toe of glacis)
Percent Uplift pressure this distance
Pressure head (Static)
Floor thickness required at toe of glacis
Provide minimum as t2
At a distance (downstream of toe of glacis)
Percent Uplift pressure this distance
Pressure head (Static)
Floor thickness required at toe of glacis
Provide minimum as t3
(ii) U/S Floor
At the crest level (kept similar to thickness at toe of glacis)
U/S floor thickness (usually kept 0.3 to 0.5 m)
Provide thickness of upstream floor

Protection Works
U/S Protection :
Depth of scour 'R' = 1.35{q2/f}1/3 R
Anticipated scour (1.5R) R
Upstream FSL fsL U/S
Upstream scour level SL U/S
Min scour depth 'D' below u.s floor D
(a) Block protection(C.C. blocks)
Length of block protection (shall be provided minimum equal to 'D'
Lucb
in length). Gravel filter provided underneath.
Width of row of block protection (parallel to the flow direction)
Wr
usually 0.4 to 0.6m
Number of row (parallel to the direction of flow) n
Thickness of the block protection (usually equals to the width of the of tb
Thickness of the gravel filter tf
(b) Launching apron
Loose apron consisting of either boulders of not less than 40 kg or
wire boulder should be provided so as to ensure a minimum thickness
of 1 m in launched position t
Thickness of launching apron (should be equals to the thickness of
CC block and filter) tLu
Volume of launching apron required per unit length of canal (2.25D) V
Length required
Provide launching apron Lu

D/S Protection :
Anticipated scour (2R) R
Downstream FSL FSL D/S
Downstream scour level SL D/S
Min scour depth 'd' below d.s floor D
(a) Block protection(C.C. blocks)
Length of block protection (shall be provided minimum equal to '2d' in Ldcb
Width of row of block protection (parallel to the flow direction)
Wr
usually 0.4 to 0.6m
Number of row (parallel to the direction of flow) n
Thickness of the block protection (usually equals to the width of the of tb
Thickness of the gravel filter tf
(b) Launching apron
Loose apron consisting of either boulders of not less than 40 kg or
wire boulder should be provided so as to ensure a minimum thickness
of 1 m in launched position
Thickness of launching apron (should be equals to the thickness of
t
CC block and filter)
Volume of launching apron required per unit length of canal (2.25d) V
Length required
Provide launching apron Ld

Data Summery

Structure Name
Offtake Name:
Design Paramters
Offtaking Chainage:
Symbol
U/S Full Supply Discharge of Canal Q u/s
U/S bed level of Canal CBLU/S
U/S Full supply level of Canal FSL U/S
U/S Bed width of Canal BW u/s
U/S Full Supply Depth of Canal FSD u/s
D/S Full supply discharge of Canal Q d/s
D/S Bed level of Canal CBL d/s
D/S Full supply level of Canal FSL d/s
D/S Bed width of Canal BW d/s
Full Supply Depth of Canal FSD d/s
Side slope of canal SS
Free Board F.B.
Pipe diameter D
Number of barrel N
D/S floor level (Cistern Level) CL
U/S Cut Off d1
D/S Cut Off d2
Dowonstream floor length ( Cistern Length) L3
Length of crest at the gate post (2H:1V) L2
Upstream floor length (1H:1V) L1
Total Floor length provided L
(i) D/S Floor thickness
Floor thickness required at toe of glacis t1
At a distance (downstream of toe of glacis)
t2
At a distance (downstream of toe of glacis)
t3
(i) U/S Floor thickness
U/S Block protection(C.C. blocks) Lucb
U/SLaunching apron Lu
D/S Block protection(C.C. blocks) Ldcb
D/SLaunching apron Ld
Hydraulic Design of Head Regulator Structure With Pipe Culvert ( Inlet control)

ake Canal Name: HR 07


taking Chainage:
Unit
m3/s
m.a.s.l. 467.250
m.a.s.l. 469.900
m.a.s.l. 469.93
m 10.53
m 2.65
m/s 0.81

m3/s 1.49
m.a.s.l. 468.82
m.a.s.l. 469.70
m 469.72
m 2.78
m 0.88
m:m 1.50
m 0.30
m/s 0.55
m 0.20
m/s2 9.81
1.00

0.013
3.00
m 0.80
m 0.75
2.00
m2 0.44
m/s 1.69
m 0.19
m:m 0.004
1 in 222

deg 229.17
m2 0.34
m 0.69
1.00
yc/D 0.71
yc/D 0.71
m 0.54
m2 2.20
m 1.50
m 0.23
m:m 0.006
m 14.00
m.a.s.l. 469.00
m.a.s.l. 468.90
m:m 0.007

m 1.75
m.a.s.l. 469.00
m 0.90
m 0.32
m 0.25
m -0.07
m 1.50
m/s 2.21
1.36
m 0.45
m 0.90
m 0.70
2.00
1.56
0.530
m /s
3
1.51
m3/s 0.02
m.a.s.l. 469.69
m 0.10
m 0.10
m.a.s.l. 468.72

- Free Flow
m 469.600
m 469.600
m3/s 0.450
m3/s 0.190
m /s
3
0.510

degree 228.92
m 2
0.34
m 0.69
m 1.50
1.000
1
0.71
m 0.53
m 0.23
m/s 2.197
m/s 2.191
m 0.25
m 0.12
m 0.78
m3/s 1.49

m 0.78
m 0.78
degree 229
m2 0
m 1
m 2
1.000
1
0.71
m 0
m 1
m 0
m/s 2
m 0.250
m:m 0.006
m 0.098
m3/s 1.496
m.a.s.l. 469.43
m.a.s.l. 469.60
m 0.30
m 0.168

m 1.082
m 0.300
m 0.645
m 0.880
1.082
1.443

m3/s/m 0.50
m.a.s.l. 469.933
m.a.s.l. 469.615
m 0.300

m 0.12
m 0.58
0.41
1.94
1.94
0.00
1.000
0.360
m 0.619
m.a.s.l 469.020
468.820
m.a.s.l 468.800
m 0.00
m 2.300

0.20
0.90
m 0.90

0.40
1.00
m 1.00

m 1.13
m 1.0
0.17
m 10.02
0.46
4.69
5.54
0.85
m 10.10
m 6.80
OK!
m 6.80
m 1.0
m 1.75
m 0.47
m 10.10

m 10.10
m 1.00
0.46
4.69
8.00
21.18
30.57
0.30
-2.82
27.75

m 0.9
0.42
5.79
19.00
27.30
72.70
81.00
100.00
0.30
2.77
75.47

59.88
0.68
0.35
Static!
1.000

2.400

0.49
m 0.50
3.40
43.82
0.50
0.36
m 0.40
6.80
27.76
0.32
0.23
m 0.30

0.50

m 0.50

m 0.86
m 1.29
m.a.s.l. 469.900
m.a.s.l. 468.61
m 1.00

m 1.00

m 0.60
2
m 0.6
m 0.6

m 0.60

m3 2.03
3.38
m 3.40
m 1.72
m.a.s.l. 469.700
m.a.s.l. 467.98
m 0.90

m 1.80

m 0.60
3.0
m 0.60
m 0.60

m 1.20

m3 2.25
1.88
m 1.90

tructure Name CR 2
Offtake Name: PC 2&0
aking Chainage: 0
Unit
m3/s 0.000
m.a.s.l. 467.250
m.a.s.l. 469.900
m 10.53
m 2.65
m3/s 1.490
m.a.s.l. 468.820
m.a.s.l. 469.700
m 2.78
m 0.88
m:m 1.50
m 0.30
m 0.75
2
m.a.s.l 468.80
m 0.90
m 1.00
m 6.80
m 1.00
m 0.5
m 10.1

m 0.50
m 3.40
m 0.40
m 6.80
m 0.30
m 0.50
m 1.00
m 3.40
m 1.80
m 1.90
Title : - Template for Hydraulic Design of Hea
Project Name :-
Client :-
Consultant:-
Design Date:-
Design By:-
Name of the Canal

Description of Color-Codes

Input Value from Canal Design template


Filled Value
Calculated Value
Output
Computation control
Paramters to be Iterated

Offtake Canal Name:


Design Input Data
Offtaking Chainage:
Supply canal Symbol
Full Supply Discharge of Canal Q u/s
Bed Level of Canal CBLU/S
Full Supply Level of Canal FSL d/s
Energy level TELU/S
Bed width of Canal BW u/s
Full Supply Depth of Canal FSD u/s
Velocity Vu/s
Offtaking canal
Full supply discharge of Canal Q d/s
Bed Level of Canal CBL d/s
Full Supply Level of Canal FSL d/s
Energy level TELd/s
Bed width of Canal BW d/s
Full Supply Depth of Canal FSD d/s
Side slope of canal SS
Free Board F.B.
Velocity Vd/s
Available Fall in FSL z
Gravitational acceleration g
Lacey's silt factor f

Hydraulic Design
Selection of Pipe
Box Culvert
Pipe roughness coefficient, (0.012-0.015) n
Assume maximum full pipe flow velocity, V Vmax
Width of Culvert B
Depth of Culvert D
Number of Barrel N
Full Culvert area Ac
Velocity of full pipe flow Vp
Hydraulic Radius Rp
Friction Slope Sf
Take Friction Slope Sf
Critical Slope, Sc
Critical depth of flow yc
Critical velocity Vc
Critical Area Ac
Wetted perimeter at critical Pc
Hydraulic radius at critical Rc
Critical Slope Sc
Culvert Length L
Culvert Invert level at Inlet CILinlet
Culvert Invert level at Outlet CILoutlet
Culvert Slope Provided S1

Gate and Required ConditionS For Free Flow


Sill height at crest level p
Crest level CL
U/S Depth of flow above offtake crest level, H H
Difference in Energy Level (U/S - D/S), z z
Calculated headloss, z (should be lessthan 1/3H) z
Difference in Calculated and available Headloss
Crest width b
Velocity v
Froude Number, Fr > 1 (underflow) Fr>1
Gate opening w
U/S depth (u/s FSL -CL = y1 ) y1
D/S depth (d/s FSL -CL= y3) y3
Ratio y1/w
Ratio y3/w
Discharge coefficient CD
Calculated discharge, Q Q
Difference in discharge (Free flow) Q
Energy Level using calculated headloss TEL
Difference in Calculated and available Energy
Drop In Bed level in offtaking canal, Dz
New CBL in Offtaking canal

Control Criteria
Is It Free underflow?
Maximum tail water level y3 for free flow y3
Design tail water level y3 y3
Design Gate opening for 100%Q (For Free underflow) Q
Minimum head loss, zmin 100%Q (free underflow) Q
Minimum head loss, zmin 25%Q (free underflow) Q

Specific Energy Compution


Section 1
Trial value for depth of flow d1
Flow Area A
Wetted perimeter P
Hydraulic Radius R
Mean flow velocity in culvert V1
Mean flow velocity in culvert V2
Velocity head at Inlet V2/2g
Transition head losses at Inlet zin
Specific energy at beginning of culvert, E S1= Esc ES1
Section 2
Specific energy at end of sloping culvert, E S2 = d2+hv2 ES2
Specific energy at end of sloping culvert, E S2=Es2+Y1-hf1 ES2
Friction loss between 1 and 2 hf1
Trial value for depth of flow d2
Hydraulic radius R
Mean velocity V2
velocity head hv2
friction slope between section 1 and 2 Sf2
Elevation change between Inlet and Outlet of culvert
Water Level at Culvert Outlet FSLoutlet
Water level in Offtaking Canal FSLd/s
Total Head Loss z
Drop in bed level outlet structure DBL
Check for Outlet Control condition
Head water depth above Culvert Invert HW
Total Head Loss z
(dc+D)/2
ho
y1=HW
Entrance Submergence Criteria (Y1/D < 1.2-1.5) y1/D

Level and Length of Dowonstream Floor


Specific discharge q
U/S Energy Level TELu/s
D/S Energy Level TELd/s
Critical depth of flow yc

Conjugate depth from Using Blench curve or Swamee C. P. regression formula


The Conjugate Depth of flow at the u/s of jump D1
The Conjugate Depth of flow at the u/s of jump D2
X
Y
Y for z<1.0
Diffrence in Y
Z
Froude number at the Conjugate Depth D2 Fr2
The Energy at the Conjugate Depth D2 E2
D/S floor level (Cistern Level) CL
D/S canal bed level
Selected D/S floor level (Cistern Level) DFL
Drop in canal bed level (required) DBL
Dowonstream floor length = 5 x (D2-D1) L3

Cut off Depth


U/S cut off
Maximum Scour depth consideration
Minimum Scour depth consideration
Selected scour depth (average value) d1
D/S cut off
Maximum Scour depth consideration
Minimum Scour depth consideration,
Selected scour depth, d2 d2
Total Floor Length and Exit Gradient :
Maximum static head, H H
Depth of d/s cut off , d2 d2
Exit Gradient, GE GE
Total Floor length, (Iterative value) L
1/sqrt(Lambda) λ
Lambda λ
Lambda λ
diffence in lambda
Hence requirement of total floor length L
Minimum downstream horizontal floor L3
D/S floor length criteria requirement
Minimum d/s horizontal floor length provided L3
Length of crest at the gate post (1 to 2.0) L2
U/S glacis length with 1H:1V
Upstream floor length L1
Total Floor length provided L

Pressure Calculation
(i) At D/S cut off wall
Total floor length L
Depth of D/S cut off wall d2
1/sqrt(Lambda)
Lambda λ
fC fC
fD = Cos-1((l - 1)/l) fD
fE = Cos-1((l - 2)/l) fE
Assuming floor thickness at D/S end as
Correction for floor thickness at U/S end
fE (Corrected) =

( ii ) At U/S cut off wall


Depth of D/S cut off wall d1
1/sqrt(Lambda)
Lambda λ
fD = Cos ((l - 1)/l)
-1
fC
fE = Cos-1((l - 2)/l) fD
fC1 = 100 - fE fC1
fD1 = 100 - fD fD1
fE1 fE1
Assuming floor thickness at D/S end as
Correction for floor thickness at U/S end
fC1 (Corrected) = fC1

Floor Thickness
(i) D/S Floor
At Toe of glacis
Percent Uplift pressure at toe of glacies
Pressure head (Static)
Pressure head (Dynamic)
Governing Head
Specific Gravity of water
Specific Gravity of material (2.1 for stone masonry, 2.4 for mass concret,
S
2.5 for reinforced concret)
Floor thickness required at toe of glacis
Provide minimum as t1
At a distance (downstream of toe of glacis)
Percent Uplift pressure this distance
Pressure head (Static)
Floor thickness required at toe of glacis
Provide minimum as t2
At a distance (downstream of toe of glacis)
Percent Uplift pressure this distance
Pressure head (Static)
Floor thickness required at toe of glacis
Provide minimum as t3
(ii) U/S FLOOR
At the crest level (kept similar to thickness at toe of glacis)
U/S floor thickness (usually kept 0.3 to 0.5 m)
Provide thickness of upstream floor

Protection Works
U/S Protection :
Depth of scour 'R' = 1.35{q2/f}1/3 R
Anticipated scour (1.5R) R
Upstream Full Supply Level fsL U/S
Upstream scour level SL U/S
Min scour depth 'D' below u.s floor D
(a) Block protection(C.C. blocks)
Length of block protection (shall be provided minimum equal to 'D' in
Lucb
length). Gravel filter provided underneath.
Width of row of block protection (parallel to the flow direction) usually
Wr
0.4 to 0.6m
Number of row (parallel to the direction of flow) n
Thickness of the block protection (usually equals to the width of the of bl tb
Thickness of the gravel filter tf
(b) Launching apron
Loose apron consisting of either boulders of not less than 40 kg or wire
boulder should be provided so as to ensure a minimum thickness of 1 m
in launched position
Thickness of launching apron (should be equals to the thickness of CC
block and filter) tLu
Volume of launching apron required per unit length of canal (2.25D) V
Length required Lu
Provide launching apron Lu

D/S Protection :
Anticipated scour (2R) R
Downstream Full Supply Level FSL D/S
Downstream scour level SL D/S
Min scour depth 'd' below d.s floor D
(a) Block protection(C.C. blocks)
Length of block protection (shall be provided minimum equal to '2d' in len Ldcb
Width of row of block protection (parallel to the flow direction) usually
Wr
0.4 to 0.6m
Number of row (parallel to the direction of flow) n
Thickness of the block protection (usually equals to the width of the of bl tb
Thickness of the gravel filter tf
(b) Launching apron
Loose apron consisting of either boulders of not less than 40 kg or wire
boulder should be provided so as to ensure a minimum thickness of 1 m
in launched position
Thickness of launching apron (should be equals to the thickness of CC
t
block and filter)
Volume of launching apron required per unit length of canal (2.25d) V
Length required
Provide launching apron Ld

Data Summery

Structure Name
Offtake Name:
Design Paramters
Offtaking Chainage:
Symbol
U/S Full Supply Discharge of Canal Q u/s
U/S bed level of Canal CBLU/S
U/S Full supply level of Canal FSL U/S
U/S Bed width of Canal BW u/s
U/S Full Supply Depth of Canal FSD u/s
D/S Full supply discharge of Canal Q d/s
D/S Bed level of Canal CBL d/s
D/S Full supply level of Canal FSL d/s
D/S Bed width of Canal BW d/s
Full Supply Depth of Canal FSD d/s
Side slope of canal SS
Free Board F.B.
Width of Culvert B
Depthof Culvert D
Number of Barrel N
D/S floor level (Cistern Level) CL
U/S Cut Off d1
D/S Cut Off d2
Dowonstream floor length ( Cistern Length) L3
Length of crest at the gate post (2H:1V) L2
Upstream floor length (1H:1V) L1
Total Floor length provided L
(i) D/S Floor thickness
Floor thickness required at toe of glacis t1
At a distance (downstream of toe of glacis)
t2
At a distance (downstream of toe of glacis)
t3
(i) U/S Floor thickness
U/S Block protection(C.C. blocks) Lucb
U/SLaunching apron Lu
D/S Block protection(C.C. blocks) Ldcb
D/SLaunching apron Ld
mplate for Hydraulic Design of Head Regulator Structure With Box Culvert ( Intlet control)

Offtake Canal Name: HR 07


Offtaking Chainage:
Unit
m3/s 105.000
m.a.s.l. 1406.803
m.a.s.l. 1409.133
m.a.s.l. 1409.16
m 13.53
m 2.33
m/s 0.76

m3/s 105.00
m.a.s.l. 1406.80
m.a.s.l. 1409.13
m 1409.59
m 8.00
m 2.33
m:m 0.00
m 0.80
m/s 3.00
m 0.00
m/s 2
9.81
1.00

0.020
m/s 3.00
m 4.00
m 3.00
2.00
m2 12.00
m/s 4.38
m 1.20
m:m 0.006
m:m 166.20

m 2.60
m/s 5.05
m2 10.40
m 9.20
m 1.14
m:m 0.009
m 8.00
m.a.s.l. 1408.50
m.a.s.l. 1408.49
m:m 0.002

m 1.7
m.a.s.l. 1408.50
m 0.63
m 85.771
m 85.770
m -0.001
m 8.00
m/s 41.02
29.890
m 0.32
m 0.63
m 0.63
- 1.97
- 1.97
0.53
m3/s 4.78
m /s
3
-100.220
m 1323.40
m 86.200
m 86.20
1320.60

- Free Flow
m 1377.100
m 1322.933
m3/s 0.320
m /s
3
0.140
m3/s 0.360

m 0.53
m2 2.12
m 5.06
m 0.42
m/s 2.60
m/s 24.76
m 0.34
m 0.17
m 0.87

m 50.20
m -5.47
m 6.35
m 0.42
m 0.35
m/s 31.25
m 49.78
m 1.58
m 0.02
m.a.s.l. 1408.91
m.a.s.l. 1322.93
m 86.20
m -85.97

m 88.984
m 86.200
m 2.800
m 2.800
88.984
29.661

m3/s/m 13.13
m.a.s.l. 1409.162
m.a.s.l. 1323.392
m 2.600

m 4.73
m 1.24
1.82
0.48
4.40
-3.92
33.154
3.024
m 6.925
m.a.s.l 1316.040
1406.803
m.a.s.l 1316.000
m 90.80
m -17.50

8.80
0.90
m 0.90

8.80
1.00
m 1.00
m 93.16
m 1.0
0.17
m 15.75
0.01
27777.78
8.39
-27769.39
m 15.80
m 10.60
OK!
m 10.60
m 1.0
m 1.70
m 2.45
m 15.80

m 15.80
m 1.00
0.01
31658.07
8.00
0.25
0.36
0.60
-0.06
0.29

m 0.9
0.01
39084.04
0.23
0.32
99.68
99.77
100.00
0.60
0.06
99.74

67.02
62.44
-1.75
Static!
1.000

2.400

44.60
m 44.60
5.30
33.66
31.36
22.40
m 0.40
10.60
0.30
0.28
0.20
m 0.30

44.60

0.50

m 7.52
m 11.28
m.a.s.l. 1409.162
m.a.s.l. 1397.88
m 1.00

m 1.00

m 0.60
2
m 0.6
m 0.6

m 0.60

m3 2.03
m 3.38
m 3.40

m 15.04
m.a.s.l. 1409.133
m.a.s.l. 1394.09
m 12.80

m 25.60

m 0.60
43.0
m 0.60
m 0.60

m 1.20

m3 2.25
1.88
m 19.20

Structure Name CR 2
Offtake Name: PC 2&0
Offtaking Chainage:
Unit
m3/s 105.000
m.a.s.l. 1406.803
m.a.s.l. 1409.133
m 13.53
m 2.33
m3/s 105.000
m.a.s.l. 1406.803
m.a.s.l. 1409.133
m 8.00
m 2.33
m:m 0.00
m 0.80
m 4.00
m 3.00
2.00
m.a.s.l 1316.00
m 0.90
m 1.00
m 10.60
m 1.00
m 2.4
m 15.8

m 44.60
m 5.30
m 0.40
m 10.60
m 0.30
m 0.50
m 1.00
m 3.40
m 25.60
m 19.20
Schematic Drawing Head Regulating Structure ( with inlet c

U/S C.C. Block protection with a Gravel filter

TBL U/S Gate Groove

FSL U/S

U/S Launching Apron CL `

``
ILinlet
CBL U/S

tLu t
d1

Lu Ldcb L1 L2
Structure ( with inlet control culvert)

D/S C.C. Block protection

Gate Groove
TBL D/S

FSL D/S

FSLoutlet
D

ILoutlet ``
FL D/S

``
t3
t1 t2
`
Ldcb

d2
`
L3
Pipe Length
D/S C.C. Block protection with a Gravel filter

TBL D/S

FSL D/S

D/S Launching Apron

CBL D/S
tLd

Ld
Standard Diameters of pipe culvert Source ERA
Sr. No.
mm
1 300
2 375
3 450
4 425
5 600
6 675
7 750
8 825
9 900
10 1050
11 1200
12 1350
13 1500
14 1800
15 2100
16 2400
17 2700
18 3000
19 3300
20 3500
21 3900
22 4200
23 4500

You might also like