Professional Documents
Culture Documents
Design Box Culvert at Chiange 57+094m
Design Box Culvert at Chiange 57+094m
468.190
Afflux H.F.L- 465.182 1.39
The head loss through the syphon barrels is computed by Unwin's formula as equal to
(neglecting velocity of approach).
h = (1 + f1 + f2*(L/R))*(V2/(2*g))
So, f2 = 0.00369
h = 0.012 m is Afflux or Loss of Head(HL)
The High flood Level of drain/River is 465.170 m
So, D/S H.F.L = 465.170 m
U/S H.F.L = D/S H.F.L + Afflux = 465.182 m
In the transitions,the side slopes of the section shall be warped from 11/2:1 to vertical.
0.670 m
464.500 m DESIGN OF UNLINED CANAL
16.000 B 16.0000 2.75
0.00024000 m/m D 0.6700 1.30
465.170 m Side Slope 17:45 2:1
0.035 A 11.6178 6.9550
P 18.9963 8.5638
N 0.013 0.013
466.500 m S 7692.308 7692.308
29.741 Cumecs V 0.632 0.763
468.190 m Q 7.3424 5.3067
470.450 m Vo 0.426 0.651
471.200 m CVR 1.484 1.172
14.700 m
2.260 m q 7.708
1.5 a
0.00013 v
0.750 m
0.0225
0.732 m/s
earthen canal
465.170 H.F.L
1.50 m/s
0.542 m
3 m wide and
0.41 m/s
10.20 m
0.72 m3/s/m
1.08 m
1.35 m
463.829 m
0.67 m
1.30 m
463.200 m
2.25 m
1.30 m
= 4.9*dm0.5
= 0.00430279138 m
0.43 cm
= 0.321 m/s
of boulders.
0.01 m
8.9
DESIGN OF DRAIN AQUDUCT (DSY) FOR LBMC AT CH.46+303 M
STABILITY ANALYSIS OF ABUTEMENT
467.000 0.50
466.500 W1 0.50
EW
0.5
W2 1.0
3.000 3.000
W3 EP
GL 464.50
463.500
0.50 463.000 W4
0.50 1.500 0.50 Kagh = 1.798
0.50 3.000
1 STRESS ANALYSIS
3 EARTHQUAKE FORCES
Earthquake co-efficient av = 0.03 ah = 0.06
Z = ∑M / ∑V = 55.283/43.204 = 1.198
e = b/2 - Z =4.1/2-1.28 = 0.302
b/6 = 0.500
e <= b/6 = SAFE
3.60
3.00
2.70
466.90
473.40
4.10
0.33
3.00
0.60
0.5404
30.963
Moments (t-m)
(- ive)
∑M1(-)
3.852
Moments (t-m)
(- ive)
1.406
0.140
0.413
0.439
0.032
0.759
0.176
SM2(-)
3.37
t
t
t-m
Reinforcement detail for two
barrels
dia
Clear wall Fill top slab Wall
span height Height(H) thickness Thickness Bar-S1 16
bar-S2 20
Bottom slab Bar-S5 16
3 2 4.4 0.46 0.25 Bar-S6 16
Bar-S9 16
Bar-S12 20
Top slab Bar-S10 16
Bar-S11 16
Bar-S7 12
face Bar-S8 12
No of barrels 3
spacing
dia (mm) a(m) b(m) length (m)
Bar-S1 16 160 613.82 537.88 1151.70
bar-S2 20 150 1948.64
Bottom
slab Bar-S5 16 320 1583.03
Bar-S6 16 360 516.71
Bar-S9 16 190 517.20 453.22 970.42
Bar-S12 20 160 1827.21
Top slab Bar-S10 16 340 1583.03
Bar-S11 16 340 546.89
c
Exterior
slap Bar-S3 12 170 223.39 469.11
(d)
Bar-S7 12 170 732.70 1233.09
Interior
each Bar-S4 12 300 25.38 740.00 418.80
TOTAL(Kg)
ement detail for two Reinforcement detail fo
barrels barrels
spacing length
(mm) a b (mm)
35718.279
Reinforcement detail for three
barrels
spacing length
dia (mm) a b (mm)