You are on page 1of 9

Europass

Curriculum Vitae

Personal information
First name(s) / Surname(s) BASSAM SHEHADEH
Address(es) Nazira junblat rd, Corniche el Mazraa, Beirut, Lebanon
Telephone(s) Personal: 00961 (0) 1 654455 Mobile: 00961 (0) 3 011287

E-mail bas.shehadeh&hotmail.com / bassam.shehadeh@spectrumlb.com

Nationality Lebanese

Date of birth 22.5.1971

Gender Male

Work experience
With over 25 years in architecture world (As a teacher and project manager), I have extensive
experience in architecture projects (Projects are listed in the attached CV)and I am in charge of
following up design phases in accordance with required space and users programs and coordination
between Architectural, Structural, Mechanical, and Electrical design to provide final controlled
drawing’s for tender documents preparation especially in hospital design.
In addition to Review and evaluate the Contract’s engineering drawings, plans, technical
specifications, and design calculations.
Responsible for the management and technical direction of the Consultant's personnel related to
Design and Supervision works, as well as of any other staff provided for the purpose of performing the
works.
Manage the collection, analysis, verification, checking, and presentation of all data pertinent to the
Design works and compilation of Electro-Mechanical, Civil and Planner/Cost Engineers feedback
reports.
Coordination and assistance to the Client during Contract's duration; Prepare, monitor and maintain
cost estimate and planning schedules. Establish contacts with public authorities and possesses
capability to liaise with the public .
Now, after 25 years, I am seeking new challenges to flex my experience in a fast-paced
environment.” With suitable opportunities matching my experience (senior architect, project manager).
All documents required are request.

Page 1/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu


Surname(s) First name(s) © European Communities, 2003 20060628
a. Beirut Arab University

Date occupation or position held 1997 Onwards

b. Consultancy Works

Dates June 1998 onwards


Occupation or position held Project Manager
Main activities and responsibilities Design Project Manager in charge of preparing project’s conceptual design, detailed design, and
tender documents. Mr. Shehadeh specialty is in the design of Hospitals , Schools , buildings
rehabilitation, restoration, and renovation, also follows up coordination with civil, mechanical, and
electrical designs in conjunction with the historic aspects of buildings as well as reviewing and
evaluating the Contract’s engineering drawings, plans, technical specifications, and design
calculations.
Duties includes Design, coordination with other departments, from inception to final stage, quality
control, prepare shop drawings, prepare as-built drawings, prepare execution drawings, prepare tender
drawings.
Responsible for the management and technical direction of the Consultant's personnel related to
Design works, as well as of any other staff provided for the purpose of performing the works.
Manage the collection, analysis, verification, checking, and presentation of all data pertinent to the
Design works and compilation of Electro-Mechanical, Civil and Planner/Cost Engineers feedback
reports.
Coordination and assistance to the Client during Contract's duration; Prepare, monitor, and maintain
cost estimate and planning schedules. Establish contacts with public authorities and possesses
capability to liaise with the public.

Name and address of employer Spectrum Engineering Consultants s.a.r.l., Tallet El Khayat, Chehab Bldg, P.O.BOX:114/5029 Beirut
– Lebanon, WWW.spectrumlb.com
Tel. +961 (0) 817693 – 309416, Cel. +961 (0)3 201893, Telefax: +961 (0) 1 817035

Page 2/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu


Surname(s) First name(s) © European Communities, 2003 20060628
Projects related to Building Sector:  Concept design for 200 bed General hospital in Basra, Iraq (Ongoing).
 Concept design for 200 Bed General Hospital Juba, South Sudan (Ongoing).
 Detailed engineering Design and Construction Supervision Services of AL JAX MUSEUM –
(Ministry of Culture) – Riyadh.
 Preparation of Tender Documents / Construction drawings for EDL Central Building -Beirut -
Lebanon (Ongoing).
 Detailed engineering design and Construction Supervision OF Residential Bldg. MAS 4 – JUBA –
SUDAN.
 Detailed engineering design and Construction Supervision OF Residential Bldg. MAS 3 – JUBA –
SUDAN.
 Detailed engineering design and Construction Supervision OF Residential Bldg. MAS 1 – JUBA –
SUDAN.
 Detailed engineering Design and Construction Supervision Services of AL FANAA AL AWAL –
(Ministry of Culture) – Riyadh.
 Detailed engineering Design and Construction Supervision Services of JAX Executive offices –
Riyadh.
 Concept design for 100 bed General hospital in Tanzania.
 Detailed engineering Design and Construction Supervision Services of residential building on Lots
214-215 – Cyprus.
 Detailed engineering Design and Construction Supervision Services of residential building on Lots
451-450 – Cyprus.
 Detailed engineering Design and Construction Supervision Services of residential building on Lot
528 – Cyprus.
 Detailed engineering Design and Construction Supervision Services of commercial building
Myanmar.
 Design and Supervision for Rehabilitation of School No. (8) on Lot 597 Zokak El-Blat – Beirut
Owned by Ministry of Education & Higher Education (2019 - On-going)
 Design of New Construction Project of 8 Schools for UNITED NATIONS CHILDREN’S
FUND (UNICEF)
 Detailed engineering Design and Construction Supervision Services (Arezki Private Residence Lot
no. 1770 – Ras Beirut)
 Design and Supervision of the Rehabilitation of 144 Schools in Lebanon and their Infrastructure
financed by the World Bank.
 The Supervision and Design Services for the Construction of ROUMIEH JAIL, Roumieh – Lebanon
(2012 – 2015)
 Design, Supervision and Project Management of RESIDENTIAL CITY IN AL KHADRA EXIT –
Kingdom of Saudi Arabia (2013 – On-going)
 The Consultancy Services for the Design and Supervision of YASMINE TOWERS, Beirut – Lebanon
(2012 – Ongoing).
 Design & Supervision of the COIN RESIDENCE, Lot 4960 – Tallet El-Khayat, Beirut – Lebanon
(2012 – Ongoing).
 The Consultancy Services for the Design of BADARO 5239, Mazraa – Badarob (2013)
 The Consultancy Services for the Design and Tender Documents for PATCHI Chocolate Factory
(2011 – 2012)
 The Consultancy Services for the Design, Supervision, and Project Management of Rotana Staff
Building, Irbil - Kurdistan - North Iraq (2009 – 2011).
 The Consultancy Services for the Design, Supervision, and Project Management for Hill Top
Commercial and Residential Complex in Tallet EL-Khayat, Beirut Lebanon (2011 – Ongoing)
 The Consultancy Services for the Design, Supervision and Construction Management for the
construction of Two Residential Towers 22 floor each plus five basements in Mme Curie Street -
Beirut – Lebanon (NOVA Towers) (2006 – 2010)

Page 3/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu


Surname(s) First name(s) © European Communities, 2003 20060628
Projects related to Public & Governmental  South Sudan to Host 2021 East Africa Community Military Games – (2020 – Ongoing).
Facilities Sector:  "The Consultancy Services for the Design of ARAB INSTITUTE FOR POLICE STUDIES AND
RESEARCH, Riyadh – Kingdom of Saudi Arabia" (1989 – 1990)
 "The Consultancy Services for the Design & Supervision of THE MINISTRY OF MUNICIPALITIES
AND TOURISM-ERBIL" (2013 – Ongoing)
 Detailed engineering Design and Construction Supervision Services of Commercial Building
Myanmar (Ongoing).
 ""The Construction of ROUMIEH PRISON GAS STATION, Roumieh - Lebanon" (2012 – 2014)
 "Detailed Engineering Design & Construction Supervision Services DAIMLER CENTER BAGHDAD,
Baghdad – Iraq" (2012 – 2014)
 "The Consultancy Services for the Design and Supervision of Estate 100 – NOKIA, Erbil – Kurdistan
Region – Iraq" (2011 – Ongoing)
 The Consultancy Services for the Design and Supervision of the Construction of AUDI TERMINAL,
Erbil – Kurdistan Region – Iraq" (2012 – 2013)
 "The Consultancy Services for the Design and Supervision of the Construction of VOLKSWAGEN
TERMINAL, Erbil – Kurdistan Region – Iraq" (2012 – 2013)
 "The Consultancy Services for the Design, Supervision, and Project Management of BANU MALL,
Erbil – Kurdistan Region – Iraq" (2009 – 2012)

Page 4/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu


Surname(s) First name(s) © European Communities, 2003 20060628
Projects related to Offices &  "The Consultancy Services for the Design of AL MUTLAQ Commercial and Administrative Block,
Commercial Sector: Corniche Jeddah, K.S.A." (2007 – 2010)
 "The Consultancy Services for the Design, Supervision, and Project Management of SARA
CENTER, Riyadh – Kingdom of Saudi Arabia" (2005 – 2008)
 "The Consultancy Services for the Design of AL AYAM NEWSPAPER, Manama - Bahrain" (2003)
 "The Consultancy Services for the Design and Supervision and Construction Management for Diar
Commercial and Residential Tower, DIAR COMPLEX, Beirut - Lebanon" (2000 – 2003)

Projects related to Health Sector:  Detailed engineering Design and Construction Supervision Services of 300 Bed Pediatric hospital
(Ongoing).
 Detailed engineering Design and Construction Supervision Services of 60Bed Hospital S.Sudan
(Ongoing).
 The International Committee of the Red Cross
 Rehabilitation of Emergency Room at RHUH Beirut - Lebanon
 Safe Improvements of the Health Care Services for Human Call Center in Ein El Helwe Camp
 Rehabilitation of Emergency Departments– Lebanon (2017 – Ongoing)
- Rafik Hariri University Hospital (Beirut Caza)
- Beirut Governmental Hospital – Quarantine (Beirut Caza)
- Chehar el Gharbi Governmental Hospital – Kabrchmoun (Aley Caza)
- Orange Nassau Governmental Hospital (Tripoli Caza)
- Menyeh Governmental Hospital (Menyeh – Dannieh)
 Rehabilitation of Emergency Departments (BENT JBEIL, NABATIEH, SAIDA, BEIRUT) – Lebanon
(2016 – Ongoing)
 40 Bed General Hospital, Bar Elias, Bekaa – Lebanon (2016 – Ongoing)
 The Consultancy Services for Design, Construction Supervision and Project Management of 500
BEDS GENERAL TEACHING HOSPITAL for NUST in Islamabad – Pakistan (2013 – Ongoing)
Hospital complex consists of 3 major blocks: Main Hospital – Dental Hospital – Service Building.
The design concept of the project was to achieve a perfectly functional hospital with the best
working spaces, function & medical equipment’s.
All departments were well distributed among the hospital floors to attain the most comfortable
circulation between them.
The project consists of six floors and two basement floors of total area: 60,0 sq.m.
 The Consultancy Services for Design, Construction Supervision and Project Management for
Makassed Hospital.
 Construction of 200 Bed Maternity – Pediatric Hospital, Sulaimaniah – Kurdistan Region (2010 –
Ongoing)
Hospital complex consists of 3 major blocks: Main Hospital – Staff Accommodation – Service
Building.
The design concept of the project was to achieve a perfectly functional hospital with the best
working spaces, function & medical equipments.
All departments were well distributed among the hospital floors to attain the most comfortable
circulation between them.
The project consists of six floors and two basement floors of total area: 30,479 sq.m.
 Construction of 200 Bed Emergency Hospital, Sulaimaniah – Kurdistan Region (2010 – Ongoing)
Hospital complex consists of 3 major blocks: Main Hospital – Staff Accommodation – Service
Building.
The design concept of the project was to achieve a perfectly functional hospital with the best
working spaces, function & medical equipments.
All departments were well distributed among the hospital floors to attain the most comfortable
circulation between them.
The project consists of six floors and two basement floors of total area: 37,018 sq.m.
 Construction of 200 Bed Rehabilitation Center, Sulaymaniyah – Kurdistan Region (2010 – Ongoing)
Hospital complex consists of 3 major blocks: Main Hospital – Staff Accommodation – Service
Building.
The design concept of the project was to achieve a perfectly functional hospital with the best
working spaces, function & medical equipments.
All departments were well distributed among the hospital floors to attain the most comfortable
circulation between them.
The project consists of six floors and two basement floors of total area: 37,160 sq.m.
 The Consultancy Services for the Design and Construction Supervision for Orange Nassau Hospital
- North Lebanon (2007 – 2011)
Tripoli Hospital.
 Construction cost: 5,850,000 US$. Total No. of beds is 242. Total Built up Area: 13,500 sq. meters.
The new 5 floors design included the provision of E.R. Depart., OPD, Laboratories, Main Kitchen
and Laundry, Morgue, Prison, Radiology, Pharmacy, Staff accommodation and Administration,
Dialysis, C.S.S.D, I.C.U, C.C.U., Gynecology, Operation Theaters 4nos., Burn’s Unit, Auditorium for
200 persons, Patients’ wards, and related Electro-mechanical Services
Page 5/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu
Surname(s) First name(s) © European Communities, 2003 20060628
 The Consultancy Services for the Design and Supervision of the Construction of the Central
Municipal Laboratory – North Iraq (2005 – 2008).
The project consists of 3 floors, a basement, a ground floor and a first floor. The project contains the
following services: Administration Department (General Director, Administration offices, Accounting
Department an stores), Samples Department (Manager & Secretary, Sample Taking, sample
registration, sample store, cold room and stores), Chemical Department Lab (Manager & Secretary,
Private room, Chemical Lab, Cold room, incinerator and stores), Biological Department (Manager &
Secretary, Room for testing vaccination & serum, sterilization room, biological lab, cold room and
stores), Preliminary testing department (Manager & Secretary, Private room, new medicine lab,
natural plant medicine lab, cold room and stores).
The Supervision for the Rehabilitation of Public Hospitals, Project Financed by the World Bank
(Total Construction Cost: 13,500,000 US$) – Client: CDR (1998 – 2003)
Construction Cost: 13,500,000 US$) – Client: CDR (1998 to 2003)
Some Projects related to Hotels &  The Consultancy Services for the Design, Supervision, and Project Management of ROTANA
Resorts Sector: HOTEL, Erbil – Kurdistan Region – Iraq (2007 – 2011)
 The Consultancy Services for the Design and Project Management of AL MUTLAQ HOTEL, Mecca .


Type of business or sector Engineering Consultants

Construction of Al Adeed New Exit (Saudi Arabia - Qatar)

،"‫ ﻫﻨﺎﻙ ﻣﻨﻔﺬ ﻗﺪﻳﻢ ﻻ ﻳﻌﻤﻞ ﺣﺎﻟﻴﺎ‬.‫ﻳﻘﻊ ﻣﺸﺮﻭﻉ ﻣﻨﻔﺬ ﺍﻟﻌﺪﻳﺪ ﻋﻠﻰ ﺍﻟﺤﺪﻭﺩ ﺑﻴﻦ ﺍﻟﻤﻤﻠﻜﺔ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﺴﻌﻮﺩﻳﺔ ﻭﺩﻭﻟﺔ ﻗﻄﺮ‬
‫ ﻭﻗﺪ ﺗﻢ ﺇﻧﺸﺎﺅﻩ ﻣﻨﺬ ﻓﺘﺮﺓ ﺑﻌﻴﺪﺓ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﻨﻔﺬ ﺁﺧﺮ ﻣﻊ ﺩﻭﻟﺔ ﻗﻄﺮ )ﻣﻨﻔﺬ ﺳﻠﻮﻯ ﺍﻟﺬﻱ ﺗﻢ‬،‫ﻗﺮﻳﺐ ﻣﻦ ﻫﺬﺍ ﺍﻟﻤﻨﻔﺬ‬
‫ ﺇﻥ ﺣﺮﻛﺔ ﺍﻟﻌﺒﻮﺭ ﺑﻴﻦ ﺍﻟﻤﻤﻠﻜﺔ‬.(‫ﺍﺳﺘﻜﻤﺎﻝ ﺍﻟﻤﺒﺎﻧﻲ ﻓﻴﻪ ﻭﺗﺤﺪﻳﺜﻪ ﻣﺆﺧﺮﺍ" ﻭﺍﻟﺬﻱ ﺑﻤﻮﺟﺒﻪ ﻳﻤﻜﻦ ﺍﻟﻌﺒﻮﺭ ﺇﻟﻰ ﺩﻭﻟﺔ ﻗﻄﺮ‬
‫ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﺴﻌﻮﺩﻳﺔ ﻭﺩﻭﻟﺔ ﻗﻄﺮ ﺗﺸﻬﺪ ﺗﻄﻮﺭﺍ" ﺳﺮﻳﻌﺎ" ﻭﺗﺰﺩﺍﺩ ﻳﻮﻣﺎ" ﺑﻌﺪ ﻳﻮﻡ ﻧﻈﺮﺍ" ﻟﻠﺘﻄﻮﺭ ﺍﻟﺴﺮﻳﻊ ﺍﻟﺬﻱ ﺗﺸﻬﺪﻩ‬
‫ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﺍﻟﺘﺤﻀﻴﺮﺍﺕ ﻭﺍﻹﻧﺸﺎءﺍﺕ ﺍﻟﺘﻲ ﺗﻘﻮﻡ ﺑﻬﺎ‬،‫ﺍﻟﻤﻤﻠﻜﺔ ﻓﻲ ﺟﻤﻴﻊ ﻣﺮﺍﻓﻘﻬﺎ ﻭﺍﻟﺬﻱ ﻳﻘﺎﺑﻠﻬﺎ ﺑﺎﻟﻤﺜﻞ ﻓﻲ ﺩﻭﻟﺔ ﻗﻄﺮ‬
.2022 ‫ﺩﻭﻟﺔ ﻗﻄﺮ ﺍﺳﺘﻌﺪﺍﺩﺍ" ﻟﺪﻭﺭﺓ ﻛﺄﺱ ﺍﻟﻌﺎﻟﻢ ﻟﻜﺮﺓ ﺍﻟﻘﺪﻡ ﻋﺎﻡ‬
:‫ﻭﻗﺪ ﺗﻢ ﺍﺧﺘﻴﺎﺭ ﻣﻮﻗﻌﻴﻦ ﻟﻌﻨﺎﺻﺮ ﺍﻟﻤﺸﺮﻭﻉ‬
:‫ﺍﻟﻤﻮﻗﻊ ﺍﻷﻭﻝ‬
:‫ﻫﻮ ﻣﻨﻄﻘﺔ ﺍﻟﻤﻨﻔﺬ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﺍﻟﻤﺒﺎﻧﻲ ﺍﻹﺩﺍﺭﻳﺔ ﺍﻟﺘﺎﺑﻌﺔ ﻟﻪ ﻭﻫﻮ ﻗﺴﻤﻴﻦ‬
‫ ﺍﻟﻤﻨﻔﺬ‬:‫ﺍﻟﻘﺴﻢ ﺍﻷﻭﻝ‬
‫ ﺍﻟﻤﻨﻄﻘﺔ ﺍﻹﺩﺍﺭﻳﺔ‬:‫ﺍﻟﻘﺴﻢ ﺍﻟﺜﺎﻧﻲ‬
:‫ﺍﻟﻤﻮﻗﻊ ﺍﻟﺜﺎﻧﻲ‬
‫ﺧﺼﺺ ﻫﺬﺍ ﺍﻟﻤﻮﻗﻊ ﻹﻧﺸﺎء ﻭﺣﺪﺍﺕ ﺳﻜﻨﻴﺔ ﻣﺘﻨﻮﻋﺔ ﻻﺳﺘﻴﻌﺎﺏ ﺍﻟﻌﺎﻣﻠﻴﻦ ﻓﻲ ﺍﻟﻤﺸﺮﻭﻉ ﻣﻦ ﻋﺎﺋﻼﺕ ﻭﻣﻮﻅﻔﻴﻦ ﻏﻴﺮ‬
. ‫ ﻛﻞ ﺣﺴﺐ ﻭﺿﻌﻪ ﺍﻻﺟﺘﻤﺎﻋﻲ ﻭﺣﺴﺐ ﻋﻤﻠﻪ ﻓﻲ ﺍﻟﻤﺸﺮﻭﻉ ﻣﻊ ﺍﻟﺨﺪﻣﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻭﺍﻟﻤﻌﻴﺸﻴﺔ‬،(‫ﻣﺘﺰﻭﺟﻴﻦ )ﺍﻟﻌﺰﺍﺏ‬
‫ ﺍﻟﻘﺎﺩﻡ ﻭ ﺍﻟﺨﺎﺭﺝ ﻣﻦ ﺩﻭﻟﺔ ﻗﻄﺮ‬:‫ﻭﻓﻴﻤﺎ ﻳﻠﻲ ﻣﺤﺘﻮﻳﺎﺕ ﻫﺬﺍ ﺍﻟﻤﻨﻔﺬ‬
:‫ﺍﻟﺸﺎﺣﻨﺎﺕ‬
‫ ﺻﺎﻻﺕ ﺍﻟﺘﻮﺯﻳﻊ ﻭﺇﻋﺎﺩﺓ ﺗﺤﻤﻴﻞ ﺍﻟﺸﺎﺣﻨﺎﺕ‬-
‫ ﺻﺎﻻﺕ ﺍﻟﺘﺮﺍﻧﺰﻳﺖ‬-
Scanner -
.‫ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﻜﺎﺗﺐ ﺇﻧﻬﺎء ﺍﻷﻋﻤﺎﻝ ﻭﺍﻟﻤﻌﺎﻣﻼﺕ ﺍﻟﻮﺭﻗﻴﺔ ﻭﻣﺮﺍﻛﺰ ﺍﻟﺘﺪﻗﻴﻖ ﻋﻠﻰ ﺍﻟﻄﺮﻕ‬

Page 6/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu


Surname(s) First name(s) © European Communities, 2003 20060628
:‫ﺍﻟﺴﻴﺎﺭﺍﺕ ﻭﺍﻟﺒﺎﺻﺎﺕ‬
‫ ﺻﺎﻟﺔ ﺍﻟﺠﻮﺍﺯﺍﺕ‬-
‫ ﺻﺎﻟﺔ ﺍﻟﺠﻤﺎﺭﻙ‬-
.‫ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﻜﺎﺗﺐ ﺇﻧﻬﺎء ﺍﻷﻋﻤﺎﻝ ﻭﺍﻟﻤﻌﺎﻣﻼﺕ ﺍﻟﻮﺭﻗﻴﺔ ﻭﻣﺮﺍﻛﺰ ﺍﻟﺘﺪﻗﻴﻖ ﻋﻠﻰ ﺍﻟﻄﺮﻕ‬
:‫ﺍﻟﻘﺴﻢ ﺍﻟﺜﺎﻧﻲ‬ ‫ﺍﻟﻤﻨﻄﻘﺔ ﺍﻹﺩﺍﺭﻳﺔ‬
‫ﺇﻥ ﺍﻟﻤﻨﻄﻘﺔ ﺍﻹﺩﺍﺭﻳﺔ ﺍﻟﺘﻲ ﻳﺘﻢ ﺍﻟﻮﺻﻮﻝ ﺇﻟﻴﻬﺎ ﻣﻦ ﺟﻬﺔ ﺍﻟﻤﻤﻠﻜﺔ ﻓﻬﻲ ﺃﻭﻝ ﻣﺎ ﻳﺼﺎﺩﻑ ﺍﻟﺨﺎﺭﺝ ﻣﻦ ﺍﻟﻤﻤﻠﻜﺔ ﻭﻫﻲ ﺗﺤﺘﻮﻱ‬
:‫ﻋﻠﻰ‬
‫ﺳﺒﻌﺔ ﻋﺸﺮ ﻭﺣﺪﺓ ﺇﺩﺍﺭﻳﺔ‬ -
‫ﺍﻟﻤﺴﺠﺪ‬ -
‫ﻭﺣﺪﺓ ﺗﻨﻘﻴﺔ ﺍﻟﻤﻴﺎﻩ‬ -
‫ﻣﺤﻄﺔ ﺗﻮﻟﻴﺪ ﺍﻟﻜﻬﺮﺑﺎء‬ -
:‫ﺍﻟﻤﻮﻗﻊ ﺍﻟﺜﺎﻧﻲ‬

:‫ﺗﺤﺘﻮﻱ ﺍﻟﻤﻨﻄﻘﺔ ﺍﻟﺴﻜﻨﻴﺔ ﻋﻠﻰ ﻣﺎ ﻳﻠﻲ‬


(‫ ﻭﺣﺪﺓ ﺳﻜﻨﻴﺔ )ﻓﻴﻼ‬17 -
‫ ﺳﻜﻦ ﻟﻠﻌﺰﺍﺏ‬100 -
‫ﺣﻀﺎﻧﺔ‬ -
‫ﺳﻮﻕ ﺻﻐﻴﺮ‬ -
‫ﻭﺣﺪﺓ ﺻﺤﻴﺔ ﻭﺃﻁﺒﺎء‬ -
‫ﻣﺤﻄﺔ ﺗﻮﻟﻴﺪ ﻁﺎﻗﺔ‬ -
‫ﻣﺤﻄﺔ ﺗﻨﻘﻴﺔ ﻣﻴﺎﻩ‬ -

Other Achievements
Design and Construction Supervision of Saadiyat Bridge Fishing Port

The project consists of park of 200 medium size boats, and to include 8 finger pontoons, sea-side
platform for outdoor auction, heavy duty crane to elevate boats, ramps for boats sliding.

New Fishing Port in Abu Dhabi (7 Ports)


Engineering, Socio-Economic and Environmental Evaluation of Seven Ports in Abu Dhabi, and
propose solution for upgrading, removal or relocation to more suitable location, with all related
facilities.
Silaa Fishing Port
Delma Fishing Port
Mirfa Fishing Port
Al Bateen Fishing Port
Free Port Fishing Port
Old Saadiyat Bridge Fishing Port
Al Sadr Fishing Port

The Design and Supervision for the public schools for the benefit of CDR

Beirut Public School. (2001-2002)


The project consisted of complete DE rehabilitation to the existing buildings and execution of adding
additional structures to accommodate required classes in accordance with the latest concerned
decree in coordination with Experts of Ministry of Education & Higher Education.

Page 7/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu


Surname(s) First name(s) © European Communities, 2003 20060628
El-Qoba – Bab Al Tabbaneh, Elementary – Intermediate – Secondary School (School 1) For the
benefit of the Central Funds for the Displaced-Tripoli

(2003-2004)

The School Complex consists of 8 levels and covers a total area of 6,950 square meters and serves
900 students as follows:
Level 1 contains the car park, guardhouse, multipurpose hall, electrical substation and other
services.
Level 2 contains the generator room, covered playgrounds, the administration and supporting
services for the Elementary classes.
Level 3 houses 6 elementary classes (one section) with all related services and a workshop for 216
students.
Level 4 houses 6 other elementary classes (one section) with all related services and covered
playgrounds.
Level 5 contains covered playgrounds, another guardhouse, administration for the intermediate and
the secondary schools, library and related services.
Level 6 houses 6 intermediate classes (2 sections) with all related services.
Level 7 houses common services for intermediate and secondary classes.
Level 8 this level contains 5 secondary classes (2 sections) with all related services.
Roof Level open playground for intermediate and secondary schools.

Total construction cost: US$2,215,000.

Other Achievements El-Qoba – Bab Al Tabbaneh, Nursery School (School 2) For the benefit of the Central Funds for
the Displaced-Tripoli

(2002-2003)

The school building consists of 2 levels and covers a total area of 885 square meters and serves 96
students. The nursery contains: 4 pre-elementary classes (2 sections), game rooms and all related
services.

Total construction cost: US$300,000.

Shmestar Public School.

The project is an educational complex containing 3 blocks covered a total area of 6026 m2 occupy
972 students as follows:

Block 1 – Intermediate School: 3 levels covered 2400 m2, containing administration for Intermediate
section, 12 classrooms (four sections) to occupy 432 students with all related workshops and
laboratories.

Block 2 – Multipurpose Hall, Library, & other services: 2 levels covered 860 m2 containing double
volume Multipurpose Hall covered 220 m2, School library covered 220 m2, and other services such
as computer rooms, art rooms, corridors…etc covered 420 m2.

Block 3 – Secondary Schools: 3 levels covered 2766 m2, containing administration for secondary
section, 18 classrooms (six sections) to occupy 540 students with all related workshops and
laboratories.

Page 8/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu


Surname(s) First name(s) © European Communities, 2003 20060628
June 1998 – May 1999

Saudi Construction Company watta el mosaytbeh, Beirut – Lebanon,

Project name: Rehabilitation of Building Facades Of Sabra2 (Phase 1 & Phase 2) And
Construction Of Potable Water Network.

Client: CDF (Central Fund for the Displaced).

Project perimeter: The perimeter was the zone 2 (S2) of ELISAR project.

Project description: The project consists of rehabilitation of 303 ruined building facades,
damaged during the civil wars; work include protecting and maintaining historic distinctive materials,
repairing deteriorated material by patching and splicing, and replacing distinctive materials when is
too deteriorated to repair or when it is missing, in addition to the construction of potable water
network.

Project name: Consultancy Services for Immediate Relief Works In Al Tebbaneh –


Tripoli ~ 16 Km2 (Contract No. 7886).
Client: CDR (Council for Development and Reconstruction).
Project perimeter: The perimeter was limited by Al Kobbeh area to the east, and Al Basatin area
to the west.
Project description: The project consists of rehabilitation and reconstruction of effected
buildings by the civil wars, work include protecting and maintaining historic distinctive materials,
repairing deteriorated material by patching and splicing, and replacing distinctive materials when
is too deteriorated to repair or when it is missing, in addition to upgrading the urban context of the
area and to upgrade and redesign the whole infrastructure including several public gardens.

Other Achievements Project Manager / Design, Construction & Supervision for the following’s projects:
Beirut Schools - Urgent Rehabilitation Plan
Shouwaifat Technical & Vocation School
Additional Buildings to Public Schools in Beirut
Design & Supervision of Schmestar Public School
Design & Supervision of Deir Al-Ahmar Public School
Technical & Vocational School – Halba
Technical & Vocational School – Mtein
Technical & Vocational School – Becharri
"Governmental Educational Teaching Complex – Bir Hassan – School 19 Technical & Vocational
School – Shmestar Supervision of Lebanon, National Roads Project 2nd & 3rd Year Pilot
Projects"
NOVA Residential Towers on Lots 1068 + 1069 – Beirut/Lebanese Football Center - Alley Sports
City

Dates 1998 to 1999


Occupation or position held Coordinator / Architect
Main activities and responsibilities Duties includes Design, coordination with other departments, from inception to final stage, prepare shop
drawings, prepare as-built drawings.
Name and address of employer Saudi Construction Company

Dates 1997 to 1998


Occupation or position held Designer
Main activities and responsibilities Duties includes Design, coordination with other departments, from inception to final stage, liaison with
client, quality control, prepare execution drawings, prepare tender drawings.

Name and address of employer Tower Engineering & Contracting l.l.c.

Page 9/9 - Curriculum vitae of For more information on Europass go to http://europass.cedefop.europa.eu


Surname(s) First name(s) © European Communities, 2003 20060628

You might also like