Professional Documents
Culture Documents
Flood Detention
Extended Detention
SSRT
SSRL
Secondary
SRDU
Primary Outlet SRDL
Secondary Outlet
SRDU
ters
Ove
r flow
Dedicated Airspace Ou
tlet
Sec
o nda
Dynamic Airspace ry
Ou
tlet
Nett Tank Volume
Top-Up Volume
Sec
o nda
ry
Ou
tlet
t Tank Volume
al Tank Volume
Project: UPRCT Handbook Demonstration Example
Site Address A Place, South Wentworthville
Job No: W4574-2
Designer: JC
Telephone: (02) 9891 4633
Site Data
OSD Area: Upper Parramatta River Catchment
L.G.A Parramatta City Council
Site Area 0.24 ha 2,400 m2
OSD Calculations
Extended Detention
Basic SSR Volume Ext Detention Storage 72.00 m3 Total Storage
3
Total Rainwater Tank Credits 5.60 m
Number of Orifices 1 1 1
Estimated Downstream Flood Level 8.90 1.5 yr ARI
Signature: Date:
ta River Catchment
Level)
y 30% Max
y
Detention
520 m3/ha
150 L/s/ha
123 L/s/ha
Detention
124.80 m3
6.16 m3
118.64 m3
52.24 m3
29.60 L/s
10.300 m
10.100 m
1 1
10.05 100 yr ARI
-0.05
0.200 m
178 mm
10.600 m
10.500 m
2.00 m
0.75
206 mm/h
92.7 L/s
93 mm
207 mm
107 mm
)
Credit is Claimed
n each dwelling
Min Max
44.2% 100%
y
Detention
0.00 kL
ed Airspace
ed Airspace
1.54 kL
5.00 kL
1.54 kL
6.16 m3