Name of the Project / Factory / Workshop / Job No:22020 – Qatargas- BARZAN Division/ Area: Plant, Admin, BFOC & NFXP
Name of the Project Director / Site / Workshop Manager: Mr.K.M.Shadab / Staff No.90128
SECTION A: Project HSE Lead
Avg. No of
No. of
man No. of Man days
- No. of LTI - - Hospital -
days lost
Ref.cases
worked
No. of Near Miss No. of
No. of First
Man-hours -
Aid cases
- Incidents - HSEMeeting -
worked reported conducted
SECTION B: Project HSE Officer/Engineer
D Dang Remedial Action
Hazard
at Equipment/ Doc
er Dang Proposed/ Additional Action
Action By with Target
Sl. No. a Observations Level er control measure / taken
Ref. Staff No& Name. date
ty (LXSX code Applicable Legal on
pe E) requirement to comply
Landscape equipment was stored in an Improper Advised the concerned person to 1 week On
storage of store all this gasoline operated
1
open area as no shaded storage places approv
UC BXK-1 equipment M 8 equipment under a shed to protect Landscape RT
are available for landscape equipment in it from getting exposed to the al
admin areas. sunlight. stage
The rest shelter roof sheets support have Damaged 3 Days
visible signs of damage and mold, and the roof/ceiling On
The concerned person was
2 wooden sheets seem swollen and puffy. supports approv
UC BSS-1 M 8 advised to replace the roof sheets Civil/Landscape
can fall off ASAP. al
and sustain stage
injury.
It was noticed that a few essential first aid Lack of first The issue was notified to the 1 Week
3 aid kits Intend
UC BZ-Yard kits were not available inside the box at L 4 concerned person for the filling of HSE-Management
raised
BZ Yard. first aid kits.
All fire extinguisher external service is Delay in
overdue, the FE was supposed to be sent equipment’ The concerned person was
4 s service Intend
UC BZ-Yard on or before May 23, 2023, which was the M 8 informed regarding this standing HSE
raised
recommended date for external issue.
inspection.
Page 1 of 4
Classification: Internal SF/FR-23
EMCO FACILITIES MANAGEMENT Doc. No:
It was noticed that a step ladder was left Improper The concerned person was Immediate
housekeepi informed to remove the ladder
unattended after completion of work.
ng immediately and advised him to
5 UC BXK-2 L 4 Electrical Closed
always make sure to store the
equipment at their designated
place once the shift is ended.
TBT/LMRA was conducted by PH to the
workers and all are aware of the
emergency procedure, Tools were found
in good condition, workplace hazards &
control measures were captured in JSA,
Permit No. Site controls – Work location barricaded,
CWP 2236348,
Signages and Barricade owner
information tags were displayed,
Activity:
Appropriate PPE’s used by the workforce.
1 Landscaping RT No Action Required Abrar-(PH)
Special PPE: Nil
Location: 1 to 24
SWP Checklist: The relevant checklist
were attached to the permit
JSA: Attached with the permit- 2236349
MSDS: Attached to the permit- QAFCO –
Urea Granules, Urea Prills,
Page 2 of 4
Classification: Internal SF/FR-23
EMCO FACILITIES MANAGEMENT Doc. No:
Page 3 of 4
Classification: Internal SF/FR-23
EMCO FACILITIES MANAGEMENT Doc. No:
Page 4 of 4