Name of the Project / Factory / Workshop / Job No:22020 – Qatargas- BARZAN Division/ Area: Plant, Admin, BFOC & NFXP
Name of the Project Director / Site / Workshop Manager: Mr.K.M.Shadab / Staff No.90128
SECTION A: Project HSE Lead
Avg. No of
No. of
man No. of Man days
- No. of LTI - - Hospital -
days lost
Ref.cases
worked
No. of Near Miss No. of
No. of First
Man-hours -
Aid cases
- Incidents - HSEMeeting -
worked reported conducted
SECTION B: Project HSE Officer/Engineer
D Dang Remedial Action
Hazard
at Equipment/ Doc
er Dang Proposed/ Additional Action
Action By with Target
Sl. No. a Observations Level er control measure / taken
Ref. Staff No& Name. date
ty (LXSX code Applicable Legal on
pe E) requirement to comply
It has been noticed that some fiberglass Structural The visual
step ladders show clear signs of getting weakness, The concerned department was inspection
slippery told to stop using the old fiberglass is being
old. The once colourful and smooth step ladder because it showed
surface has slowly lost its brightness and steps schedule to Open-
clear signs of getting old. As time be Under
1 UC Non-Plant Areas
has become more fragile as time passed. M 14
goes by, ladders can become
General conducted visual
weaker and less safe. So,
switching it out for a new ladder throughout inspect
will make sure that everyone stays the site in ion
safe and the ladder works well in the
the future. upcoming
days.
The heat index monitoring sheet was not Negligence The PH was advised to maintain Immediate
2 UC BXK-4 maintained properly. M 12 the heat index monitoring and rest Dainel Closed
cycle sheet properly.
TBT/LMRA was conducted by PH to the
Permit No.
workers and all are aware of the
CWP 2358463,
1
emergency procedure, Tools were found
No Action Required Waseem-(PH)
Activity: Civil RT in good condition, workplace hazards &
PPM control measures were captured in JSA,
Site controls – Work location barricaded,
Page 1 of 5
Classification: Internal SF/FR-23
EMCO FACILITIES MANAGEMENT Doc. No:
Page 2 of 5
Classification: Internal SF/FR-23
EMCO FACILITIES MANAGEMENT Doc. No:
Page 3 of 5
Classification: Internal SF/FR-23
EMCO FACILITIES MANAGEMENT Doc. No:
Page 4 of 5
Classification: Internal SF/FR-23
EMCO FACILITIES MANAGEMENT Doc. No:
Page 5 of 5