Dated: 04/03/2018 Page 1 of 22  Rev. A 
 
 
 
 
 
 
 
HYDRAULIC ANALYSIS REPORT 
FOR 
AISHA STEEL MILLS LIMITED KARACHI 
 
   

ISSUED FOR
REVIEW 
MARCH 09, 2018

A 09/03/2018 Issued for Review AN RA ASJ

REV. DATE DESCRIPTION ORIGINATOR REVIEWED APPROVED

   
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 2 of 22  Rev. A 
 

REVISION RECORD

Revision Date Description of Change

Rev. A A003-RP-02 Issued for Review

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 3 of 22  Rev. A 
 
TABLE OF CONTENTS 
1.0  INTRODUCTION  5 
1.1  Scope  5 
1.2  Definitions  5 
1.3  Abbreviations  6 
1.4  System Of Units  7 
1.5  Referenced Documents  7 
1.6  Codes & Standards  8 
1.7  Site Data  8 
2.0  HYDRAULIC ANALYSIS BASIS  9 
2.1  General  9 
2.2  Gas Composition  9 
2.3  Line Sizing Criteria  10 
2.3.1  Gas Lines  10 
2.3.2  Liquid Lines  10 
2.3.1  Steam Lines  11 
2.4  Nitrogen Sizing Scenario I  11 
2.5  Nitrogen Sizing Scenario II  12 
2.6  Hydrogen Sizing  12 
2.7  Protective Gas Sizing  13 
2.8  Natural Gas Sizing  13 
2.9  Compressed Air Sizing  14 
2.10  Saturated Steam Sizing  14 
2.11  Demineralized Water Sizing  14 
2.12  Cooling Recycle Water Sizing  15 
2.13  Hot Water Sizing  15 
2.14  Potable Water Sizing  15 
2.15  Sewage Waste Water Sizing  16 
3.0  HYDRAULIC ANALYSIS RESULTS  17 
3.1  Nitrogen Line Sizing Results Summary Scenario I  17 
3.2  Nitrogen Line Sizing Results Summary Scenario II  17 
3.3  Hydrogen Line Sizing Results Summary  18 
3.4  Protective Gas Line Sizing Results Summary  18 
3.5  Natural Gas Line Sizing Results Summary  19 
3.6  Compressed Air Line Sizing Results Summary  19 
3.7  Saturated Steam Line Sizing Results Summary  20 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 4 of 22  Rev. A 
 
3.8  Demineralized Water Line Sizing Results Summary  20 
3.9  Cooling Recycle Water Line Sizing Results Summary  21 
3.10  Hot Water Line Sizing Results Summary  21 
3.11  Potable Water Line Sizing Results Summary  22 
3.12  Sewage Waste Water Line Sizing Results Summary  22 
 
1. Annexure‐A      Nitrogen Simulation Model Scenario I 
2. Annexure‐B      Nitrogen Simulation Model Scenario II  
3. Annexure‐C      Hydrogen Simulation Model  
4. Annexure‐D      Protective Gas (N2 + H2) Simulation Model 
5. Annexure‐E      Natural Gas Simulation Model 
6. Annexure‐F      Compressed Air Simulation Model 
7. Annexure‐G      Saturated Steam Simulation Model 
8. Annexure‐H      Desalination / Demineralized Water Simulation Model 
9. Annexure‐I      Cooling Recycle Water  Simulation Model 
10. Annexure‐J      Hot Water Simulation Model 
11. Annexure‐K      Potable Water Simulation Model 
12. Annexure‐L      Sewage Waste Water Simulation Model 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 5 of 22  Rev. A 
 
1.0 INTRODUCTION 
Aisha Steel Mills Limited (ASML) is a Group Company of Arif Habib. It is a state‐of‐the‐art cold 
rolling complex with a nameplate capacity of 220,000 metric tons per year. ASML is one of the 
largest private sector investments in the value added flat‐rolled steel industry in Pakistan. It is the 
only Cold Rolled Coil (CRC) manufacturer in the country which is using brand new Japanese and 
Austrian  machinery  for  all  of  its  main  process,  ensuring  best  quality  production  of  CRC  in  the 
country. ASML was incorporated in 2005 & started its commercial operation in 2012 and it sets 
to become largest supplier of Cold Rolled and Steel Coils. 
ASML has engaged M/s A2SK Engineering Private Limited to calculate the line sizes for the utilities 
as Nitrogen (N2) with high flow rate, Nitrogen (N2) with low flow rate ‘Hydrogen (H2) 
Protective  Gas  (N2  +  H2)  ‘Natural  Gas  (NG)  ‘Compressed  Air,  Saturated  Steam,  Desalination  / 
Demineralized  Water,  Cooling  Recycle  Water,  Hot  Water,  Potable  Water  and  Sewage  Waste 
Water etc. 
This document for the Project shall be considered as a guide for Contractor, and the requirements 
referred to herein shall be taken as minimum requirements. The scope of works is not intended 
to limit or restrict the obligations of contractor in respect of the execution of the works and no 
part of the scope of works shall limit any other part of the scope of works or neither any of the 
specifications nor the responsibilities of Contractor in respect thereof. 
1.1 Scope 
The purpose of this report is to determine utilities line sizes for Aisha Steel Mills Limited located 
at DSU‐45 Downstream Industrial Estate Karachi. The line sizes need to be determined for the 
plant in order to meet specified flow velocity and pressure drop criteria. Hydraulic analysis report 
shall  be  applicable  to  utilities  units  and  associated  facilities  located  within  plant  fence  except 
where otherwise stated. 
The line sizing scope shall be limited to the following utilities:‐ 
1. Nitrogen (N2) with high flow rate 
2. Nitrogen (N2) with low flow rate 
3. Hydrogen (H2) 
4. Protective Gas (N2 + H2) 
5. Natural Gas (NG) 
6. Compressed Air 
7. Saturated Steam 
8. Desalination / Demineralized Water 
9. Cooling Recycle Water  
10. Hot Water  
11. Potable Water  
12. Sewage Waste Water  
1.2 Definitions 
The definitions used for this project are included in Table 1.1 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 6 of 22  Rev. A 
 
Table 1.1 Definitions 

COMPANY/ CLIENT  Aisha Steel Mills Limited

Firm / Organization nominated by COMPANY to perform Work. It 
CONTRACTOR  is the party which carries‐out all Procurement and Construction / 
Installation of all Equipment after Engineering Design.  

CONSULTANT  A2SK Engineering (Pvt.) Limited. 

Consultancy services for detailed design of utilities piping for Aisha 
PROJECT 
Steel Mills Limited Karachi. 

SHALL  Indicates a mandatory requirement. 

Indicates  a  strong  recommendation  to  comply  with  the 


SHOULD 
requirements of this document. 

1.3 Abbreviations 
The abbreviations used for this project are included in Table 1.2 
Table 1.2 Abbreviations 

CA  Compressed Air 

CRW  Cooling Recycled Water 

DSW  Desalination Water 

EPC  Engineering, Procurement, Construction 

FW  Fire Water 

H2   Hydrogen 

hr  Hour 

HW  Hot Water 

ID   Inside Diameter 

Kg  Kilogram 

KM  Kilometre 

m  Meter 

N2  Nitrogen 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 7 of 22  Rev. A 
 
NG  Natural Gas 
o
C  Degree Celsius 

P&ID  Piping & Instrumentation Diagram 

PFD  Process Flow Diagram 

PG  Protective Gas (Nitrogen + Hydrogen) 

PW  Portable Water 

St  Saturated Steam 

SW  Sewage Waste Water 

1.4 System Of Units 
The SI units have been used and are included in Table 1.3. 
Table 1.3 System of Units 

Parameters  Units 

Density  Kg/m3 

Length  m or km 

Liquid Volumetric Flow Rate (Cubic meter per Hour)  m3/hr (N m3/hr) 

Pipe Diameter  Inches 

Pressure   barg 
o
Temperature   C 

Viscosity  cP 

Velocity  m/s 

1.5 Referenced Documents 
The  following  documents  as  listed  in  Table  1.4  have  been  used  as  reference  documents  for 
preparation of hydraulic analysis report. 
 
 
 
 
 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 8 of 22  Rev. A 
 
Table 1.4 Referenced Documents 

Document Numbers  Document Titles 

Piping & Instrumentation Diagrams  

‐  P&ID _ Nitrogen Distribution System Scenario I 

‐ P&ID _ Nitrogen Distribution System Scenario II  

‐ P&ID _ Hydrogen Distribution System 

‐ P&ID _ Protective Gas (N2 + H2) Distribution System 

‐ P&ID _ Natural Gas Distribution System 

‐ P&ID _ Compressed Air Distribution System 

‐ P&ID _ Saturated Steam Distribution System 

‐ P&ID  _  Desalination  /  Demineralized  Water  Distribution 


System 

‐ P&ID _ Cooling Recycle Water Distribution System 

‐ P&ID _ Hot Water Distribution System 

‐ P&ID _ Potable Water Distribution System 

‐ P&ID _ Sewage Waste Water Distribution System 

1.6 Codes & Standards 
The  overall  design  of  the  system  is  in  compliance  with  the  latest  edition  of  the  codes  and 
standards as included in Table 1.5. 
Table 1.5 Codes & Standards 

Code  Description 

Recommended Practice for Design and Installation of Offshore 
API RP 14E 
Production Platform Piping Systems. 

GS‐EP‐ECP‐103  Total standard (Revision 02) 

1.7 Site Data 
The environmental conditions for terminal station are included in Table 1.6 
 
 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 9 of 22  Rev. A 
 
Table 1.6 Site Data 

Parameters  Units  Values 


o  
Ambient Temperature (Max)  C 45 
o  
Ambient Temperature (Min)  C 10 

Average Relative Humidity (Max)  %  90 

Average Relative Humidity (Min)  %  19 

Wind Velocity (Max)  Miles/hr  90 

Site Elevation   m  ‐ 

 
2.0 HYDRAULIC ANALYSIS BASIS 
2.1 General 
Line size is determined based on the limiting velocities of the pipe, material used, length of the 
pipe and the allowable line pressure drop. The velocity limitations are considered to keep in mind 
the:‐ 
 Required capacity/available driving pressure 
 Flow induced forces 
 Noise/vibration 
 Pressure surges 
 Material degradation ‐ erosion, corrosion and cavitation 
 Liquid accumulation/slug flow   
 Sand accumulation 
2.2 Gas Composition 
The natural gas composition for natural gas line sizing is included in Table 1.7 
Table 1.7 Gas Composition 

Components Mol %

Methane 91.35 

Ethane  0.98

Propane 0.2

i-Butane 0.07

n-Butane 0.07

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 10 of 22  Rev. A 
 
Components Mol %

i-Pentane 0.04

n-Pentane 0.04

n-Hexane 0.15

Nitrogen 6.94

CO2 0.16

H2O 0.0

Hydrogen 0.0

Total 100

2.3 Line Sizing Criteria 
Piping pressure drop calculations  are to be based on pipe roughness, friction  factors and  pipe 
lengths. These calculations are done using the Darcy equation and Colebrook equation. Pressure 
drop considered across pump suction strainer is 0.068 bars as per FEED data sheet. The size of 
each line is estimated based on the volumetric flow rate and in accordance with the velocity and 
friction loss ranges criteria. 
2.3.1 Gas Lines 
Piping pressure drop calculations  are to be based on pipe roughness, friction  factors and  pipe 
lengths. These calculations are done using the Darcy equation and Colebrook equation. Line sizing 
criteria for gas lines based on API RP 14E is as under:‐ 
Gas: Maximum velocity of 17 m/s (55.7 ft/s). Velocity can cause a noise problem if it shall exceed 
the maximum value. Pressure drop shall not exceed 1.36 bar / 100 m 
 
2.3.2 Liquid Lines 
Liquid line sizing criteria based on API RP 14E and TOTAL standard GS‐EP‐ECP‐103, Revision 02 is 
as under:‐ 
 
 
 
 
 
 
 
 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 11 of 22  Rev. A 
 
Table 2.1  Liquid Line Sizing Criteria 

  Velocity  ΔP 
Parameters 
 
  m/s  bar/100m 
 
 
  <2”  3” ‐ 6”  8”‐18”  >20”  Nor  Max 

   Liquid Lines (Carbon Steel) 
 
Large inter‐Unit Lines   ‐  1.5   3.0  ‐  0.15  ‐ 
 
Long Lines  1.5  2.5  3.0  3.0  ‐  0.15 
 
  Short Lines  1.5  2.5  3.0  3.0  ‐  0.35 

 
2.3.1 Steam Lines 
Steam line sizing criteria based on engineering practice and TOTAL standard GS‐EP‐ECP‐103 is as 
under:‐ 
Table 2.2  Steam Line Sizing Criteria 

Velocity  ΔP 
Parameters 
  m/s  bar/100m 
 
Nor  Max 

Steam Lines 

10 < P ≤ 30 bar g       

Short line ≤ 200m  42  1.2  2.3 

Long line > 200m  42  0.25  1.0 

 
2.4 Nitrogen Sizing Scenario I 
The following nitrogen properties used for hydraulic analysis and are included in Table 2.3 
 
 
 
 
 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 12 of 22  Rev. A 
 
Table 2.3 Nitrogen Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

Operating Pressure  barg  0.40 

Flow Rate  Nm3/hr  570 

Density   kg/m3  1.57 

Viscosity   cP  0.0186 

Compressibility  ‐  0.999 

Ratio of Specific Heats  ‐  1.401 

Molecular Weight  ‐  28.01 

2.5 Nitrogen Sizing Scenario II 
The following nitrogen properties used for hydraulic analysis and are included in Table 2.4 
Table 2.4 Nitrogen Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

Operating Pressure  barg  0.40 

Flow Rate  Nm3/hr  570 

Density   kg/m3  1.57 

Viscosity   cP  0.0186 

Compressibility  ‐  0.999 

Ratio of Specific Heats  ‐  1.401 

Molecular Weight  ‐  28.01 

2.6 Hydrogen Sizing  
The following hydrogen properties used for hydraulic analysis and are included in Table 2.5 
Table 2.5 Hydrogen Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 13 of 22  Rev. A 
 
Operating Pressure  barg  0.40 

Flow Rate  Nm3/hr  280 

Density   kg/m3  0.11 

Viscosity   cP  0.0089 

Compressibility  ‐  1.0 

Ratio of Specific Heats  ‐  1.41 

Molecular Weight  ‐  2.02 

2.7 Protective Gas Sizing  
The following protective gas properties used for hydraulic analysis and are included in Table 2.6 
Table 2.6 Protective Gas Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

Operating Pressure  barg  0.40 

Flow Rate  Nm3/hr  370 

Density   kg/m3  0.84 

Viscosity   cP  0.0136 

Compressibility  ‐  1.0 

Ratio of Specific Heats  ‐  1.41 

Molecular Weight  ‐  15.01 

2.8 Natural Gas Sizing  
The following natural gas properties used for hydraulic analysis and are included in Table 2.7 
Table 2.7 Natural Gas Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

Operating Pressure  barg  0.16 

Flow Rate  Nm3/hr  1500 

Density   kg/m3  0.81 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 14 of 22  Rev. A 
 
Viscosity   cP  0.0118 

Compressibility  ‐  0.998 

Ratio of Specific Heats  ‐  1.30 

Molecular Weight  ‐  17.32 

2.9 Compressed Air Sizing  
The following compressed air properties used for hydraulic analysis and are included in Table 2.8 
Table 2.8 Compressed Air Properties 

Parameters  Units  Values 

o
Operating Temperature  C  40 

Operating Pressure  barg  7.0 

Flow Rate  Nm3/hr  5780 

Density   kg/m3  8.93 

Viscosity   cP  0.0199 

Compressibility  ‐  0.997 

Ratio of Specific Heats  ‐  1.42 

Molecular Weight  ‐  28.95 

2.10 Saturated Steam Sizing  
The following saturated steam properties used for hydraulic analysis and are included in Table 2.9 
Table 2.9 Saturated Steam Properties 

Parameters  Units  Values 

o
Operating Temperature  C  150 

Operating Pressure  barg  5 

Flow Rate  Kg/hr  6000 

Density   kg/m3  2.67 

Viscosity   cP  ‐ 

2.11 Demineralized Water Sizing  
The following demin water properties used for hydraulic analysis and are included in Table 2.10 
 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 15 of 22  Rev. A 
 
Table 2.10 Demin Water Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

Operating Pressure  barg  6 

Flow Rate  m3/hr  35 

Density   kg/m3  1004 

Viscosity   cP  0.8 

2.12 Cooling Recycle Water Sizing  
The following cooling water properties used for hydraulic analysis and are included in Table 2.11 
Table 2.11 Cooling Water Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

Operating Pressure  barg  5 

Flow Rate  m3/hr  997 

Density   kg/m3  1004 

Viscosity   cP  0.8 

2.13 Hot Water Sizing  
The following hot water properties used for hydraulic analysis and are included in Table 2.12 
Table 2.12 Hot Water Properties 

Parameters  Units  Values 

o
Operating Temperature  C  90 

Operating Pressure  barg  2.5 

Flow Rate  m3/hr  42 

Density   kg/m3  956.3 

Viscosity   cP  0.31 

2.14 Potable Water Sizing  
The following potable water properties used for hydraulic analysis and are included in Table 2.13 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING FOR AISHA STEEL MILLS LIMITED KARACHI 

Job Order # 5530000004  Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 16 of 22  Rev. A 
 
Table 2.13 Potable Water Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

Operating Pressure  barg  4 

Flow Rate  m3/hr  16 

Density   kg/m3  1004 

Viscosity   cP  0.8 

2.15 Sewage Waste Water Sizing  
The following sewage water properties used for hydraulic analysis and are included in Table 2.14 
Table 2.14 Sewage Waste Water Properties 

Parameters  Units  Values 

o
Operating Temperature  C  30 

Operating Pressure  barg  4 

Flow Rate  m3/hr  114 

Density   kg/m3  1004 

Viscosity   cP  0.8 

 
 
 
 
 
 
 
 
 
 
 
 
 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING OF AISHA STEEL MILLS LIMITED KARACHI
Job Order # 5530000004 Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 17 of 22  Rev. A 

 
3.0 HYDRAULIC ANALYSIS RESULTS 
The hydraulic analysis results have been included in below sections from Table 3.1 to 3.14. 
3.1 Nitrogen Line Sizing Results Summary Scenario I 
Nitrogen line sizing results summary for scenario I is provided in below Table 3.1. 

Table 3.1  Nitrogen Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity Pressure 
Drop 
  
‐  ‐  ( Nm3/hr)  (°C)  (barg)  (Kg/m3)  (cp)  (Inches) (m/s)  (bar/100m) ‐ 

Nitrogen  Gas  570  30  0.4  1.57  0.0186  6  6.77  0.005  Okay 

3.2 Nitrogen Line Sizing Results Summary Scenario II 
Nitrogen line sizing results summary for scenario II is provided in below Table 3.2. 

Table 3.2  Nitrogen Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity Pressure 
Drop 
  
‐  ‐  ( Nm3/hr)  (°C)  (barg)  (Kg/m3)  (cp)  (Inches) (m/s)  (bar/100m) ‐ 

Nitrogen  Gas  95  30  0.4  1.57  0.0186  3  4.41  0.016  Okay 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING OF AISHA STEEL MILLS LIMITED KARACHI
Job Order # 5530000004 Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 18 of 22  Rev. A 

 
3.3 Hydrogen Line Sizing Results Summary  
Hydrogen line sizing results summary is provided in below Table 3.3. 

Table 3.3  Hydrogen Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity Pressure 
Drop 
                          
‐  ‐  ( Nm3/hr)  (°C)  (barg)  (Kg/m3)  (cp)  (Inches) (m/s)  (bar/100m) ‐ 

Hydrogen  Gas  280  30  0.4  0.11  0.0089  3  13  0.0037  Okay 

3.4 Protective Gas Line Sizing Results Summary 
Protective gas line sizing results summary is provided in below Table 3.4. 

Table 3.4  Protective Gas Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature Pressure Density  Viscosity ID  Velocity Pressure 
Drop 
                          
‐  ‐  ( Nm3/hr)  (°C)  (barg)  (Kg/m3)  (cp)  (Inches) (m/s)  (bar/100m) ‐ 
Protective 
Gas  370  30  0.4  0.84  0.0136  4  9.98  0.0089  Okay 
Gas 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING OF AISHA STEEL MILLS LIMITED KARACHI
Job Order # 5530000004 Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 19 of 22  Rev. A 

 
3.5 Natural Gas Line Sizing Results Summary 
Natural Gas line sizing results summary is provided in below Table 3.5. 

Table 3.5  Natural Gas Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity  Pressure 
Drop 
                          
‐  ‐  ( Nm3/hr)  (°C)  (barg)  (Kg/m3)  (cp)  (Inches) (m/s)  (bar/100m) ‐ 
Natural 
Gas  1500  30  0.16  0.81  0.0118  8  11.74  0.0049  Okay 
Gas 
3.6 Compressed Air Line Sizing Results Summary 
Compressed air line sizing results summary is provided in below Table 3.6. 

Table 3.6  Compressed Air Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status
Fluid  Flow Rate  Temperature Pressure Density  Viscosity ID  Velocity Pressure 
Drop 
                          
‐  ‐  ( Nm3/hr)  (°C)  (barg)  (Kg/m3)  (cp)  (Inches) (m/s)  (bar/100m) ‐ 
Compressed 
Gas  5780  40  7  8.93  0.0199  8  7.19  0.0178  Okay 
Air 
 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING OF AISHA STEEL MILLS LIMITED KARACHI
Job Order # 5530000004 Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 20 of 22  Rev. A 

 
3.7 Saturated Steam Line Sizing Results Summary 
Saturated Steam line sizing results summary is included in below Table 3.7. 

Table 3.7  Saturated Steam Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity  Pressure 
Drop 
                          
3
‐  ‐  (kg/hr)  (°C)  (barg)  (Kg/m )  (cp)  (Inches) (m/s)  (bar/100m) ‐ 
Sat 
Gas  6000  90  5  2.67  ‐  6  31.8  0.45  Okay 
Steam 

3.8 Demineralized Water Line Sizing Results Summary 
Demin Water line sizing results summary is included in below Table 3.8. 

Table 3.8  Demin Water Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity  Pressure 
Drop 
  
3 3
‐  ‐  (m /hr)  (°C)  (barg)  (Kg/m )  (cp)  (Inches) (m/s)  (bar/100m) ‐ 
Demin 
Liquid  35  30  6  1004  0.8  3.5  1.52  0.28  Okay 
Water 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING OF AISHA STEEL MILLS LIMITED KARACHI
Job Order # 5530000004 Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 21 of 22  Rev. A 

 
3.9 Cooling Recycle Water Line Sizing Results Summary 
Cooling Water line sizing results summary is included in below Table 3.9. 

Table 3.9 Cooling Water Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity  Pressure 
Drop 
                          
3 3
‐  ‐  (m /hr)  (°C)  (barg)  (Kg/m )  (cp)  (Inches) (m/s)  (bar/100m) ‐ 
Cooling 
Liquid  997  30  5  1004  0.8  16  2.43  0.18  Okay 
Water 

3.10 Hot Water Line Sizing Results Summary 
Hot Water line sizing results summary is included in below Table 3.10. 

Table 3.10  Hot Water Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line  Line   Line Status
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity  Pressure 
Drop 
                          

‐  ‐  (m3/hr)  (°C)  (barg)  (Kg/m3)  (cp)  (Inches) (m/s)  (bar/100m) ‐ 

Hot 
Liquid  42  90  2.5  956.3  0.31  4  1.42  0.22  Okay 
Water 

 
CONSULTANCY SERVICES FOR UTILITIES PIPING OF AISHA STEEL MILLS LIMITED KARACHI
Job Order # 5530000004 Doc. No.: A003‐RP‐02 
Hydraulic Analysis Report
Dated: 09/03/2018 Page 22 of 22  Rev. A 

 
3.11 Potable Water Line Sizing Results Summary 
Potable Water line sizing results summary is included in below Table 3.11. 

Table 3.11  Potable Water Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line   Line   Line  Status 
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity  Pressure 
Drop 
                          
3 3
‐  ‐  (m /hr)  (°C)  (barg)  (Kg/m )  (cp)  (Inches) (m/s)  (bar/100m) ‐ 
Potable 
Liquid  16  30  4  1004  0.8  2  2.05  0.09  Okay 
Water 

3.12 Sewage Waste Water Line Sizing Results Summary 
Sewage Water line sizing results summary is included in below Table 3.12. 

Table 3.12  Sewage Water Line Sizing Results Summary 

Service  Process  Volumetric  Fluid  Line  Fluid   Fluid  Line  Line   Line Status
Fluid  Flow Rate  Temperature  Pressure Density  Viscosity ID  Velocity  Pressure 
Drop 
                          
3 3
‐  ‐  (m /hr)  (°C)  (barg)  (Kg/m )  (cp)  (Inches) (m/s)  (bar/100m) ‐ 
Waste 
Liquid  114  30  4  1004  0.8  6  1.7  0.2  Okay 
Water 

 
Annexure-A
Nitrogen Simulation Model Scenario I
Annexure-B
Nitrogen Simulation Model Scenario II
Annexure-C
Hydrogen Simulation Model
Annexure-D
Protective Gas (N2 + H2) Simulation Model
Annexure-E
Natural Gas Simulation Model
Annexure-F
Compressed Air Simulation Model
Annexure-G
Saturated Steam Simulation Model
Annexure-H
Desalination / Demineralized Water Simulation Model
Demin Water Simulation Model
P-100

1 2

q-1

1
Temperature 30.00 C
Pressure 6.000 bar_g
Actual Liquid Flow 34.80 m3/h

Thu Mar 08 22:08:44 2018 Case: Simulation_ Demin Water.hsc Flowsheet: Case (Main)
Annexure-I
Cooling Recycle Water Simulation Model
Cooling Water Simulation Model

P-100

1 2

q-1

1
Temperature 30.00 C
Pressure 5.000 bar_g
Actual Liquid Flow 997.0 m3/h

Thu Mar 08 22:15:15 2018 Case: Simulation_ Cooling Water.hsc Flowsheet: Case (Main)
Annexure-J
Hot Water Simulation Model
Hot Water Simulation Model

P-100

1 2

q-1
1
Temperature 90.00 C
Pressure 2.500 bar_g
Actual Liquid Flow 43.83 m3/h

Thu Mar 08 22:16:51 2018 Case: Simulation_ Hot Water.hsc Flowsheet: Case (Main)
Annexure-K
Potable Water Simulation Model
Potable Water Simulation Model

P-100

1 2

q-1
1
Temperature 30.00 C
Pressure 4.000 bar_g
Actual Liquid Flow 16.01 m3/h

Thu Mar 08 22:18:44 2018 Case: Simulation_ Potable Water.hsc Flowsheet: Case (Main)
Annexure-L
Sewage Waste Water Simulation Model
Waste Water Simulation Model

P-100

1 2

q-1
1
Temperature 30.00 C
Pressure 4.000 bar_g
Actual Liquid Flow 114.0 m3/h

Thu Mar 08 22:20:23 2018 Case: Simulation_ Waste Water.hsc Flowsheet: Case (Main)