Project Design Options (Summary)

Form Number: F 001 002


Issue Number: 02
Date: August 2012

Support Level Information from What You Get What You Don’t Get Contractual Warranty Costs
Client
Technical Support Description of Typical solutions Any form of None No cost
problem Selection of anchor contractual warranty
Geometry of site size/type based on Site specific design
Ground water details given data PS1
Soil type and details Data sheets
Loads/factors of Quotation
safety (if specified)
Life expectancy
Project timescale
Previous site history
Photographs (when
available)
Project Concept As above plus all As above plus: Engineer’s site visit None Subject to negotiation
other relevant site Project Concept and soil investigation at time of
information including Non-geotechnical engagement however
reinforcement layout design usually free of charge
and type PS1
CAD drawings for
reinforced walls and
slopes
Initial calculations
Sketches (if
appropriate)
3rd Party Design As above plus all Tailored to clients Defined in Defined in Defined in
other relevant site requirements engagement engagement engagement
information documentation document documentation

Page 1 of 2
Project Design Options (Summary)
Form Number: F 001 002
Issue Number: 02
Date: August 2012

I have read this document and require support at the following level: Support Level Tick
Technical Support
Project Concept
3rd Party Design

Job Description: Cirtex Job ID:

Name:

Company:

Signature:

Date: