DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

INDEX NOTES:
PLANT TRUE 1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
SHEET SHEET TITLE REV 00 REV 01A E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
NORTH NORTH KEYPLAN AREA REV 00A 2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
FS1 KEYPLAN & INDEX - 05/26/20 09/10/20 03/08/21 1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
001 - UNIT T83-81 NGL FRACTIONATION SYSTEM 1 05/26/20 09/10/20 03/08/21 OTHERWISE. COORDINATES ARE IN METERS
4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
22.5^ UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
002 - UNIT T83-81 NGL FRACTIONATION SYSTEM 2 05/26/20 09/10/20 03/08/21 DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
AH 003 UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
3 05/26/20 09/10/20 03/08/21 6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
MAKK
- UNIT T83-81 NGL FRACTIONATION SYSTEM
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
01 004 UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
4 03/08/21 7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
- UNIT T83-81 NGL FRACTIONATION SYSTEM HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
005
- UNIT T83-81 NGL FRACTIONATION SYSTEM 5 03/08/21 9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
006
- UNIT T83-81 NGL FRACTIONATION SYSTEM 6 03/08/21 (SECONDARY ROUTE) UP TO THE JUNCTION BOX.
01A
02 LEGEND
01A
PREVAILING FLAG FOR UNDER GROUND ROUTE (TRENCH)
UNIT NAME
WIND DESIGNATION
SEQUENCE NUMBER
TXX-IT-YYYY
W- D- WIDTH AND DEPTH
B.O.T EL_____ ELEVATION (B.O.T)

FLAG FOR UNDER GROUND ROUTE (DUCT BANK)


03 UNIT NAME
DESIGNATION
SEQUENCE NUMBER
TXX-IDB-YYYY
W- D- WIDTH AND DEPTH
B.O.T EL_________ ELEVATION (B.O.T)
x-y NUMBER OF CONDUITS ROWS/COLUMNS
z DIAMETER OF CONDUITS

L1 LEVEL 1 SIGNALS DUCT

L2 LEVEL 2 SIGNALS DUCT

S SPARE DUCT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
000X = SEQ. NUMBER

x x DUCT BANK ROUTING SECTION 01A


REFERENCE DRAWINGS
ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735

JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1 CE-256635

DUCT BANK, CABLE TRENCH & LIGHTING. CB-790879-010

INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727

INSTALLATION MOUNTING DETAILS CA-793472

PLANT
NORTH TRUE
NORTH

01A

THIS DRAWING

5 KEY PLAN

01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU

00 9/10/20 ISSUED FOR CONSTRUCTION WITH HOLDS VEM PHC MVT

00A 05/26/20 ISSUED FOR REVIEW RML PHC ALI

REV DATE DESCRIPTION BY CHK APP

SCALE:

REVISION VALIDATION

6 THIS REVISION NO.01A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-029
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MAM WAB WAB RAR
03/08/21 03/08/21 03/08/21 03/08/21

REV.NO. DATE REVISION DESCRIPTION

01A 03/08/21
ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

INSTRUMENT CABLE PLAN IPL


UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
UNIT T83-81 NGL FRACTIONATION SYSTEM

TANAJIB SAUDI ARABIA


PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

T83 J CA-256619 FS1 01A

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

NOTES:
1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE. COORDINATES ARE IN METERS
4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
MATCHLINE N 11552.000 HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
01A 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
E 10129.861 E 10170.049
N 11549.508 N 11549.508 LEGEND
FLAG FOR UNDER GROUND ROUTE (TRENCH)
UNIT NAME
DESIGNATION
T83-80-URS-1005 SEQUENCE NUMBER
T83-80-URS-1002 TXX-IT-YYYY
T83-IT-0001 WIDTH AND DEPTH
W- D-
W-500 D-1000
T83-IT-0001 T83-IT-0001 B.O.T EL_____ ELEVATION (B.O.T)
B.O.T EL+99.000
W-500 D-1000 T83-IT-0002 W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000 FLAG FOR UNDER GROUND ROUTE (DUCT BANK)
W-500 D-1000
UNIT NAME
T83-IDB-0008 B.O.T EL+99.000
T83-80-URS-1002 DESIGNATION
W-800 D-580 SEQUENCE NUMBER
E 10150.842
B.O.D EL+98.710 N 11543.300 T83-80-URS-1004 TXX-IDB-YYYY
E 10170.049
2-3 T83-IDB-0007 W- D- WIDTH AND DEPTH
N 11543.300
T83-IT-0001 6 W-465 D-465 B.O.T EL_________ ELEVATION (B.O.T)
W-500 D-1000 B.O.D EL+98.685 x-y NUMBER OF CONDUITS ROWS/COLUMNS
B.O.T EL+99.000 2-2 z DIAMETER OF CONDUITS
2 2 4 1 1
L1 LEVEL 1 SIGNALS DUCT

E 10150.842 E 10170.049
N 11541.300 N 11541.300 L2 LEVEL 2 SIGNALS DUCT

T83-IT-0001 S SPARE DUCT


W-500 D-1890

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
B.O.T EL+98.110 URS = UNDERGROUND ROUTING SECTION
T83-80-URS-000X

MATCHLINE E 10189.000
MATCHLINE E 10126.780

000X = SEQ. NUMBER


E 10129.861
N 11536.062
x x DUCT BANK ROUTING SECTION 01A
REFERENCE DRAWINGS
T83-IDB-0006 ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735
W-800 D-580 JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1 CE-256635
B.O.D EL+98.110
DUCT BANK, CABLE TRENCH & LIGHTING. CB-790879-010
2-3
6 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727
T83-OME-004 INSTALLATION MOUNTING DETAILS CA-793472

3 3

E 10129.861
N 11528.247
PLANT
SECTION 5 NORTH TRUE
NORTH

T83-IDB-0009
W-800 D-580
B.O.D EL+98.708
T83-IT-0003
2-3 E 10152.340
W-500 D-1000 N 11523.000
6
B.O.T EL+99.000

THIS DRAWING
5 5
E 10152.340
T83-IDB-0002 N 11521.441
W-800 D-580
B.O.D EL+97.960 T83-IT-0005 T83-80-URS-1010
2-3 W-500 D-1000
E 10133.268 6 B.O.T EL+99.000 01A
N 11517.103
E 10152.340
4 T83-80-URS-1008 N 11517.103

4
E 10129.861 E 10136.385 E 10137.385
N 11517.103
T83-IT-0003
N 11517.103 N 11517.103
T83-IT-0004 MATCHLINE N 11516.435
W-500 D-1000 W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000
FOR CONT. SEE DWG. CA-256619-002

KEY PLAN

01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU

00 09/10/20 ISSUED FOR CONSTRUCTION WITH HOLDS VEM PHC MVT

DETAIL "A" 00A 05/26/20 ISSUED FOR REVIEW RML PHC ALI
01A REV DATE DESCRIPTION BY CHK APP
LAYING DOWN OF MULTICABLE
L1 AND L2 CABLES IN A SAME TRENCH
FINISHED GRADE
OR PAVIMENT LEVEL 0 1.0 2.0 3.0 4.0 5.0 10.0

METERS

1 : 100M
SCALE:
SEE BELOW NOTE 1

610 (NOTE 3)

S S CL L1 S S CL L1 S S CL L1 S S CL L1 S S CL REVISION VALIDATION
1000 (TYP.)

THIS REVISION NO.01A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

L1 L2 CL L1 L1 L2 CL L1 L1 L2 CL L1 L1 L2 CL L1 L1 L2 CL REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

PROTECTION 10-09003-0004-029
TILES
(TYP.) DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
300 Min

L1 CABLES L2 CABLES T83-IDB-0007 T83-IDB-0008 T83-IDB-0006 T83-IDB-0002 T83-IDB-0009 ENGG./DATE


(DESIGN AGENCY)
CERTIFIED BY/DATE
REQUIRED
CONST. AGENCY/DATE
(SAUDI ARAMCO)
OPERATIONS/DATE BY/DATE
SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 MAM WAB WAB RAR

PVC 4" PVC 6" PVC 6" PVC 6" PVC 6" 03/08/21 03/08/21 03/08/21 03/08/21
Y

CLEAN SAND
REV.NO. DATE REVISION DESCRIPTION
FILLING
150

01A 03/08/21
ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO.
100 X X 100 THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
150 MIN
X=IT DEPENDS ON THE QUANTITY AND
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST SAUDI ARABIAN OIL COMPANY
PLUS 20% OF SPARE FOR THE CLIENT DRAWING TYPE

1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE INSTRUMENT CABLE PLAN IPL
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES
DEFINED IN CABLE LIST UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
2. UNSCALED DETAIL.
3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874
UNIT T83-81 NGL FRACTIONATION SYSTEM
FOR CABLES OF 600V AND BELOW.
TANAJIB SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

T83 J CA-256619 001 01A

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

NOTES:
1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE. COORDINATES ARE IN METERS
4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
E 10152.340 MATCHLINE N 11516.435 7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
N 11516.103 HORNS LOCATED AT THE END OF THE TRENCH.
FOR CONT. SEE DWG. CA-256619-001 8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
T83-IDB-0003 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
W-800 D-580
01A 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
B.O.D EL+97.960
2-3
LEGEND
T83-IDB-0014 FLAG FOR UNDER GROUND ROUTE (TRENCH)
6
W-800 D-580 UNIT NAME
1 1 B.O.D EL+97.720 T83-IT-0007 DESIGNATION
E 10152.340 SEQUENCE NUMBER
N 11512.395 2-3 W-500 D-1000
TXX-IT-YYYY
6 B.O.T EL+99.000 WIDTH AND DEPTH
W- D-
E 10174.942 B.O.T EL_____ ELEVATION (B.O.T)
4 E 10179.741
N 11510.429
N 11510.429
01A
FLAG FOR UNDER GROUND ROUTE (DUCT BANK)
UNIT NAME
4 DESIGNATION
T83-IT-0006 E 10152.340 T83-IT-0007 SEQUENCE NUMBER
N 11508.771 E 10171.125 E 10178.416 TXX-IDB-YYYY
W-500 D-1000 W-500 D-1000
N 11510.429 N 11510.429
B.O.T EL+99.000 W- D- WIDTH AND DEPTH
B.O.T EL+99.000
B.O.T EL_________ ELEVATION (B.O.T)
x-y NUMBER OF CONDUITS ROWS/COLUMNS
z DIAMETER OF CONDUITS

T83-80-URS-1015 L1 LEVEL 1 SIGNALS DUCT

L2 LEVEL 2 SIGNALS DUCT


T83-80-URS-1012
S SPARE DUCT
T83-IT-0007

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
W-500 D-1000
T83-IT-0006 B.O.T EL+99.000 T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION

W-500 D-1000 000X = SEQ. NUMBER

B.O.T EL+99.000 T83-IDB-0004


W-800 D-580 x x
B.O.D EL+97.720
DUCT BANK ROUTING SECTION 01A
2-3
REFERENCE DRAWINGS
6
T83-IT-0006 ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735

MATCHLINE E 10147.528
W-500 D-1000 JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1 CE-256635
2
B.O.T EL+99.000
CB-790879-010

MATCHLINE E 10180.867
DUCT BANK, CABLE TRENCH & LIGHTING.
E 10160.615 T83-IT-0007 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727
N 11497.440 2
E 10162.605 W-500 D-1000
N 11497.440 E 10167.080 INSTALLATION MOUNTING DETAILS CA-793472
N 11497.440 B.O.T EL+99.000

T83-IT-0007 E 10171.125
W-500 D-1000 N 11495.303
B.O.T EL+99.000
T83-80-URS-1016 E 10174.462
N 11492.861

T83-IT-0007 T83-IT-0007
W-500 D-1000 W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000
PLANT
NORTH TRUE
E 10174.462 NORTH

N 11490.090

THIS DRAWING

T83-IDB-0005
W-800 D-580
B.O.D EL+98.415
2-3
6

3 3

KEY PLAN

01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU

00 9/10/20 ISSUED FOR CONSTRUCTION WITH HOLDS VEM PHC MVT

DETAIL "A" 00A 05/26/20 ISSUED FOR REVIEW RML PHC ALI
01A REV DATE DESCRIPTION BY CHK APP
LAYING DOWN OF MULTICABLE
L1 AND L2 CABLES IN A SAME TRENCH
FINISHED GRADE
OR PAVIMENT LEVEL MATCHLINE N 11471.794 0 1.0 2.0 3.0 4.0 5.0 10.0

FOR CONT. SEE DWG. CA-256619-003 METERS

1 : 100M
SCALE:
SEE BELOW NOTE 1

610 (NOTE 3)

REVISION VALIDATION
1000 (TYP.)

THIS REVISION NO.01A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

PROTECTION 10-09003-0004-029
TILES
(TYP.) DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
300 Min

L1 S S CL L1 S S CL L1 S S CL L1 S S CL (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)


L1 CABLES L2 CABLES ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MAM WAB WAB RAR
03/08/21 03/08/21 03/08/21 03/08/21
L1 L1 L2 CL L1 L1 L2 CL L1 L1 L2 CL L1 L1 L2 CL
Y

CLEAN SAND
REV.NO. DATE REVISION DESCRIPTION
FILLING
01A
150

01A 03/08/21
ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO.
100 X X 100 T83-IDB-0003 T83-IDB-0004 T83-IDB-0005 T83-IDB-0014 10-09003-0004
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION UNTIL CERTIFIED AND DATED
150 MIN
SECTION 1 SECTION 2 SECTION 3 SECTION 4
X=IT DEPENDS ON THE QUANTITY AND
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST
PVC 6" PVC 6" PVC 6" PVC 6" SAUDI ARABIAN OIL COMPANY
PLUS 20% OF SPARE FOR THE CLIENT DRAWING TYPE

1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE INSTRUMENT CABLE PLAN IPL
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES
DEFINED IN CABLE LIST UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
2. UNSCALED DETAIL.
3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874
UNIT T83-81 NGL FRACTIONATION SYSTEM
FOR CABLES OF 600V AND BELOW.
TANAJIB SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

T83 J CA-256619 002 01A

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

NOTES:
1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
T83-IDB-0005
OTHERWISE. COORDINATES ARE IN METERS
W-800 D-580 4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
B.O.D EL+98.415 UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
MATCHLINE N 11471.794 2-3 DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
FOR CONT. SEE DWG. CA-256619-002 6 5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
2 2 HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
E 10174.462 9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
N 11468.619 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
01A 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
LEGEND
FLAG FOR UNDER GROUND ROUTE (TRENCH)
UNIT NAME
DESIGNATION
SEQUENCE NUMBER
TXX-IT-YYYY
T83-IT-0012 W- D- WIDTH AND DEPTH
W-500 D-1000 B.O.T EL_____ ELEVATION (B.O.T)
B.O.T EL+99.000
FLAG FOR UNDER GROUND ROUTE (DUCT BANK)
UNIT NAME
DESIGNATION
SEQUENCE NUMBER
TXX-IDB-YYYY
W- D- WIDTH AND DEPTH
B.O.T EL_________ ELEVATION (B.O.T)
E 10174.461 x-y
N 11460.211 NUMBER OF CONDUITS ROWS/COLUMNS
z DIAMETER OF CONDUITS

L1 LEVEL 1 SIGNALS DUCT

L2 LEVEL 2 SIGNALS DUCT

T83-IDB-0010
S SPARE DUCT
W-800 D-580
L1 S S CL L1 S S CL L1 S S CL

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
B.O.D EL+98.810
2-3 T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION

L1 L1 L2 L1 L1 L2 L1 L1 L2 6 000X = SEQ. NUMBER


CL CL CL
x x DUCT BANK ROUTING SECTION 01A
T83-IDB-0001 T83-IDB-0005 T83-IDB-0010 T83-EDG-067
REFERENCE DRAWINGS
SECTION 1 SECTION 2 SECTION 3
PVC 6" PVC 6" PVC 6" ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735

JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1 CE-256635

DUCT BANK, CABLE TRENCH & LIGHTING. CB-790879-010


3 3 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727
E 10157.650
N 11448.171 INSTALLATION MOUNTING DETAILS CA-793472

E 10160.010
N 11448.211 T83-IT-0008 E 10174.461
W-500 D-1000 N 11447.211
T83-IT-0009 B.O.T EL+99.000
W-500 D-1000
T83-80-URS-1020
B.O.T EL+99.000 T83-IT-0010
W-500 D-1000
E 10174.461

MATCHLINE E 10178.000
B.O.T EL+99.000
N 11445.599

MATCHLINE E 10149.864
T83-80-URS-1021 E 10160.010 PLANT
NORTH TRUE
NORTH
N 11443.855

T83-IT-0009
T83-IT-0010
W-500 D-1000
W-500 D-1000
B.O.T EL+99.000
B.O.T EL+99.000

T83-80-URS-1022 THIS DRAWING


DETAIL "A"
01A E 10157.650 T83-80-URS-1019
LAYING DOWN OF MULTICABLE N 11438.228
L1 AND L2 CABLES IN A SAME TRENCH
FINISHED GRADE
OR PAVIMENT LEVEL
T83-IDB-0001 1 1
W-800 D-580
B.O.D EL+97.920 T83-IT-0008
2-3 W-500 D-1000
6 B.O.T EL+99.000
SEE BELOW NOTE 1

610 (NOTE 3)
1000 (TYP.)

E 10157.650
N 11435.423
PROTECTION
TILES
(TYP.)
300 Min

L1 CABLES L2 CABLES
T83-IT-0011
W-500 D-1000
Y

CLEAN SAND
FILLING B.O.T EL+99.000
KEY PLAN
150

100 X X 100

150 MIN 01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU
X=IT DEPENDS ON THE QUANTITY AND
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST 00 9/10/20 ISSUED FOR CONSTRUCTION WITH HOLDS VEM PHC MVT
PLUS 20% OF SPARE FOR THE CLIENT
00A 05/26/20 ISSUED FOR REVIEW RML PHC ALI
1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES T83-IT-0011 REV DATE DESCRIPTION BY CHK APP
DEFINED IN CABLE LIST
2. UNSCALED DETAIL. W-500 D-1000
B.O.T EL+99.000
3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874 0 1.0 2.0 3.0 4.0 5.0 10.0
FOR CABLES OF 600V AND BELOW.
E 10157.650 METERS
N 11422.653
1 : 100M
SCALE:

REVISION VALIDATION

THIS REVISION NO.01A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09003-0004-029
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
T83-80-URS-1024 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MAM WAB WAB RAR
03/08/21 03/08/21 03/08/21 03/08/21

REV.NO. DATE REVISION DESCRIPTION

T83-IT-0011 01A 03/08/21


ISSUED FOR CONSTRUCTION
01A W-500 D-1000
JOB ORDER/EWO NO.
B.O.T EL+99.000 THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SEE NOTE 9
Conection with aboveground routing
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
see DWG T83-J-IPL-CA-256727-022
INSTRUMENT CABLE PLAN IPL
E 10152.829
N 11413.037 UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST

E 10149.903 UNIT T83-81 NGL FRACTIONATION SYSTEM


N 11413.037
T83-IT-0011
MATCHLINE N 11411.795 TANAJIB SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
W-500 D-1000
B.O.T EL+99.000 CA-256619 003 01A
T83 J
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

MATCHLINE N 11278.500 NOTES:


1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE. COORDINATES ARE IN METERS
4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
E 10087.931 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
N 11257.328 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
T83-IDB-0011 (SECONDARY ROUTE) UP TO THE JUNCTION BOX.
W-431 D-266
B.O.D EL+97.934
LEGEND
FLAG FOR UNDER GROUND ROUTE (TRENCH)
E 10087.931 1-2
E 10231.981 UNIT NAME
N 11248.720 E 10226.406 4 N 11249.303 DESIGNATION
E 10225.301
T83-IT-0017 E 10124.519 N 11249.303 N 11249.303 SEQUENCE NUMBER
N 11248.720 E 10235.111 TXX-IT-YYYY
W-500 D-1000 N 11249.303
B.O.T EL+99.000
SEE NOTE 7 1 W- D- WIDTH AND DEPTH
SEE NOTE 10 T83-IT-0022 B.O.T EL_____ ELEVATION (B.O.T)
1 W-500 D-1000
T83-81-URS-1001 T83-IT-0017 T83-81-URS-1003 B.O.T EL+99.000 FLAG FOR UNDER GROUND ROUTE (DUCT BANK)
W-500 D-1000 T83-IT-0022 UNIT NAME
T83-IT-0017 T83-IT-0022
B.O.T EL+99.000 W-500 D-1000 DESIGNATION
W-500 D-1000 W-500 D-1000
B.O.T EL+99.000 SEQUENCE NUMBER
B.O.T EL+99.000 B.O.T EL+99.000 TXX-IDB-YYYY
E 10235.111 W- D- WIDTH AND DEPTH
E 10124.519 N 11243.849 B.O.T EL_________ ELEVATION (B.O.T)
N 11246.333 x-y NUMBER OF CONDUITS ROWS/COLUMNS
T83-IT-0022
SEE NOTE 10 z DIAMETER OF CONDUITS
W-500 D-1000
B.O.T EL+99.000
L1 LEVEL 1 SIGNALS DUCT

SEE NOTE 7 E 10234.611


N 11242.655 L2 LEVEL 2 SIGNALS DUCT

T83-IT-0022
W-500 D-1000 S SPARE DUCT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
B.O.T EL+99.000
MATCHLINE E 10083.000

MATCHLINE E 10248.985
T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
E 10241.151
N 11228.052 000X = SEQ. NUMBER
E 10234.611
N 11228.052
x x DUCT BANK ROUTING SECTION
T83-IT-0022
W-500 D-1000
B.O.T EL+99.000 REFERENCE DRAWINGS
ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735

JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1 CE-256635

DUCT BANK, CABLE TRENCH & LIGHTING. CB-790879-010

INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727

INSTALLATION MOUNTING DETAILS CA-793472

PLANT
NORTH TRUE
NORTH

T83-IT-0021
W-500 D-1000 T83-IDB-0012 T83-IT-0021
B.O.T EL+99.000 W-431 D-440 W-500 D-1000
B.O.D EL+98.260 B.O.T EL+99.000
T83-IT-0021 E 10205.340 1-2
N 11177.576 4 E 10241.356
W-500 D-1000
N 11179.020
B.O.T EL+99.000 SEE NOTE 7
2 E 10241.356 THIS DRAWING
T83-IT-0016 N 11176.719
W-500 D-1000 2
E 10201.534 T83-81-URS-1006
B.O.T EL+99.000 SEE NOTE 7 E 10101.604 N 11177.576
N 11170.109 E 10211.557
E 10089.022 E 10207.734 N 11176.719 T83-IT-0021
N 11170.109 T83-IT-0016
N 11176.719 W-500 D-1000
W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000
T83-81-URS-1004 T83-IT-0021
SEE NOTE 10 W-500 D-1000
B.O.T EL+99.000 E 10225.536
E 10129.315 N 11176.719
T83-IT-0016 N 11166.303
W-500 D-1000
E 10106.720 KEY PLAN
B.O.T EL+99.000
N 11166.303

MATCHLINE N 11157.344
FOR CONT. SEE DWG. T83-J-IPL-CA-256619-005 01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU
DETAIL "A" REV DATE DESCRIPTION BY CHK APP

LAYING DOWN OF MULTICABLE


L1 AND L2 CABLES IN A SAME TRENCH
FINISHED GRADE 0 5.0 10.0 15.0 20.0 25.0

OR PAVIMENT LEVEL
METERS

SCALE: 1 : 250M

REVISION VALIDATION
SEE BELOW NOTE 1

610 (NOTE 3)

THIS REVISION NO.01A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


1000 (TYP.)

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

L1 S CL L1 S CL 10-09003-0004-029
PROTECTION DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
TILES (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
(TYP.)
300 Min

L1 CABLES L2 CABLES T83-IDB-0011 T83-IDB-0012 ENGG./DATE


MAM
CERTIFIED BY/DATE
WAB
CONST. AGENCY/DATE
WAB
OPERATIONS/DATE
RAR
BY/DATE

SECTION 1 SECTION 2 03/08/21 03/08/21 03/08/21 03/08/21

PVC 4" PVC 4" REV.NO. DATE REVISION DESCRIPTION


Y

CLEAN SAND
FILLING
01A 03/08/21
ISSUED FOR CONSTRUCTION
150

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR

100 X X 100
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

150 MIN
X=IT DEPENDS ON THE QUANTITY AND
SAUDI ARABIAN OIL COMPANY
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST
INSTRUMENT CABLE PLAN
DRAWING TYPE

IPL
PLUS 20% OF SPARE FOR THE CLIENT
1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
DEFINED IN CABLE LIST
2. UNSCALED DETAIL. UNIT T83-81 NGL FRACTIONATION SYSTEM
3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874 TANAJIB SAUDI ARABIA
FOR CABLES OF 600V AND BELOW.
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

T83 J CA-256619 004 01A

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

NOTES:
1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE. COORDINATES ARE IN METERS
MATCHLINE N 11157.344 4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
FOR CONT. SEE DWG. T83-J-IPL-CA-256619-004 DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
LEGEND
FLAG FOR UNDER GROUND ROUTE (TRENCH)
UNIT NAME
DESIGNATION
SEQUENCE NUMBER
TXX-IT-YYYY
W- D- WIDTH AND DEPTH
B.O.T EL_____ ELEVATION (B.O.T)

FLAG FOR UNDER GROUND ROUTE (DUCT BANK)


UNIT NAME
DESIGNATION
SEQUENCE NUMBER
TXX-IDB-YYYY
W- D- WIDTH AND DEPTH
B.O.T EL_________ ELEVATION (B.O.T)
x-y NUMBER OF CONDUITS ROWS/COLUMNS
z DIAMETER OF CONDUITS

L1 LEVEL 1 SIGNALS DUCT

L2 LEVEL 2 SIGNALS DUCT

S SPARE DUCT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
T83-IT-0020 T83-IT-0020 000X = SEQ. NUMBER
W-500 D-1000 W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000 x
x DUCT BANK ROUTING SECTION
T83-IT-0020
W-500 D-1000 REFERENCE DRAWINGS

MATCHLINE E 10248.985
E 10219.874
N 11106.553 B.O.T EL+99.000
E 10241.401 ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735
N 11103.351 CE-256635
SEE NOTE 10 JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1
MATCHLINE E 10083.000

DUCT BANK, CABLE TRENCH & LIGHTING. CB-790879-010


E 10222.772
N 11106.553 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727
T83-81-URS-1008 INSTALLATION MOUNTING DETAILS CA-793472
E 10226.823 SEE NOTE 7
N 11103.351

T83-IT-0020 E 10241.401
W-500 D-1000 N 11097.851
SEE NOTE 10 B.O.T EL+99.000

T83-IT-0015
W-500 D-1000
B.O.T EL+99.000
PLANT
E 10104.912 NORTH TRUE
NORTH
N 11084.225

SEE NOTE 7
E 10088.986
N 11079.119 E 10114.673
N 11084.225

T83-IT-0015
T83-81-URS-1007 W-500 D-1000
B.O.T EL+99.000

E 10104.912
T83-IT-0015 N 11079.119
W-500 D-1000
B.O.T EL+99.000

THIS DRAWING
T83-IT-0019
T83-IT-0019
W-500 D-1000
W-500 D-1000
B.O.T EL+99.000 E 10241.473
B.O.T EL+99.000 N 11052.739
SEE NOTE 7
SEE NOTE 10
KEY PLAN
T83-81-URS-1009
E 10207.361
N 11051.401 E 10241.473
N 11051.401

01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU

MATCHLINE N 11043.506 REV DATE DESCRIPTION BY CHK APP


FOR CONT. SEE DWG. T83-J-IPL-CA-256619-006
DETAIL "A"
0 5.0 10.0 15.0 20.0 25.0
LAYING DOWN OF MULTICABLE
L1 AND L2 CABLES IN A SAME TRENCH METERS

FINISHED GRADE
OR PAVIMENT LEVEL SCALE:
1 : 250M

REVISION VALIDATION

THIS REVISION NO.01A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
SEE BELOW NOTE 1

610 (NOTE 3)

10-09003-0004-029
1000 (TYP.)

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
PROTECTION MAM WAB WAB RAR
TILES 03/08/21 03/08/21 03/08/21 03/08/21
(TYP.)
300 Min

REV.NO. DATE REVISION DESCRIPTION


L1 CABLES L2 CABLES 01A 03/08/21
ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO.
Y

CLEAN SAND THIS REVISION IS NOT TO BE USED FOR


FILLING 10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
150

SAUDI ARABIAN OIL COMPANY


100 X X 100 DRAWING TYPE

INSTRUMENT CABLE PLAN IPL


150 MIN
X=IT DEPENDS ON THE QUANTITY AND
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
PLUS 20% OF SPARE FOR THE CLIENT
1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE UNIT T83-81 NGL FRACTIONATION SYSTEM
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES
DEFINED IN CABLE LIST TANAJIB SAUDI ARABIA
2. UNSCALED DETAIL.
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874


FOR CABLES OF 600V AND BELOW. T83 J CA-256619 005 01A

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

MATCHLINE N 11043.506 NOTES:


1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
FOR CONT. SEE DWG. T83-J-IPL-CA-256619-005 E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE. COORDINATES ARE IN METERS
4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
T83-IT-0014 7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
W-500 D-1000 HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
B.O.T EL+99.000
9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
T83-IT-0014 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
W-500 D-1000
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
B.O.T EL+99.000 E 10120.550
N 11016.092
LEGEND
FLAG FOR UNDER GROUND ROUTE (TRENCH)
E 10104.912 SECTION 1 UNIT NAME
N 11016.092 DESIGNATION
SEQUENCE NUMBER
TXX-IT-YYYY
T83-IT-0014 E 10120.550 W- D- WIDTH AND DEPTH
W-500 D-1000 N 11014.965 B.O.T EL_____ ELEVATION (B.O.T)
B.O.T EL+99.000
FLAG FOR UNDER GROUND ROUTE (DUCT BANK)
SEE NOTE 7 SEE NOTE 10
UNIT NAME
DESIGNATION
SEQUENCE NUMBER
E 10104.912 TXX-IDB-YYYY
N 10998.464
W- D- WIDTH AND DEPTH
E 10090.238 T83-81-URS-1010 B.O.T EL_________ ELEVATION (B.O.T)
N 10998.464 x-y
E 10206.336 NUMBER OF CONDUITS ROWS/COLUMNS
N 10991.603 z DIAMETER OF CONDUITS

T83-IT-0014 T83-IT-0014
W-500 D-1000 SEE NOTE 10 L1 LEVEL 1 SIGNALS DUCT
W-500 D-1000
B.O.T EL+99.000 T83-IT-0018
B.O.T EL+99.000
W-500 D-1000
B.O.T EL+99.000
L2 LEVEL 2 SIGNALS DUCT
E 10088.185 E 10090.238
N 10992.427 N 10992.427 E 10241.011
E 10206.336
N 10985.632 S SPARE DUCT
T83-IT-0014 N 10984.387 T83-81-URS-1011

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
W-500 D-1000 T83-IT-0018
T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
B.O.T EL+99.000 W-500 D-1000
SEE NOTE 7 000X = SEQ. NUMBER
B.O.T EL+99.000
MATCHLINE E 10083.000

T83-IT-0018 x
E 10241.011 x DUCT BANK ROUTING SECTION
W-500 D-1000 N 10984.387
B.O.T EL+99.000

MATCHLINE E 10248.985
REFERENCE DRAWINGS
ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735

JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1 CE-256635

DUCT BANK, CABLE TRENCH & LIGHTING. CB-790879-010

INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727

INSTALLATION MOUNTING DETAILS CA-793472

PLANT
NORTH TRUE
NORTH

SEE NOTE 10

T83-IT-0013
W-500 D-1000
B.O.T EL+99.000

E 10113.782
T83-IT-0013 N 10932.506
W-500 D-1000
B.O.T EL+99.000
E 10089.200 E 10111.418
N 10926.075 E 10096.789
SEE NOTE 7 N 10932.506
N 10923.572
T83-IT-0013
W-500 D-1000
B.O.T EL+99.000
T83-81-URS-1013 E 10111.418
N 10922.352

E 10092.182 T83-IT-0013
N 10923.572 W-500 D-1000
T83-IT-0013
W-500 D-1000 T83-IT-0013 B.O.T EL+99.000
B.O.T EL+99.000 W-500 D-1000 E 10108.902
T83-IT-0013 B.O.T EL+99.000 N 10921.268
W-500 D-1000 E 10099.956
B.O.T EL+99.000 N 10921.268
THIS DRAWING

KEY PLAN

01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU

REV DATE DESCRIPTION BY CHK APP

LAYING DOWN OF MULTICABLE


L1 AND L2 CABLES IN A SAME TRENCH 30.0
0 5.0 10.0 15.0

FINISHED GRADE
MATCHLINE N 10888.371 METERS

SCALE:
1 : 300M
OR PAVIMENT LEVEL

REVISION VALIDATION

THIS REVISION NO.01A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
SEE BELOW NOTE 1

610 (NOTE 3)

10-09003-0004-029
1000 (TYP.)

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MAM WAB WAB RAR
PROTECTION
03/08/21 03/08/21
TILES 03/08/21 03/08/21

(TYP.) REV.NO. DATE REVISION DESCRIPTION


300 Min

L1 CABLES L2 CABLES 01A 03/08/21


ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
Y

CLEAN SAND 10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED


FILLING
150

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
100 X X 100
INSTRUMENT CABLE PLAN IPL
150 MIN
X=IT DEPENDS ON THE QUANTITY AND UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST
PLUS 20% OF SPARE FOR THE CLIENT UNIT T83-81 NGL FRACTIONATION SYSTEM
1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES SAUDI ARABIA
TANAJIB
DEFINED IN CABLE LIST
2. UNSCALED DETAIL. PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874 CA-256619


T83 J 006 01A
FOR CABLES OF 600V AND BELOW.
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED SMART CADD-05


DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

UNIT T83 - 81 NGL FRACTIONATION SYSTEM

UNDERGROUND CABLE ROUTING AND CROSS SETION LIST


DOC NUMBER: T83-J-IPL-CA-256619
ATTACHMENT 1
INSTRUMENT ROUTING SECTION

ABOVEGROUND CABLEWAY U/G CABLEWAY ROUTING SECTION NAME

XXX-YY-ZZADDD XXX-YYY-DDD XXX-YRS-DDD

XXX=AREA NUMBER XXX=UNIT NUMBER XXX=UNIT NUMBER

YYY= IT= INSTRUMENT TRENCH Y= U=UNDERGROUND


YY=TRAY SERVICE
IDB=INSTRUMENT DUCT BANK A=ABOVEGROUND
L1 = HIGH TO MEDIUM NOISE SUSCEPTIBILITY DDD= SEQUENCE RS= ROUTING SECTION
L2 = LOW NOISE SUSCEPTIBILITY DDD= SEQUENCE
L3 = POWER
ZZ=UNIT NUMBER
A=TRAIN NUMBER (IF ANY)
DDD=SEQUENCE
001 to 0499 - MAIN ROUTES (LADDER)
0500 to 0999 - SECONDARY ROUTES (PERFORATED)

NOTES:

1. Only for Cable trays

Page 1 of 1
ELECTRICAL CABLE SCHEDULE
DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

UNIT T83 - 81 NGL FRACTIONATION SYSTEM

UNDERGROUND CABLE ROUTING AND CROSS SETION LIST


DOC NUMBER: T83-J-IPL-CA-256619
ATTACHMENT 1
INSTRUMENT ROUTING SECTION

SECTION CABLE NAME CABLEWAY TRAY (NOTE 1) FILL (%) (NOTE 1)

T83-80-URS-1010 T83-80-IC-0305 T83-IT-0005 0 0

T83-80-URS-1010 T83-80-IC-0303 T83-IT-0005 0 0

T83-80-URS-1010 T83-80-IC-0304 T83-IT-0005 0 0

T83-80-URS-1010 T83-80-IC-0306 T83-IT-0005 0 0

T83-80-URS-1010 T83-80-IC-0015-NC T83-IT-0005 0 0

T83-80-URS-1012 T83-80-IC-0305 T83-IT-0006 0 0

T83-80-URS-1012 T83-80-IC-0303 T83-IT-0006 0 0

T83-80-URS-1012 T83-80-IC-0304 T83-IT-0006 0 0

T83-80-URS-1012 T83-80-IC-0306 T83-IT-0006 0 0

T83-80-URS-1012 T83-80-IC-0015-NC T83-IT-0006 0 0

T83-80-URS-1015 T83-81-IC-0165-NC T83-IT-0007 0 0

T83-80-URS-1015 T83-80-IC-0005-NC T83-IT-0007 0 0

T83-80-URS-1015 T83-80-IC-0006-1-NC T83-IT-0007 0 0

T83-80-URS-1015 T83-80-IC-0327-NC T83-IT-0007 0 0

T83-80-URS-1015 T83-80-IC-0328-NC T83-IT-0007 0 0

T83-80-URS-1016 T83-81-IC-0165-NC T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0005-NC T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0305 T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0303 T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0304 T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0306 T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0006-1-NC T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0327-NC T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0015-NC T83-IT-0007 0 0

T83-80-URS-1016 T83-80-IC-0328-NC T83-IT-0007 0 0

T83-80-URS-1019 T83-80-IC-0328-NC T83-IT-0008 0 0

T83-80-URS-1019 T83-81-IC-0165-NC T83-IT-0008 0 0

T83-80-URS-1019 T83-80-IC-0305 T83-IT-0008 0 0

T83-80-URS-1019 T83-80-IC-0005-NC T83-IT-0008 0 0

T83-80-URS-1019 T83-80-IC-0303 T83-IT-0008 0 0

T83-80-URS-1019 T83-80-IC-0304 T83-IT-0008 0 0

T83-80-URS-1019 T83-80-IC-0306 T83-IT-0008 0 0

T83-80-URS-1019 T83-80-IC-0015-NC T83-IT-0008 0 0

T83-80-URS-1019 T83-80-IC-0006-1-NC T83-IT-0008 0 0

Page 1 of 2
ELECTRICAL CABLE SCHEDULE
DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473

UNIT T83 - 81 NGL FRACTIONATION SYSTEM

UNDERGROUND CABLE ROUTING AND CROSS SETION LIST


DOC NUMBER: T83-J-IPL-CA-256619
ATTACHMENT 1
INSTRUMENT ROUTING SECTION

SECTION CABLE NAME CABLEWAY TRAY (NOTE 1) FILL (%) (NOTE 1)

T83-80-URS-1019 T83-80-IC-0327-NC T83-IT-0008 0 0

T83-80-URS-1020 T83-80-IC-0309 T83-IT-0010 0 0

T83-80-URS-1020 T83-80-IC-0308 T83-IT-0010 0 0

T83-80-URS-1021 T83-80-IC-0307 T83-IT-0009 0 0

T83-80-URS-1021 T83-80-IC-0017-NC T83-IT-0009 0 0

T83-80-URS-1021 T83-81-IC-0161-1-NC T83-IT-0009 0 0

T83-80-URS-1022 T83-80-IC-0309 T83-IT-0009 0 0

T83-80-URS-1022 T83-80-IC-0307 T83-IT-0009 0 0

T83-80-URS-1022 T83-80-IC-0308 T83-IT-0009 0 0

T83-80-URS-1022 T83-80-IC-0017-NC T83-IT-0009 0 0

T83-80-URS-1022 T83-81-IC-0161-1-NC T83-IT-0009 0 0

T83-80-URS-1024 T83-80-IC-0327-NC T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0328-NC T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0309 T83-IT-0011 0 0

T83-80-URS-1024 T83-81-IC-0165-NC T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0307 T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0308 T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0303 T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0305 T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0005-NC T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0304 T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0306 T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0006-1-NC T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0017-NC T83-IT-0011 0 0

T83-80-URS-1024 T83-80-IC-0015-NC T83-IT-0011 0 0

T83-80-URS-1024 T83-81-IC-0161-1-NC T83-IT-0011 0 0

Page 2 of 2
ELECTRICAL CABLE SCHEDULE