PLANT TRUE 1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
SHEET SHEET TITLE REV 00 REV 01A E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
NORTH NORTH KEYPLAN AREA REV 00A 2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
FS1 KEYPLAN & INDEX - 05/26/20 09/10/20 03/08/21 1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
001 - UNIT T83-81 NGL FRACTIONATION SYSTEM 1 05/26/20 09/10/20 03/08/21 OTHERWISE. COORDINATES ARE IN METERS
4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
22.5^ UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
002 - UNIT T83-81 NGL FRACTIONATION SYSTEM 2 05/26/20 09/10/20 03/08/21 DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
AH 003 UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
3 05/26/20 09/10/20 03/08/21 6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
MAKK
- UNIT T83-81 NGL FRACTIONATION SYSTEM
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
01 004 UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
4 03/08/21 7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
- UNIT T83-81 NGL FRACTIONATION SYSTEM HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
005
- UNIT T83-81 NGL FRACTIONATION SYSTEM 5 03/08/21 9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
006
- UNIT T83-81 NGL FRACTIONATION SYSTEM 6 03/08/21 (SECONDARY ROUTE) UP TO THE JUNCTION BOX.
01A
02 LEGEND
01A
PREVAILING FLAG FOR UNDER GROUND ROUTE (TRENCH)
UNIT NAME
WIND DESIGNATION
SEQUENCE NUMBER
TXX-IT-YYYY
W- D- WIDTH AND DEPTH
B.O.T EL_____ ELEVATION (B.O.T)
S SPARE DUCT
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
000X = SEQ. NUMBER
PLANT
NORTH TRUE
NORTH
01A
THIS DRAWING
5 KEY PLAN
SCALE:
REVISION VALIDATION
10-09003-0004-029
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MAM WAB WAB RAR
03/08/21 03/08/21 03/08/21 03/08/21
01A 03/08/21
ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
NOTES:
1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE. COORDINATES ARE IN METERS
4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
MATCHLINE N 11552.000 HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
01A 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
E 10129.861 E 10170.049
N 11549.508 N 11549.508 LEGEND
FLAG FOR UNDER GROUND ROUTE (TRENCH)
UNIT NAME
DESIGNATION
T83-80-URS-1005 SEQUENCE NUMBER
T83-80-URS-1002 TXX-IT-YYYY
T83-IT-0001 WIDTH AND DEPTH
W- D-
W-500 D-1000
T83-IT-0001 T83-IT-0001 B.O.T EL_____ ELEVATION (B.O.T)
B.O.T EL+99.000
W-500 D-1000 T83-IT-0002 W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000 FLAG FOR UNDER GROUND ROUTE (DUCT BANK)
W-500 D-1000
UNIT NAME
T83-IDB-0008 B.O.T EL+99.000
T83-80-URS-1002 DESIGNATION
W-800 D-580 SEQUENCE NUMBER
E 10150.842
B.O.D EL+98.710 N 11543.300 T83-80-URS-1004 TXX-IDB-YYYY
E 10170.049
2-3 T83-IDB-0007 W- D- WIDTH AND DEPTH
N 11543.300
T83-IT-0001 6 W-465 D-465 B.O.T EL_________ ELEVATION (B.O.T)
W-500 D-1000 B.O.D EL+98.685 x-y NUMBER OF CONDUITS ROWS/COLUMNS
B.O.T EL+99.000 2-2 z DIAMETER OF CONDUITS
2 2 4 1 1
L1 LEVEL 1 SIGNALS DUCT
E 10150.842 E 10170.049
N 11541.300 N 11541.300 L2 LEVEL 2 SIGNALS DUCT
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
B.O.T EL+98.110 URS = UNDERGROUND ROUTING SECTION
T83-80-URS-000X
MATCHLINE E 10189.000
MATCHLINE E 10126.780
3 3
E 10129.861
N 11528.247
PLANT
SECTION 5 NORTH TRUE
NORTH
T83-IDB-0009
W-800 D-580
B.O.D EL+98.708
T83-IT-0003
2-3 E 10152.340
W-500 D-1000 N 11523.000
6
B.O.T EL+99.000
THIS DRAWING
5 5
E 10152.340
T83-IDB-0002 N 11521.441
W-800 D-580
B.O.D EL+97.960 T83-IT-0005 T83-80-URS-1010
2-3 W-500 D-1000
E 10133.268 6 B.O.T EL+99.000 01A
N 11517.103
E 10152.340
4 T83-80-URS-1008 N 11517.103
4
E 10129.861 E 10136.385 E 10137.385
N 11517.103
T83-IT-0003
N 11517.103 N 11517.103
T83-IT-0004 MATCHLINE N 11516.435
W-500 D-1000 W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000
FOR CONT. SEE DWG. CA-256619-002
KEY PLAN
DETAIL "A" 00A 05/26/20 ISSUED FOR REVIEW RML PHC ALI
01A REV DATE DESCRIPTION BY CHK APP
LAYING DOWN OF MULTICABLE
L1 AND L2 CABLES IN A SAME TRENCH
FINISHED GRADE
OR PAVIMENT LEVEL 0 1.0 2.0 3.0 4.0 5.0 10.0
METERS
1 : 100M
SCALE:
SEE BELOW NOTE 1
610 (NOTE 3)
S S CL L1 S S CL L1 S S CL L1 S S CL L1 S S CL REVISION VALIDATION
1000 (TYP.)
PROTECTION 10-09003-0004-029
TILES
(TYP.) DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
300 Min
PVC 4" PVC 6" PVC 6" PVC 6" PVC 6" 03/08/21 03/08/21 03/08/21 03/08/21
Y
CLEAN SAND
REV.NO. DATE REVISION DESCRIPTION
FILLING
150
01A 03/08/21
ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO.
100 X X 100 THIS REVISION IS NOT TO BE USED FOR
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
150 MIN
X=IT DEPENDS ON THE QUANTITY AND
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST SAUDI ARABIAN OIL COMPANY
PLUS 20% OF SPARE FOR THE CLIENT DRAWING TYPE
1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE INSTRUMENT CABLE PLAN IPL
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES
DEFINED IN CABLE LIST UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
2. UNSCALED DETAIL.
3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874
UNIT T83-81 NGL FRACTIONATION SYSTEM
FOR CABLES OF 600V AND BELOW.
TANAJIB SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
NOTES:
1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE. COORDINATES ARE IN METERS
4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
E 10152.340 MATCHLINE N 11516.435 7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
N 11516.103 HORNS LOCATED AT THE END OF THE TRENCH.
FOR CONT. SEE DWG. CA-256619-001 8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
T83-IDB-0003 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
W-800 D-580
01A 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
B.O.D EL+97.960
2-3
LEGEND
T83-IDB-0014 FLAG FOR UNDER GROUND ROUTE (TRENCH)
6
W-800 D-580 UNIT NAME
1 1 B.O.D EL+97.720 T83-IT-0007 DESIGNATION
E 10152.340 SEQUENCE NUMBER
N 11512.395 2-3 W-500 D-1000
TXX-IT-YYYY
6 B.O.T EL+99.000 WIDTH AND DEPTH
W- D-
E 10174.942 B.O.T EL_____ ELEVATION (B.O.T)
4 E 10179.741
N 11510.429
N 11510.429
01A
FLAG FOR UNDER GROUND ROUTE (DUCT BANK)
UNIT NAME
4 DESIGNATION
T83-IT-0006 E 10152.340 T83-IT-0007 SEQUENCE NUMBER
N 11508.771 E 10171.125 E 10178.416 TXX-IDB-YYYY
W-500 D-1000 W-500 D-1000
N 11510.429 N 11510.429
B.O.T EL+99.000 W- D- WIDTH AND DEPTH
B.O.T EL+99.000
B.O.T EL_________ ELEVATION (B.O.T)
x-y NUMBER OF CONDUITS ROWS/COLUMNS
z DIAMETER OF CONDUITS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
W-500 D-1000
T83-IT-0006 B.O.T EL+99.000 T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
MATCHLINE E 10147.528
W-500 D-1000 JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1 CE-256635
2
B.O.T EL+99.000
CB-790879-010
MATCHLINE E 10180.867
DUCT BANK, CABLE TRENCH & LIGHTING.
E 10160.615 T83-IT-0007 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727
N 11497.440 2
E 10162.605 W-500 D-1000
N 11497.440 E 10167.080 INSTALLATION MOUNTING DETAILS CA-793472
N 11497.440 B.O.T EL+99.000
T83-IT-0007 E 10171.125
W-500 D-1000 N 11495.303
B.O.T EL+99.000
T83-80-URS-1016 E 10174.462
N 11492.861
T83-IT-0007 T83-IT-0007
W-500 D-1000 W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000
PLANT
NORTH TRUE
E 10174.462 NORTH
N 11490.090
THIS DRAWING
T83-IDB-0005
W-800 D-580
B.O.D EL+98.415
2-3
6
3 3
KEY PLAN
DETAIL "A" 00A 05/26/20 ISSUED FOR REVIEW RML PHC ALI
01A REV DATE DESCRIPTION BY CHK APP
LAYING DOWN OF MULTICABLE
L1 AND L2 CABLES IN A SAME TRENCH
FINISHED GRADE
OR PAVIMENT LEVEL MATCHLINE N 11471.794 0 1.0 2.0 3.0 4.0 5.0 10.0
1 : 100M
SCALE:
SEE BELOW NOTE 1
610 (NOTE 3)
REVISION VALIDATION
1000 (TYP.)
PROTECTION 10-09003-0004-029
TILES
(TYP.) DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
300 Min
CLEAN SAND
REV.NO. DATE REVISION DESCRIPTION
FILLING
01A
150
01A 03/08/21
ISSUED FOR CONSTRUCTION
JOB ORDER/EWO NO.
100 X X 100 T83-IDB-0003 T83-IDB-0004 T83-IDB-0005 T83-IDB-0014 10-09003-0004
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION UNTIL CERTIFIED AND DATED
150 MIN
SECTION 1 SECTION 2 SECTION 3 SECTION 4
X=IT DEPENDS ON THE QUANTITY AND
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST
PVC 6" PVC 6" PVC 6" PVC 6" SAUDI ARABIAN OIL COMPANY
PLUS 20% OF SPARE FOR THE CLIENT DRAWING TYPE
1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE INSTRUMENT CABLE PLAN IPL
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES
DEFINED IN CABLE LIST UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
2. UNSCALED DETAIL.
3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874
UNIT T83-81 NGL FRACTIONATION SYSTEM
FOR CABLES OF 600V AND BELOW.
TANAJIB SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
NOTES:
1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
T83-IDB-0005
OTHERWISE. COORDINATES ARE IN METERS
W-800 D-580 4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
B.O.D EL+98.415 UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
MATCHLINE N 11471.794 2-3 DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
FOR CONT. SEE DWG. CA-256619-002 6 5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
2 2 HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
E 10174.462 9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
N 11468.619 INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
01A 10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
LEGEND
FLAG FOR UNDER GROUND ROUTE (TRENCH)
UNIT NAME
DESIGNATION
SEQUENCE NUMBER
TXX-IT-YYYY
T83-IT-0012 W- D- WIDTH AND DEPTH
W-500 D-1000 B.O.T EL_____ ELEVATION (B.O.T)
B.O.T EL+99.000
FLAG FOR UNDER GROUND ROUTE (DUCT BANK)
UNIT NAME
DESIGNATION
SEQUENCE NUMBER
TXX-IDB-YYYY
W- D- WIDTH AND DEPTH
B.O.T EL_________ ELEVATION (B.O.T)
E 10174.461 x-y
N 11460.211 NUMBER OF CONDUITS ROWS/COLUMNS
z DIAMETER OF CONDUITS
T83-IDB-0010
S SPARE DUCT
W-800 D-580
L1 S S CL L1 S S CL L1 S S CL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
B.O.D EL+98.810
2-3 T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
E 10160.010
N 11448.211 T83-IT-0008 E 10174.461
W-500 D-1000 N 11447.211
T83-IT-0009 B.O.T EL+99.000
W-500 D-1000
T83-80-URS-1020
B.O.T EL+99.000 T83-IT-0010
W-500 D-1000
E 10174.461
MATCHLINE E 10178.000
B.O.T EL+99.000
N 11445.599
MATCHLINE E 10149.864
T83-80-URS-1021 E 10160.010 PLANT
NORTH TRUE
NORTH
N 11443.855
T83-IT-0009
T83-IT-0010
W-500 D-1000
W-500 D-1000
B.O.T EL+99.000
B.O.T EL+99.000
610 (NOTE 3)
1000 (TYP.)
E 10157.650
N 11435.423
PROTECTION
TILES
(TYP.)
300 Min
L1 CABLES L2 CABLES
T83-IT-0011
W-500 D-1000
Y
CLEAN SAND
FILLING B.O.T EL+99.000
KEY PLAN
150
100 X X 100
150 MIN 01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU
X=IT DEPENDS ON THE QUANTITY AND
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST 00 9/10/20 ISSUED FOR CONSTRUCTION WITH HOLDS VEM PHC MVT
PLUS 20% OF SPARE FOR THE CLIENT
00A 05/26/20 ISSUED FOR REVIEW RML PHC ALI
1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES T83-IT-0011 REV DATE DESCRIPTION BY CHK APP
DEFINED IN CABLE LIST
2. UNSCALED DETAIL. W-500 D-1000
B.O.T EL+99.000
3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874 0 1.0 2.0 3.0 4.0 5.0 10.0
FOR CABLES OF 600V AND BELOW.
E 10157.650 METERS
N 11422.653
1 : 100M
SCALE:
REVISION VALIDATION
10-09003-0004-029
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
T83-80-URS-1024 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MAM WAB WAB RAR
03/08/21 03/08/21 03/08/21 03/08/21
SEE NOTE 9
Conection with aboveground routing
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
see DWG T83-J-IPL-CA-256727-022
INSTRUMENT CABLE PLAN IPL
E 10152.829
N 11413.037 UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
T83-IT-0022
W-500 D-1000 S SPARE DUCT
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
B.O.T EL+99.000
MATCHLINE E 10083.000
MATCHLINE E 10248.985
T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
E 10241.151
N 11228.052 000X = SEQ. NUMBER
E 10234.611
N 11228.052
x x DUCT BANK ROUTING SECTION
T83-IT-0022
W-500 D-1000
B.O.T EL+99.000 REFERENCE DRAWINGS
ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735
PLANT
NORTH TRUE
NORTH
T83-IT-0021
W-500 D-1000 T83-IDB-0012 T83-IT-0021
B.O.T EL+99.000 W-431 D-440 W-500 D-1000
B.O.D EL+98.260 B.O.T EL+99.000
T83-IT-0021 E 10205.340 1-2
N 11177.576 4 E 10241.356
W-500 D-1000
N 11179.020
B.O.T EL+99.000 SEE NOTE 7
2 E 10241.356 THIS DRAWING
T83-IT-0016 N 11176.719
W-500 D-1000 2
E 10201.534 T83-81-URS-1006
B.O.T EL+99.000 SEE NOTE 7 E 10101.604 N 11177.576
N 11170.109 E 10211.557
E 10089.022 E 10207.734 N 11176.719 T83-IT-0021
N 11170.109 T83-IT-0016
N 11176.719 W-500 D-1000
W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000
T83-81-URS-1004 T83-IT-0021
SEE NOTE 10 W-500 D-1000
B.O.T EL+99.000 E 10225.536
E 10129.315 N 11176.719
T83-IT-0016 N 11166.303
W-500 D-1000
E 10106.720 KEY PLAN
B.O.T EL+99.000
N 11166.303
MATCHLINE N 11157.344
FOR CONT. SEE DWG. T83-J-IPL-CA-256619-005 01A 03/08/21 ISSUED FOR CONSTRUCTION AFL PHC MSU
DETAIL "A" REV DATE DESCRIPTION BY CHK APP
OR PAVIMENT LEVEL
METERS
SCALE: 1 : 250M
REVISION VALIDATION
SEE BELOW NOTE 1
610 (NOTE 3)
L1 S CL L1 S CL 10-09003-0004-029
PROTECTION DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
TILES (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
(TYP.)
300 Min
CLEAN SAND
FILLING
01A 03/08/21
ISSUED FOR CONSTRUCTION
150
100 X X 100
10-09003-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
150 MIN
X=IT DEPENDS ON THE QUANTITY AND
SAUDI ARABIAN OIL COMPANY
NOTES: AS PER SAES-J-902 (TABLE 3) SIZE OF CABLES DEFINED IN CABLE LIST
INSTRUMENT CABLE PLAN
DRAWING TYPE
IPL
PLUS 20% OF SPARE FOR THE CLIENT
1. THIS IS A TYPICAL DIMENSION, IN SOME CASES THERE COULD BE
GREATER DEPTHS, DEPENDS ON THE QUANTITY AND SIZE OF CABLES. Y=IT DEPENDS ON THE SIZE OF CABLES UNDERGROUND CABLE ROUTING AND CROSS SECTION LIST
DEFINED IN CABLE LIST
2. UNSCALED DETAIL. UNIT T83-81 NGL FRACTIONATION SYSTEM
3. IN ACCORDANCE WITH TABLE 1 INDICATED IN DRAWING AD-036874 TANAJIB SAUDI ARABIA
FOR CABLES OF 600V AND BELOW.
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
NOTES:
1- PLANT DATUM E.10000.000 N.10000.000 EQUALS TO UTM COORDINATES
E.267448.465 N.3077346.084 BASED ON AN ALBD 1970 DATUM, ZONE-39N.
2- H.P.P (HIGH POINT PAVEMENT) ELEVATION 100.000 CORRESPONDS TO
+22.50 m BASED ON SAUDI ARAMCO VERTICAL DATUM OF 1978 (SAVD78),
1994 ADJUSTMENT.
3.- ALL DIMENSIONS AND ELEVATION ARE IN MILLIMETERS UNLESS NOTED
OTHERWISE. COORDINATES ARE IN METERS
MATCHLINE N 11157.344 4.- THE CABLES TRANSITION BETWEEN AVOBEGROUND ROUTES AND
UNDERGROUND ROUTES WILL BE THROUGH PVC STUB UP. FOR STUB UP
FOR CONT. SEE DWG. T83-J-IPL-CA-256619-004 DETAIL SEE: INSTALLATION MOUNTING DETAILS CD-793472
5.- ABOVEGROUND CABLE ROUTING ARE SHOWN IN CA-256727
6.- FOR ALL CABLE PULLING IN TRENCHES SEE DETAIL "A", TAKING INTO
ACCOUNT THE DIMENSIONS DEFINED IN EACH ONE.
7.- DEDICATED TRENCH FOR CABLES (LEVEL 1) OF GAS BEACONS AND
HORNS LOCATED AT THE END OF THE TRENCH.
8.- FOR CROSS SECTION LIST SEE ATTACHMENT 1 OF THIS DOCUMENT.
9.-CABLES CONNECT THROUGH STUB-UP TO CABLE LADDER. CONTINUE ON
INSTRUMENT MAIN CABLE ROUTING AND CROSS SECTION LIST CA-256727.
10.- CABLES CONNECTED THROUGH STUB-UP TO PERFORATED TRAY
(SECONDARY ROUTE) UP TO THE JUNCTION BOX.
LEGEND
FLAG FOR UNDER GROUND ROUTE (TRENCH)
UNIT NAME
DESIGNATION
SEQUENCE NUMBER
TXX-IT-YYYY
W- D- WIDTH AND DEPTH
B.O.T EL_____ ELEVATION (B.O.T)
S SPARE DUCT
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
T83-IT-0020 T83-IT-0020 000X = SEQ. NUMBER
W-500 D-1000 W-500 D-1000
B.O.T EL+99.000 B.O.T EL+99.000 x
x DUCT BANK ROUTING SECTION
T83-IT-0020
W-500 D-1000 REFERENCE DRAWINGS
MATCHLINE E 10248.985
E 10219.874
N 11106.553 B.O.T EL+99.000
E 10241.401 ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735
N 11103.351 CE-256635
SEE NOTE 10 JB & TERMINAL STRIPS CONN NGL FRACTIONATION TRAIN 1
MATCHLINE E 10083.000
T83-IT-0020 E 10241.401
W-500 D-1000 N 11097.851
SEE NOTE 10 B.O.T EL+99.000
T83-IT-0015
W-500 D-1000
B.O.T EL+99.000
PLANT
E 10104.912 NORTH TRUE
NORTH
N 11084.225
SEE NOTE 7
E 10088.986
N 11079.119 E 10114.673
N 11084.225
T83-IT-0015
T83-81-URS-1007 W-500 D-1000
B.O.T EL+99.000
E 10104.912
T83-IT-0015 N 11079.119
W-500 D-1000
B.O.T EL+99.000
THIS DRAWING
T83-IT-0019
T83-IT-0019
W-500 D-1000
W-500 D-1000
B.O.T EL+99.000 E 10241.473
B.O.T EL+99.000 N 11052.739
SEE NOTE 7
SEE NOTE 10
KEY PLAN
T83-81-URS-1009
E 10207.361
N 11051.401 E 10241.473
N 11051.401
FINISHED GRADE
OR PAVIMENT LEVEL SCALE:
1 : 250M
REVISION VALIDATION
610 (NOTE 3)
10-09003-0004-029
1000 (TYP.)
T83-IT-0014 T83-IT-0014
W-500 D-1000 SEE NOTE 10 L1 LEVEL 1 SIGNALS DUCT
W-500 D-1000
B.O.T EL+99.000 T83-IT-0018
B.O.T EL+99.000
W-500 D-1000
B.O.T EL+99.000
L2 LEVEL 2 SIGNALS DUCT
E 10088.185 E 10090.238
N 10992.427 N 10992.427 E 10241.011
E 10206.336
N 10985.632 S SPARE DUCT
T83-IT-0014 N 10984.387 T83-81-URS-1011
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
W-500 D-1000 T83-IT-0018
T83-80-URS-000X URS = UNDERGROUND ROUTING SECTION
B.O.T EL+99.000 W-500 D-1000
SEE NOTE 7 000X = SEQ. NUMBER
B.O.T EL+99.000
MATCHLINE E 10083.000
T83-IT-0018 x
E 10241.011 x DUCT BANK ROUTING SECTION
W-500 D-1000 N 10984.387
B.O.T EL+99.000
MATCHLINE E 10248.985
REFERENCE DRAWINGS
ELECTRONIC INSTRUMENT LAYOUT NGL FRACTIONATION TRAIN 1 CA-256735
PLANT
NORTH TRUE
NORTH
SEE NOTE 10
T83-IT-0013
W-500 D-1000
B.O.T EL+99.000
E 10113.782
T83-IT-0013 N 10932.506
W-500 D-1000
B.O.T EL+99.000
E 10089.200 E 10111.418
N 10926.075 E 10096.789
SEE NOTE 7 N 10932.506
N 10923.572
T83-IT-0013
W-500 D-1000
B.O.T EL+99.000
T83-81-URS-1013 E 10111.418
N 10922.352
E 10092.182 T83-IT-0013
N 10923.572 W-500 D-1000
T83-IT-0013
W-500 D-1000 T83-IT-0013 B.O.T EL+99.000
B.O.T EL+99.000 W-500 D-1000 E 10108.902
T83-IT-0013 B.O.T EL+99.000 N 10921.268
W-500 D-1000 E 10099.956
B.O.T EL+99.000 N 10921.268
THIS DRAWING
KEY PLAN
FINISHED GRADE
MATCHLINE N 10888.371 METERS
SCALE:
1 : 300M
OR PAVIMENT LEVEL
REVISION VALIDATION
610 (NOTE 3)
10-09003-0004-029
1000 (TYP.)
NOTES:
Page 1 of 1
ELECTRICAL CABLE SCHEDULE
DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473
Page 1 of 2
ELECTRICAL CABLE SCHEDULE
DocuSign Envelope ID: 024A5E82-113D-48B6-9216-75ABFDDA0473
Page 2 of 2
ELECTRICAL CABLE SCHEDULE